← Back
Walk-up cooperative
806 CARROLL STREET
BROOKLYN · BIN 3024924
💬 Discuss this project
1892Year Built
3Stories
C6Building Class
R7BZoning
3,782 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: 806 CARROLL STREET HOUSING COR · 1,898 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
806 CARROLL STREET HOUSING703/22/2026
806 CARROLL STREET HOUSING COR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RACHEL FRANKEL ARCHITECTURE107/01/2026
KEMS ENGINEERING AND CONSTRUCTION112/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HENRY MYERS P & H, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355112/30/2024
Building Lifecycle
All (26)Filed (2)Permit Issued (1)Signed Off (1)Violation (3)Inspection (4)Objection (4)Special Inspection (11)
07/17/2026
Objection resolved — Resolved
07/10/2026
Objection raised — Other
07/10/2026
Objection raised — Energy
07/10/2026
Objection resolved — Resolved
07/01/2026
Filed — Alteration
filed herewith facade repair work on south and east facades as per plans, including masonry repair and lintel replacement.
B01410524-I1
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/02/2026
Special inspection requirement — Masonry
06/02/2026
Special inspection requirement — Structural Steel - Details
06/02/2026
Special inspection requirement — Post-installed Anchors
06/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/02/2026
Special inspection requirement — Final
06/27/2025
Signed off — Alteration
REGISTER TWO (2) FURNACES AND TWO (2) WATER HEATERS AND ONE (1) CLOTHES DRYER IN CELLAR.
B01150892-I1
05/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2025
Permit issued — Plumbing
B01150892-I1-PL
12/30/2024
Filed — Alteration
REGISTER TWO (2) FURNACES AND TWO (2) WATER HEATERS AND ONE (1) CLOTHES DRYER IN CELLAR.
B01150892-I1
12/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
12/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/07/2021
Violation issued (HPD, closed)
A
10/16/2018
Violation issued (HPD, closed)
I
11/20/2017
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC01/08/2025
1 project · most recent 07/01/2026
Steel Masonry
FiledStatusContractorScope
07/01/2026——Steel, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/02/2026Structural Stability – Alterations of existing buildings—special
06/02/2026Masonry—special
06/02/2026Structural Steel - Details—special
06/02/2026Post-installed Anchors—special
06/02/2026Tenant Protection Plan Compliance—special
06/02/2026Final—progress
12/27/2024Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
12/27/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
12/19/2024HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
12/19/2024HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
12/19/2024HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026B01150892-I1Request digital key ↗
08/15/2026B01410524-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/15/2026B01410524-I1Open ↗
08/13/2026B01150892-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026B01150892-I1Open ↗
08/27/2026B01150892-I1Open ↗
08/27/2026B01150892-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01410524-I1Open ↗
08/13/2026B01150892-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01150892-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01150892-I1Open ↗