Two family brick
805 MONROE ST
BROOKLYN · BIN 3044732
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6AZoning
2,666 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 805 MONROE HOLDINGS LLC · 2,454 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Penthouse61p · 1 filing · 20 docs
Floor 458p · 1 filing · 20 docs
Floor 359p · 1 filing · 20 docs
Floor 259p · 1 filing · 20 docs
Floor 158p · 1 filing · 20 docs
Cellar62p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
511 HOLDINGS2707/08/2026
OWNER'S REP703/22/2026
PARK USA DESIGN & REMODEL403/22/2026
DESIGN & REMOVAL PARK USA103/22/2026
805 MONROE HOLDINGS LLC103/22/2026
38-40 DNH REALTY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/28/2024$1.2M—805 DNH REALTY LLC → 805 MONROE HOLDINGS LLC$469/sf building
07/19/2016$870K—Private party → 805 DNH REALTY LLC$326/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC402/26/2026
VASILIOS ARTEMIOU PE608/20/2025
MICHAEL REZK112/26/2024
R & O ENGINEERING411/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEIGER E A GROUP203/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
EXPRESS FILING INC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK USA DESIGN & REMODELGeneral Contractor2007/08/2026
GWT ENTERPRISES INCGeneral Contractor603/21/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161102/26/2026
SHAHRISH SHUVO ENGINEERIN8524204/18/2024
Building Lifecycle
All (143)Filed (15)Permit Issued (16)Signed Off (9)Violation (9)Inspection (13)Objection (48)Special Inspection (30)Tax Incentive (3)
06/08/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-I1
05/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/02/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
03/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/02/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/02/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/02/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/02/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/02/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/02/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/02/2026
Special inspection requirement — Metering
FAHAD FATEH
03/02/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/02/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/02/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-P9
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/16/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/16/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/16/2026
Special inspection requirement — Metering
FAHAD FATEH
02/16/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
02/16/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/16/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/16/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/16/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/16/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/29/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S8
10/29/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S4
10/29/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S7
10/20/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S1
09/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S2
09/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S3
09/17/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/09/2025
Objection resolved — Addressed
09/03/2025
Objection raised — Scope
09/01/2025
485-x construction completed
08/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-P7
08/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2025
Signed off — Alteration
B01159557-I1
07/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #B00929884-I1
B00929884-S5
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
485-x registration filed
05/12/2025
Permit issued — Construction Fence
B00929884-S3-FN
03/31/2025
Permit issued — General Construction
B00929884-I1-GC
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPARK USA DESIGN & REMODEL05/12/2025
DOB NOWGeneral ConstructionPermit IssuedPARK USA DESIGN & REMODEL03/31/2025
DOB NOWMechanical SystemsSigned-offPARK USA DESIGN & REMODEL02/07/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL02/06/2025
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC09/24/2024
DOB NOWEarth WorkSigned-offPARK USA DESIGN & REMODEL08/26/2024
DOB NOWStructuralPermit IssuedPARK USA DESIGN & REMODEL08/22/2024
DOB NOWGeneral ConstructionPermit IssuedPARK USA DESIGN & REMODEL08/22/2024
DOB NOWFoundationPermit IssuedPARK USA DESIGN & REMODEL08/21/2024
DOB NOWEarth WorkSigned-offPARK USA DESIGN & REMODEL07/03/2024
DOB NOWStructuralPermit IssuedPARK USA DESIGN & REMODEL07/03/2024
DOB NOWConstruction FenceSigned-offPARK USA DESIGN & REMODEL05/15/2024
DOB NOWFoundationPermit IssuedPARK USA DESIGN & REMODEL05/15/2024
DOB NOWGeneral ConstructionPermit IssuedPARK USA DESIGN & REMODEL05/09/2024
BISEQISSUEDCHESAKL ENTERPRISES INC08/02/2024
BISPLISSUEDTW PLUMBING & HEATING INC09/13/2016
BISOTISSUEDSAMANTHA CONSTRUCTION INC08/22/2016
1 project · most recent 02/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2026Signed-offPARK USA DESIGN & REMODELHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MX36WMVJU9 36,000 BTU · Condensing Unit ×6
RMXS48LVJU 20,000 BTU · Condensing Unit ×2
3MXS24WMVJU 24,000 BTU · Vrf Outdoor ×1
RXF18AXVJU 54,000 BTU · Condensing Unit ×1
1 project · most recent 02/26/2026
Sprinkler System
FiledStatusContractorScope
02/26/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 02/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/26/2026Signed-offKISHAN PLUMBING INCStorm, Water/Sanitary
3 projects · most recent 03/26/2025
General Wiring
FiledStatusContractorScope
03/26/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
03/19/2025CompletePOWER DIRECT ELECTRIC INC—
01/06/2025CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 02/26/2026
Steel Concrete
FiledStatusContractorScope
02/26/2026Signed-offPARK USA DESIGN & REMODELSteel, Concrete
1 project · most recent 02/26/2026
Fence
FiledStatusContractorScope
02/26/2026Signed-offPARK USA DESIGN & REMODELFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
03/02/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/02/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/02/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/02/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/02/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/02/2026MeteringFAHAD FATEHenergy_progress
03/02/2026Maintenance informationFAHAD FATEHenergy_progress
03/02/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/02/2026Exterior lighting powerFAHAD FATEHenergy_progress
03/02/2026Lighting controlsFAHAD FATEHenergy_progress
03/02/2026Interior lighting powerFAHAD FATEHenergy_progress
03/02/2026Fenestration areasFAHAD FATEHenergy_progress
03/02/2026Air barrier — testing FAHAD FATEHenergy_progress
03/02/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/02/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/02/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/16/2026Air barrier — testing FAHAD FATEHenergy_progress
02/16/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/16/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/16/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/16/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/16/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
02/16/2026Lighting controlsFAHAD FATEHenergy_progress
02/16/2026MeteringFAHAD FATEHenergy_progress
02/16/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 85.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026B00929884-P2Request digital key ↗
08/26/2026B00929884-S3Request digital key ↗
08/26/2026B00929884-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/08/2025321192972Open ↗
08/01/2024340912276Open ↗
03/29/2017321192972Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/02/2024340912276Open ↗
09/13/2016340386790Open ↗
08/22/2016340386790Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00929884-I1Open ↗
08/13/2026B00929884-P9Open ↗
08/13/2026B00929884-P2Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
10/27/2016321192972Open ↗
10/18/2016321192106Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
10/27/2016321192972Open ↗
10/18/2016321192106Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00929884-I1Open ↗
08/13/2026B00929884-P9Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/29/2017321192972Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/29/2017321192972Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00929884-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026B00929884-P9Open ↗
08/26/2026B00929884-P1Open ↗
08/26/2026B00929884-S8Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00929884-P3Open ↗
09/01/2026B00929884-S2Open ↗
09/01/2026B00929884-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00929884-P3Open ↗
09/01/2026B00929884-S2Open ↗
09/01/2026B00929884-P1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/01/2024340912276Open ↗
05/27/2016340386790Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/01/2024340912276Open ↗
05/27/2016340386790Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/01/2024340912276Open ↗
05/27/2016340386790Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/11/2017340386790Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
05/27/2016340386790Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST1
01/13/2017321192972Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/27/2016340386790Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00929884-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00929884-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00929884-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026B00929884-P2Open ↗
08/26/2026B00929884-S4Open ↗
08/26/2026B00929884-P9Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/27/2016340386790Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026B00929884-S2Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/27/2016340386790Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/11/2017340386790Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/27/2016340386790Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/01/2024340912276Open ↗
05/27/2016340386790Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00929884-S8Open ↗
08/13/2026B00929884-S5Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00929884-S5Open ↗
08/13/2026B00929884-S8Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/02/2024340912276Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/11/2017340386790Open ↗
02/02/2017321192106Open ↗
01/11/2017321192972Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/03/2025340912276Open ↗
05/11/2017340386790Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
03/29/2017321192972Open ↗
10/27/2016321192972Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/25/2025340912276Open ↗
08/01/2024340912276Open ↗
05/11/2017340386790Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/02/2025340912276Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION8
03/17/2017321192972Open ↗
03/08/2017321192972Open ↗
02/16/2017340386790Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/01/2024340912276Open ↗
05/27/2016340386790Open ↗
▸BISEFILING COVER SHEET2
10/27/2016321192972Open ↗
10/18/2016321192106Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026B00929884-P9Open ↗
08/13/2026B00929884-P2Open ↗
08/13/2026B00929884-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00929884-I1Open ↗
08/13/2026B00929884-P2Open ↗
08/13/2026B00929884-P9Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00929884-P9Open ↗
08/26/2026B00929884-P2Open ↗
08/15/2026B00929884-I1Open ↗
▸BISPLOT DIAGRAM2
10/27/2016321192972Open ↗
10/18/2016321192106Open ↗
▸DOB NOWFinal Survey2
08/15/2026B00929884-I1Open ↗
08/13/2026B00929884-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00929884-S5Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00929884-S7Open ↗