← Back
Walk-up apt, over six families with stores
805 LEXINGTON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1042039
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-8XZoning
9,452 sfGross Floor Area
14Units
Rent Stabilized4 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 805-807 EAST LLC · 2,380 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof6p · 1 filing · 19 docs
Floor 59p · 3 filings · 20 docs
Floor 49p · 3 filings · 20 docs
Floor 311p · 4 filings · 20 docs
Floor 215p · 5 filings · 20 docs
Floor 14p · 1 filing · 3 docs
Filed — no permit issued6p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 MADISON REALTY5607/08/2026
JASCO703/22/2026
805-807 EAST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/27/2023$11.2M—201 MADISON REALTY CORP. → 805-807 EAST LLC$1,180/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING1803/21/2026
MICHAEL SJ MAZZELLA RA403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHNNYS MASTER PLBG CORPPlumbing307/08/2026
GLOBAL MANAGEMENT LLCGeneral Contractor307/08/2026
JASCO, INCGeneral Contractor303/21/2026
A.M. SAGE PLG & HTG LLCPlumbing307/08/2026
RICHARD NEUElectrical203/22/2026
A J IANNI ELECL CONTS INCElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
TUCCIMAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COASTAL CONSTRUCTION SERV3827810/25/2023
JOSEPH BOTTA, PE, PC1139203/07/2023
Building Lifecycle
All (112)Filed (13)Permit Issued (10)Signed Off (6)Violation (36)Inspection (7)Objection (10)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, open)
A
07/30/2024
Signed off — Alteration
WORK PERFORMED IN CONJUNCTION WITH DOB APPLICATION 140942238 ALTERATION TYPE I TO INCLUDE CHANGE OF USE AT SECOND FLOOR. REMOVE / CAP AND REPLACE / MODIFY EXISTING PLUMBING FIXTURES AND ROUGHING AT FLOORS 2 & 3.
M08009372-I1
05/10/2024
Signed off — Alteration
CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE GAS LINES AND GAS FIXTURES AND METER. ADDITION OF THREE BATHROOM ASSEMBLIES AND THREE KITCHEN INSTALLATION TO CREATE THREE ADDITIONAL DWELLING UNITS.
M00380728-I1
04/01/2024
Violation issued (HPD, closed)
A
03/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2024
Signed off — Alteration
INSTALLATION OF MINI-SPLIT HVAC UNITS FOR UNITS 807-2R AND 807-3R. NO CHANGE OF USE, OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION
M00952851-I1
12/08/2023
Permit issued — Mechanical Systems
M00952851-I1-MS
11/22/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2023
Violation issued (HPD, closed)
I
11/02/2023
Permit issued — Plumbing
M08009372-I1-PL
10/25/2023
Filed — Alteration
INSTALLATION OF MINI-SPLIT HVAC UNITS FOR UNITS 807-2R AND 807-3R. NO CHANGE OF USE, OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION
M00952851-I1
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — Mechanical Systems
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — Maintenance information
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH FREGLETTE
10/24/2023
Special inspection requirement — Final
JOSEPH FREGLETTE
10/18/2023
Permit issued — Plumbing
M29048942-I1-PL
10/16/2023
Signed off — Alteration
INSTALLATION OF MINI-SPLIT UNITS, INCORRECTLY FILED UNDER DOB APPLICATION 08007789, AT ALL LEVELS. NO CHANGE IN USE OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
M00864183-I1
07/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/05/2023
Permit issued — Plumbing
M40280342-I1-PL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — Mechanical Systems
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH FREGLETTE
05/22/2023
Special inspection requirement — Final
JOSEPH FREGLETTE
05/19/2023
Filed — Alteration
INSTALLATION OF MINI-SPLIT UNITS, INCORRECTLY FILED UNDER DOB APPLICATION 08007789, AT ALL LEVELS. NO CHANGE IN USE OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
M00864183-P1
05/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH FREGLETTE
05/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH FREGLETTE
05/19/2023
Special inspection requirement — Mechanical Systems
JOSEPH FREGLETTE
05/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
05/19/2023
Special inspection requirement — Final
JOSEPH FREGLETTE
05/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH FREGLETTE
05/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH FREGLETTE
05/02/2023
Permit issued — Mechanical Systems
M00864183-I1-MS
04/25/2023
Filed — Alteration
INSTALLATION OF MINI-SPLIT UNITS, INCORRECTLY FILED UNDER DOB APPLICATION 08007789, AT ALL LEVELS. NO CHANGE IN USE OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
M00864183-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2023
Signed off — Alteration
M08007789-I1
03/15/2023
Violation issued (HPD, closed)
A
03/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
03/07/2023
Filed — Alteration
WORK PERFORMED IN CONJUNCTION WITH DOB APPLICATION 140942238 ALTERATION TYPE I TO INCLUDE CHANGE OF USE AT SECOND FLOOR. REMOVE / CAP AND REPLACE / MODIFY EXISTING PLUMBING FIXTURES AND ROUGHING AT FLOORS 2 & 3.
M08009372-P1
01/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2023
Violation issued (ECB, closed)
Construction
12/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
12/29/2022
Special inspection requirement — Electrical energy consumption
Michael Mazzella
12/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Mazzella
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGLOBAL MANAGEMENT LLC12/08/2023
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC11/02/2023
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC10/18/2023
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC07/05/2023
DOB NOWMechanical SystemsSigned-offGLOBAL MANAGEMENT LLC05/02/2023
DOB NOWPlumbingSigned-offJOHNNYS MASTER PLBG CORP10/11/2022
DOB NOWGeneral ConstructionSigned-offTUCCIMAR INC10/07/2022
DOB NOWSidewalk ShedSigned-offJASCO, INC07/28/2022
DOB NOWPlumbingSigned-offJOHNNYS MASTER PLBG CORP04/13/2021
DOB NOWPlumbingSigned-offJOHNNYS MASTER PLBG CORP01/08/2021
BIS—ISSUEDTUCCIMAR INC07/19/2021
BISOTISSUEDTUCCIMAR INC07/19/2021
BIS—ISSUEDTUCCIMAR INC03/04/2021
BIS—ISSUEDTUCCIMAR INC11/02/2020
BISFPISSUEDUNIQUE FIRE SYSTEMS INC07/18/2014
BISPLISSUEDTOP DOG PLBG & HTG CORP07/03/2012
BISFPISSUEDNY FIRE LLC01/09/2012
BISFPISSUEDNY FIRE LLC04/26/2011
BISPLISSUEDTOP DOG PLBG & HTG CORP03/14/2011
BISOTISSUEDPINGAN CONSTRUCTION INC03/14/2011
BISPLISSUEDCALRAY GAS HEAT CORP01/29/2009
BISBLISSUEDCALRAY GAS HEAT CORP01/29/2009
BISFPISSUEDMEGA FIRE PROTECTION INC06/27/2008
BISPLISSUEDPSEC PLG AND HTG CORP06/17/2008
BISMHISSUEDMEGA FIRE PROTECTION INC06/16/2008
BISEQISSUEDDELTA CONTRACTING CO04/24/2008
BISOTISSUEDDELTA CONTRACTING CO04/24/2008
BISFPISSUEDIDEAL FIRE CONTROL, INC02/17/2000
BISFPISSUEDALFRED C.COLLINS06/06/1994
BISPLISSUEDWASOFF PLBG & UTILITY CO05/22/1991
BISBLISSUEDPILOT ENERGY CORPORATION05/22/1991
13 projects · most recent 09/10/2024
General Wiring Lighting
FiledStatusContractorScope
09/10/2024CompleteRICHARD NEU—
05/03/2024CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
05/03/2024CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
04/07/2024CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
04/07/2024CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
11/27/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
11/27/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
05/25/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
01/17/2023CompleteIZZO ELECTRIC INC.General Wiring, Lighting
07/27/2022CompleteRICHARD NEU—
09/21/2021CompleteIZZO ELECTRIC INC.General Wiring, Lighting
01/06/2021CompleteA J IANNI ELECL CONTS INCGeneral Wiring
10/14/2019CompleteSELECTIVE ELEC'L CORP.General Wiring
1 project · most recent 09/17/2020
Wood
FiledStatusContractorScope
09/17/2020——Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
10/24/2023Energy Code Compliance InspectionsJOSEPH FREGLETTEprogress
10/24/2023Tenant Protection Plan ComplianceJOSEPH FREGLETTEspecial
10/24/2023Mechanical SystemsJOSEPH FREGLETTEspecial
10/24/2023HVAC-R and service water piping design and insulationJOSEPH FREGLETTEenergy_progress
10/24/2023HVAC-R and service water heating equipmentJOSEPH FREGLETTEenergy_progress
10/24/2023Maintenance informationJOSEPH FREGLETTEenergy_progress
10/24/2023HVAC-R and service water heating system controlsJOSEPH FREGLETTEenergy_progress
10/24/2023FinalJOSEPH FREGLETTEprogress
05/22/2023Tenant Protection Plan ComplianceJOSEPH FREGLETTEspecial
05/22/2023Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
05/22/2023Mechanical SystemsJOSEPH FREGLETTEspecial
05/22/2023HVAC-R and service water heating system controlsJOSEPH FREGLETTEenergy_progress
05/22/2023HVAC-R and service water piping design and insulationJOSEPH FREGLETTEenergy_progress
05/22/2023HVAC-R and service water heating equipmentJOSEPH FREGLETTEenergy_progress
05/22/2023FinalJOSEPH FREGLETTEprogress
05/19/2023HVAC-R and service water heating equipmentJOSEPH FREGLETTEenergy_progress
05/19/2023Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
05/19/2023Mechanical SystemsJOSEPH FREGLETTEspecial
05/19/2023Tenant Protection Plan Compliance—special
05/19/2023FinalJOSEPH FREGLETTEprogress
05/19/2023HVAC-R and service water piping design and insulationJOSEPH FREGLETTEenergy_progress
05/19/2023HVAC-R and service water heating system controlsJOSEPH FREGLETTEenergy_progress
03/08/2023Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
12/29/2022Energy Code Compliance InspectionsMichael Mazzellaprogress
12/29/2022Electrical energy consumptionMichael Mazzellaenergy_progress
Latest 25 of 43.
▾Documents — 273 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
09/02/2026M00780097-I1Request digital key ↗
09/01/2026M08007789-I1Request digital key ↗
08/31/2026M08009372-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00380728-I1Request digital key ↗
09/04/2026M00380728-P1Request digital key ↗
09/04/2026M00380728-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00377861-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION27
02/04/2025140942238Open ↗
01/29/2025140942238Open ↗
11/13/2024140942238Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION17
05/14/2021140944833Open ↗
03/05/2021140942238Open ↗
11/02/2020140942238Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/19/2021140942238Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
09/04/2024140942238Open ↗
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature28
08/29/2026M00864183-I1Open ↗
08/29/2026M00864183-I1Open ↗
08/29/2026M00864183-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00380728-P3Open ↗
09/04/2026M00380728-P1Open ↗
09/04/2026M00380728-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/29/2026M00864183-I1Open ↗
08/29/2026M00864183-I1Open ↗
08/29/2026M00864183-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/12/2013120626778Open ↗
03/09/2011120626778Open ↗
04/24/2008110129450Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/14/2014122058405Open ↗
03/09/2011120626778Open ↗
01/30/2009110442058Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/22/2020140944833Open ↗
07/14/2014122058405Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/09/2011120626778Open ↗
01/30/2009110442058Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/22/2020140944833Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/01/2020140942238Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/01/2020140942238Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE6
07/18/2012120626778Open ↗
11/07/2011120626778Open ↗
10/26/2011120626778Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
03/09/2011120626778Open ↗
06/18/2009110442058Open ↗
01/30/2009110442058Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
03/24/2023140942238Open ↗
03/24/2023140942238Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/17/2009110442058Open ↗
01/30/2009110442058Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/03/2014122058405Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/31/2023140942238Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/31/2023140942238Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES2
10/01/2020140942238Open ↗
09/22/2020140944833Open ↗
▸BISSTREET TREE CHECKLIST2
10/27/2020140942238Open ↗
03/09/2011120626778Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00381102-I1Open ↗
08/13/2026M00377861-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/04/2026M00380728-P3Open ↗
09/04/2026M00380728-P2Open ↗
09/04/2026M00380728-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/09/2011120626778Open ↗
06/07/2010120332256Open ↗
01/30/2009110442058Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/01/2020140942238Open ↗
09/22/2020140944833Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/13/2011120652310Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
10/21/2022140942238Open ↗
10/21/2022140942238Open ↗
05/14/2021140944833Open ↗
Showing 3 of 6 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
01/31/2023140942238Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/31/2023140942238Open ↗
▸BISLIGHTING CONTROLS1
01/31/2023140942238Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/11/2011120626778Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/31/2023140942238Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/01/2020140942238Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/31/2023140942238Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/31/2023140942238Open ↗
▸BISINTERIOR LIGHTING POWER1
01/31/2023140942238Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/12/2013120626778Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY17
01/14/2025140942238Open ↗
07/14/2024110129450Open ↗
07/08/2024110129450Open ↗
Showing 3 of 17 on file for this type
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
01/31/2023140942238Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
07/26/2024110129450Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/31/2023140942238Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/31/2023140942238Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/31/2023140942238Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/19/2024110129450Open ↗
07/02/2013120931830Open ↗
06/12/2013120626778Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/27/2011120931830Open ↗
04/13/2011120652310Open ↗
06/07/2010120332256Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/04/2024140942238Open ↗
11/04/2024140942238Open ↗
03/12/2024140942238Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2013120626778Open ↗
09/01/2011120652310Open ↗
▸BISFIRE SUPP ANSUL APPROVAL: FD-FSS1
07/07/2008110129450Open ↗
▸BISSUPERSEDING LETTER1
03/05/2021140942238Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
12/22/2023110129450Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT21
10/21/2022140942238Open ↗
09/29/2021140942238Open ↗
10/01/2020140942238Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/28/2024110129450Open ↗
01/31/2023140942238Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/10/2012120931830Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET6
07/14/2014122058405Open ↗
12/27/2011120931830Open ↗
04/13/2011120652310Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
09/12/2024140942238Open ↗
09/29/2021140942238Open ↗
10/27/2020140942238Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/01/2020140942238Open ↗
09/22/2020140944833Open ↗
04/04/2008110129450Open ↗
▸Other Documents6
▸BIS* FIRE STOPS 27-3452
07/20/2024110129450Open ↗
07/20/2024110129450Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/01/2011120652310Open ↗
09/02/2009110442058Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
07/26/2024110129450Open ↗
▸BISDHCR DOCUMENT1
08/16/2024110129450Open ↗