← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
805 Washington Avee Condominium
805 WASHINGTON AVENUE · BIN 3029645
💬 Discuss this project
2018Year Built
9Stories
RMBuilding Class
R7AZoning
51,705 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized16 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 805 WASHINGTON AVE LLC · 7,417 sf lot · 6.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof4p · 4 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
Sub-Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.503/22/2026
150 EAST 49TH ST OWNERS103/22/2026
805 WASHINGTON AVE3003/21/2026
CORE SCAFFOLD SYSTEMS403/21/2026
DELI203/21/2026
805 WASHINGTON AVE CONDOMINIUM403/21/2026
GAZALA REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
FALCON GROUP403/21/2026
PDG BUILDING CONSULTANTS LLC LLC203/21/2026
SOTIR ASSOCIATES203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SILVERCUP SCFFLDNG I LLCGeneral Contractor1107/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor507/08/2026
CANIDO BASONAS CONST SVCGeneral Contractor303/21/2026
HAPPY LIVING DEVELOPMENTGeneral Contractor307/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
SAT CONSTRUCTION SERVICESGeneral Contractor107/08/2026
SIGN MASTER USA INCGeneral Contractor107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/02/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
BYBLOS INC. NYGeneral Contractor107/17/2026
CITI BUILDERS NY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407206/01/2026
SOTIR ASSOCIATES7473504/24/2026
GRASSO-MENZIUSO ARCHITECT1279103/18/2026
MJ ENGINEERING & DESIGN5546202/27/2026
FALCON ENGINEERING CO.LLC5649210/09/2024
LOMBARDO PROF ENGINEERING8566210/09/2024
M SQUARED ARCHITECTURE7875205/09/2022
Building Lifecycle
All (179)Filed (18)Permit Issued (18)Signed Off (11)Violation (60)Inspection (8)Objection (34)Special Inspection (30)
08/24/2026
Signed off — Alteration
Install new front entry door. No change to use, bulk or egress
B01371978-I1
07/16/2026
Permit issued — General Construction
B01371978-I1-GC
06/30/2026
Signed off — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-S2
06/04/2026
Permit issued — General Construction
B01410141-I1-GC
06/01/2026
Signed off — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-I1
06/01/2026
Filed — Alteration
ERECT NEW AWNING AT OSP. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01410141-I1
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
05/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
05/20/2026
Objection raised — Admin
05/20/2026
Objection resolved — Addressed
05/14/2026
Signed off — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-S1
05/13/2026
Signed off — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-S3
05/12/2026
Filed — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-P4
05/12/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
05/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hany Demetry
04/28/2026
Special inspection requirement — Fenestration areas
Hany Demetry
04/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Hany Demetry
04/28/2026
Special inspection requirement — Fenestration air leakage
Hany Demetry
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
04/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
04/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/24/2026
Filed — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-P3
04/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2026
Special inspection requirement — Mechanical Systems
Hany Demetry
04/23/2026
Special inspection requirement — Post-installed Anchors
Hany Demetry
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
04/23/2026
Special inspection requirement — Final
Mina Eskaros
04/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Hany Demetry
04/23/2026
Special inspection requirement — Shutoff dampers
Hany Demetry
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Hany Demetry
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hany Demetry
04/17/2026
Filed — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-P2
04/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Hany Demetry
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hany Demetry
04/16/2026
Special inspection requirement — Fenestration areas
Hany Demetry
04/16/2026
Special inspection requirement — Fenestration air leakage
Hany Demetry
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2026
Filed — Alteration
Install new front entry door. No change to use, bulk or egress
B01371978-I1
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
02/27/2026
Filed — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-P1
02/26/2026
Permit issued — Structural
B01278960-S3-ST
02/13/2026
Permit issued — Sign
B01355702-I1-SG
02/09/2026
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01355702-I1
01/13/2026
Filed — Alteration
PLUMBING WORK TO INSTALL NEW FIXTURES FOR A PROPOSED FOOD MARKET ON 1ST FLOOR AND CELLAR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01278960-I1.
B01278960-S3
11/24/2025
Permit issued — Plumbing
B01278960-S2-PL
11/10/2025
Permit issued — Mechanical Systems
B01278960-S1-MS
11/10/2025
Permit issued — General Construction
B01278960-I1-GC
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBYBLOS INC. NY07/16/2026
DOB NOWGeneral ConstructionSigned-offSIGN MASTER USA INC06/04/2026
DOB NOWStructuralSigned-offJOHN EVAN CONTRACTING COR02/26/2026
DOB NOWSignSigned-offDESTHERS, JOSEPH02/13/2026
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C11/24/2025
DOB NOWMechanical SystemsSigned-offJOHN EVAN CONTRACTING COR11/10/2025
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR11/10/2025
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC10/31/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL04/30/2024
DOB NOWGeneral ConstructionSigned-offCITI BUILDERS NY LLC03/10/2023
DOB NOWGeneral ConstructionSigned-offSAT CONSTRUCTION SERVICES08/30/2022
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC05/21/2021
DOB NOWGeneral ConstructionSigned-offHAPPY LIVING DEVELOPMENT03/25/2021
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC09/02/2020
DOB NOWCurb CutPermit IssuedHAPPY LIVING DEVELOPMENT08/16/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC07/30/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC08/02/2018
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC07/17/2018
BISSDISSUEDRIGHTWAY PLBG AND HTG INC05/16/2023
BISPLISSUEDBEST MECHANICAL SVCS INC05/02/2023
BIS—ISSUEDHAPPY LIVING DEVELOPMENT03/02/2021
BIS—ISSUEDHAPPY LIVING DEVELOPMENT01/27/2021
BIS—ISSUEDHAPPY LIVING DEVELOPMENT08/04/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/04/2020
BISEQISSUEDHAPPY LIVING DEVELOPMENT06/02/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/02/2020
BISPLISSUEDRRP PLUMBING CORP01/08/2020
BIS—ISSUEDHAPPY LIVING DEVELOPMENT01/07/2020
BIS—ISSUEDHAPPY LIVING DEVELOPMENT09/10/2019
BISSDISSUEDRRP PLUMBING CORP07/11/2019
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/19/2019
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/13/2019
BISEQISSUEDHAPPY LIVING DEVELOPMENT05/30/2019
BISSPISSUEDRRP PLUMBING CORP05/23/2019
BISMHISSUEDHAPPY LIVING DEVELOPMENT04/26/2019
BIS—ISSUEDHAPPY LIVING DEVELOPMENT04/17/2019
BISOTISSUEDHAPPY LIVING DEVELOPMENT02/25/2019
BISPLISSUEDRRP PLUMBING CORP01/04/2019
BIS—RE-ISSUEDHAPPY LIVING DEVELOPMENT06/26/2018
BISEQISSUEDHAPPY LIVING DEVELOPMENT06/21/2018
+ 25 more permits on file
13 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026CompleteASKO ELEC CONST & MAIN IN—
11/21/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
11/19/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
08/29/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
12/16/2024CompleteCIRCUIT CITY ELECTRIC LLC—
06/07/2024CompleteJTE ELECTRICAL SERVICESGeneral Wiring
05/30/2023CompleteTHE METRO GROUP ELECTRIC—
03/14/2023CompleteETRICITY ELECTRICAL CO INGeneral Wiring
06/30/2022Permit IssuedKILO WATT ELECTRIC CORPGeneral Wiring
07/11/2020CompleteALL WAYS ELECTRIC CORP.W—
03/27/2019CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
08/20/2018Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
05/24/2018CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/28/2026Energy Code Compliance InspectionsHany Demetryprogress
05/28/2026Tenant Protection Plan ComplianceHany Demetryspecial
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026Energy Code Compliance InspectionsHany Demetryprogress
04/28/2026Fire-Resistance Rated ConstructionHany Demetryprogress
04/28/2026Fenestration areasHany Demetryenergy_progress
04/28/2026Fenestration and door U-factor and product ratingsHany Demetryenergy_progress
04/28/2026Fenestration air leakageHany Demetryenergy_progress
04/28/2026Energy Code Compliance InspectionsHany Demetryprogress
04/28/2026Fire-Resistant Penetrations and JointsHany Demetryspecial
04/28/2026Tenant Protection Plan ComplianceHany Demetryspecial
04/28/2026Structural Stability – Alterations of existing buildingsHany Demetryspecial
04/24/2026Tenant Protection Plan Compliance—special
04/23/2026Mechanical SystemsHany Demetryspecial
04/23/2026Post-installed AnchorsHany Demetryspecial
04/23/2026Energy Code Compliance InspectionsHany Demetryprogress
04/23/2026FinalMina Eskarosprogress
04/23/2026HVAC-R and service water heating equipmentHany Demetryenergy_progress
04/23/2026Shutoff dampersHany Demetryenergy_progress
04/23/2026HVAC-R and service water heating system controlsHany Demetryenergy_progress
04/23/2026HVAC-R and service water piping design and insulationHany Demetryenergy_progress
04/16/2026Fenestration and door U-factor and product ratingsHany Demetryenergy_progress
04/16/2026Fire-Resistant Penetrations and JointsHany Demetryspecial
04/16/2026Structural Stability – Alterations of existing buildingsHany Demetryspecial
04/16/2026Tenant Protection Plan ComplianceHany Demetryspecial
Latest 25 of 41.
▾Documents — 457 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
09/03/2026B00031079-I1Request digital key ↗
09/01/2026B00483609-I1Request digital key ↗
08/29/2026B00716055-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00392875-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00188197-I1Request digital key ↗
▸Applications & Permits104
▸BISPLAN / WORK APPROVAL APPLICATION49
07/21/2025340564446Open ↗
03/24/2025321478548Open ↗
03/14/2025321478548Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION42
05/17/2023340447840Open ↗
05/17/2023340447840Open ↗
05/03/2023321478548Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
01/07/2021340518023Open ↗
01/06/2021321478548Open ↗
09/30/2020321478548Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/24/2019340564446Open ↗
▸BISDEC Permit for SNAD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/10/2019321478548Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING APPEAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM ACCEPTANCE1
01/08/2020321693690Open ↗
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
02/25/2020340447840Open ↗
02/25/2020340447840Open ↗
02/25/2020340447840Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026B00031079-I1Open ↗
09/01/2026B00483609-I1Open ↗
08/25/2026B01030963-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026B01371978-I1Open ↗
08/29/2026B01355702-I1Open ↗
08/29/2026B01278960-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026B01371978-I1Open ↗
08/29/2026B01355702-I1Open ↗
08/28/2026B00716055-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
03/20/2019340658229Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING7
10/15/2019340447840Open ↗
09/08/2019340447840Open ↗
03/20/2019340658229Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS1
01/17/2023340447840Open ↗
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/08/2020321693690Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
01/17/2023340447840Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
09/24/2019340564446Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
09/05/2019340564446Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
03/20/2019340658229Open ↗
02/11/2019340647447Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWOER: Notice to Proceed3
08/13/2026B00716055-I1Open ↗
08/13/2026B00188197-I1Open ↗
08/13/2026B00031079-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B00716055-I1Open ↗
08/13/2026B00031079-I1Open ↗
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/02/2023321478548Open ↗
06/03/2020321478548Open ↗
06/03/2020321478548Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/25/2020321478548Open ↗
02/25/2020321478548Open ↗
02/25/2020321478548Open ↗
Showing 3 of 7 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/27/2025321478548Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY20
01/17/2023321478548Open ↗
11/22/2022321478548Open ↗
11/16/2022321478548Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
02/25/2020321478548Open ↗
Showing 1 of 3 on file for this type
▸BISHYDRO FLOW TEST LETTER2
04/16/2019340658229Open ↗
Showing 1 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
04/10/2019340658229Open ↗
Showing 1 of 2 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/17/2023340447840Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
05/19/2023340447840Open ↗
01/07/2021340518023Open ↗
01/07/2021340517738Open ↗
Showing 3 of 19 on file for this type
▸BISSUPERSEDING LETTER4
05/17/2023340447840Open ↗
05/17/2023340447840Open ↗
05/03/2023321478548Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
06/10/2021321478548Open ↗
06/01/2021321478548Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership25
▸BISPROJECT-SPECIFIC GL INSURANCE12
02/18/2021321478548Open ↗
02/05/2021321478548Open ↗
01/19/2021321478548Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT8
07/29/2020321481598Open ↗
12/13/2018340647447Open ↗
Showing 2 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
10/08/2019321478548Open ↗
09/11/2019321478548Open ↗
08/07/2019321478548Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms81
▸BISADDITIONAL INFORMATION47
10/20/2025340564446Open ↗
04/20/2023340564446Open ↗
03/10/2023321478548Open ↗
Showing 3 of 47 on file for this type
▸BISBOROUGH INTAKE FORM16
04/03/2020300084352Open ↗
04/03/2020300614048Open ↗
04/03/2020300082586Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET10
06/14/2019321964941Open ↗
Showing 1 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/20/2019340658229Open ↗
Showing 1 of 7 on file for this type
▸BISSRO INTAKE FORM(SRO1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
01/17/2023321478548Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/17/2023321478548Open ↗