← Back
Miscellaneous warehouse
807 BANK STREET
BROOKLYN · BIN 3429647
💬 Discuss this project
2023Year Built
1Stories
E9Building Class
M1-1Zoning
86,863 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous warehouse · Owner of record: 807 BANK STREET PROPERTY LLC · 89,803 sf lot · 0.97 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof100p · 2 filings · 20 docs
Floor 1104p · 3 filings · 20 docs
Cellar1p · 1 filing · 4 docs
1 job · most recent 11/25/2024
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2024Signed-offARCO DESIGN/BUILD INDUSTRAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Lg LUU420HHV 42,000 BTU · Split System ×1
Valent CASRTU3-E.454-24-12.5T 12 tons · Rooftop Unit ×1
Ducts & Piping
N/A N/A 1 CFM ×1
1 job · most recent 05/20/2024
Sprinkler System
FiledStatusContractorScope
05/20/2024Signed-offFULL CAPACITY FIRE CORPSprinkler System
1 job · most recent 11/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/25/2024Signed-offDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
5 jobs · most recent 09/17/2025
General Wiring
FiledStatusContractorScope
09/17/2025CompleteKAYLEE ELECTRIC CORPGeneral Wiring
01/07/2025CompletePOWER SURGE ELECTRIC, INC2 meters, 1 new_meters
06/14/2024CompleteLIPPOLIS ELECTRIC, INC.General Wiring
05/30/2024CompleteLIPPOLIS ELECTRIC, INC.—
11/20/2023Permit IssuedAGIR ELEC'L LTD. D/B/AGeneral Wiring
1 job · most recent 05/20/2024
FiledStatusContractorScope
05/20/2024Signed-offARCO DB COMPANIES, INC1 scope_items
Building Lifecycle
All (224)Filed (45)Permit Issued (51)Signed Off (30)Violation (13)Inspection (29)Objection (26)Special Inspection (30)
10/28/2025
Violation issued (ECB, closed)
Construction
03/27/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "807 BANK".
B01169468-I1
03/27/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "807 BANK".
B01169469-I1
03/11/2025
Signed off — Alteration
REMOVAL OF SPRINKLER SYSTEM FROM FLOORS 001. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B00642408-I1
02/13/2025
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S2
02/13/2025
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S3
02/11/2025
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S9
01/28/2025
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S7
01/28/2025
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z1
01/24/2025
Permit issued — Sign
B01169468-I1-SG
01/24/2025
Permit issued — Sign
B01169469-I1-SG
01/23/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "807 BANK".
B01169468-I1
01/23/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "807 BANK".
B01169469-I1
01/20/2025
Special inspection requirement — Final
ARIEL GOLSHAN
01/20/2025
Special inspection requirement — Final
ARIEL GOLSHAN
01/15/2025
Signed off — Alteration
Installation of partitions as per plans. No change in use, egress or occupancy. Filed in conjunction with NB B00683375-I1.
B01050177-S3
01/15/2025
Signed off — Alteration
Installation of partitions as per plans. No change in use, egress or occupancy. Filed in conjunction with NB B00683375-I1.
B01050177-I1
01/14/2025
Signed off — Alteration
Installation of partitions as per plans. No change in use, egress or occupancy. Filed in conjunction with NB B00683375-I1.
B01050177-S1
12/10/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S5
12/10/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S4
12/04/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-S8
12/04/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Y3
12/04/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z9
11/26/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/25/2024
Filed — New Building
Plumbing work associated with NB Construction.
B00683375-A2
11/19/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z8
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z4
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z7
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Y1
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z5
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Y4
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Z6
11/13/2024
Signed off — New Building
Plumbing work associated with NB Construction.
B00683375-Y2
10/25/2024
Filed — New Building
Plumbing work associated with NB Construction.
B00683375-A1
10/07/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/07/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/03/2024
Signed off — Alteration
INSTALLATION OF A STRUCTURAL STEEL CANOPY STRUCTURE TO SUPPORT THE INSTALLATION OF A PVCANOPY ON TOP OF ROOFTOP SURFACE PARKING ASPER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDERTHIS APPLICATION.
B00947739-I1
08/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/13/2024
Permit issued — General Construction
B01050177-I1-GC
08/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2024
Signed off — Alteration
Ground improvement work in conjunction with NB Construction. NB Filed under B00683375.
B07999675-I1
08/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Masonry
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Metering
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
08/07/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
Latest 60 of 224 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TURNBRIDGE EQUITIES9307/08/2026
ALBA SERVICES1207/08/2026
807 BANK STREET PROPERTY LLC1003/22/2026
3 G BUILDERS103/22/2026
ARCO DESIGN/BUILD INDUSTR303/22/2026
GLENMORE PLASTICS INDUSTRIES I1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2021$11.2M—GLEN REAL ESTATE HOLDINGS, LLC → 807 BANK STREET PROPERTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.7403/21/2026
ECC203/21/2026
KD DESIGNS103/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
HM LOKE CONSULTING ENGINEERING PC103/21/2026
KAZAM CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO DESIGN/BUILD INDUSTRGeneral Contractor6607/08/2026
SOLAR SYSTEM ERECTORS LLCGeneral Contractor603/21/2026
FISHER INSTALLATIONS INCGeneral Contractor507/08/2026
DONATO PLUMBING GROUP INCPlumbing307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
NORTH SHORE NEON SIGNScaffold207/08/2026
FULL CAPACITY FIRE CORPFire Protection207/08/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
ARCO DB COMPANIES, INCGeneral Contractor207/08/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432211/25/2024
ANCORA ENGINEERING, PLLC6818303/18/2024
MILROSE CONSULTANTS LLC2003110/20/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/24/2025
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/24/2025
DOB NOWGeneral ConstructionSigned-offARCO DB COMPANIES, INC08/13/2024
DOB NOWMechanical SystemsSigned-offARCO DB COMPANIES, INC07/05/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP06/25/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC06/24/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC04/17/2024
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC02/16/2024
DOB NOWConstruction FenceSigned-offFISHER INSTALLATIONS12/22/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC12/18/2023
DOB NOWStructuralSigned-offSOLAR SYSTEM ERECTORS LLC12/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offSOLAR SYSTEM ERECTORS LLC11/30/2023
DOB NOWStructuralSigned-offARCO DESIGN/BUILD INDUSTR11/08/2023
DOB NOWStructuralSigned-offARCO DESIGN/BUILD INDUSTR11/08/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWCurb CutSigned-offARCO DESIGN/BUILD INDUSTR09/13/2023
DOB NOWConstruction FenceSigned-offFISHER INSTALLATIONS09/01/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS07/21/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS07/20/2023
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP07/07/2023
DOB NOWGeneral ConstructionPermit IssuedARCO DESIGN/BUILD INDUSTR02/28/2023
DOB NOWGeneral ConstructionPermit IssuedARCO DESIGN/BUILD INDUSTR02/28/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC02/23/2023
DOB NOWFoundationPermit IssuedARCO DESIGN/BUILD INDUSTR01/10/2023
DOB NOWFoundationSigned-offARCO DESIGN/BUILD INDUSTR01/10/2023
DOB NOWFoundationSigned-offARCO DESIGN/BUILD INDUSTR12/12/2022
DOB NOWFoundationPermit IssuedARCO DESIGN/BUILD INDUSTR12/12/2022
DOB NOWGeneral ConstructionPermit IssuedARCO DESIGN/BUILD INDUSTR12/07/2022
DOB NOWGeneral ConstructionPermit IssuedARCO DESIGN/BUILD INDUSTR12/06/2022
DOB NOWMechanical SystemsSigned-offARCO DESIGN/BUILD INDUSTR12/02/2022
DOB NOWStructuralSigned-offARCO DESIGN/BUILD INDUSTR11/03/2022
DOB NOWConstruction FenceSigned-offFISHER INSTALLATIONS11/03/2022
+ 37 more permits on file
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
11/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/07/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/07/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/19/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 146
DateRequirementInspectorRole
01/20/2025FinalARIEL GOLSHANprogress
01/20/2025FinalARIEL GOLSHANprogress
11/19/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
08/07/2024Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
08/07/2024Fenestration areasJOHN MCMONAGLEenergy_progress
08/07/2024Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
08/07/2024Air barrier — testing JOHN MCMONAGLEenergy_progress
08/07/2024Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
08/07/2024Maintenance informationJOHN MCMONAGLEenergy_progress
08/07/2024Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
08/07/2024Subsurface Investigations (Borings/Test Pits)Peter Howellspecial
08/07/2024Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
08/07/2024Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
08/07/2024MasonryJOHN MCMONAGLEspecial
08/07/2024Lighting controlsJOHN MCMONAGLEenergy_progress
08/07/2024Fenestration air leakageJOHN MCMONAGLEenergy_progress
08/07/2024Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
08/07/2024Interior lighting powerJOHN MCMONAGLEenergy_progress
08/07/2024Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
08/07/2024Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
08/07/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/07/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/07/2024MeteringJOHN MCMONAGLEenergy_progress
08/07/2024VestibulesJOHN MCMONAGLEenergy_progress
08/01/2024Maintenance informationJOHN MCMONAGLEenergy_progress
Latest 25 of 146.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
08/31/2026B00642408-I1Request digital key ↗
08/31/2026B00657960-I1Request digital key ↗
08/28/2026B07999675-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION5
03/26/2024300616901Open ↗
03/20/2024300821822Open ↗
10/23/2023340900966Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/08/2023340868190Open ↗
11/06/2023340868190Open ↗
06/20/2023340868190Open ↗
▸BISWORK PERMIT APPLICATION3
12/07/2023340900966Open ↗
04/21/2022322101925Open ↗
04/21/2022322101925Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026B00683375-Z2Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00683375-P1Open ↗
08/13/2026B00683375-P8Open ↗
08/13/2026B00683375-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00683375-P8Open ↗
08/13/2026B00683375-P1Open ↗
08/13/2026B00683375-P6Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/12/2023340868190Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00683375-I1Open ↗
▸Seals & Professional Certifications93
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/27/2026B00829773-I1Open ↗
08/26/2026B00947739-I1Open ↗
08/26/2026B00968318-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026B00683375-P9Open ↗
09/02/2026B00683375-P9Open ↗
09/02/2026B00683375-P9Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B01050177-S2Open ↗
09/02/2026B00683375-P9Open ↗
09/02/2026B00683375-P9Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/23/2023340900966Open ↗
10/11/2022340868190Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/08/2023340900966Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/21/2022322101925Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00683375-S6Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist7
08/23/2026B00683375-S6Open ↗
08/23/2026B00683375-P1Open ↗
08/23/2026B00683375-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00683375-I1Open ↗
08/13/2026B00683375-S6Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/12/2023340868190Open ↗
▸BISSTREET TREE CHECKLIST1
06/20/2023340868190Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/21/2022322101925Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/07/2023340900966Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
04/21/2022322101925Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
04/21/2022322101925Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00642408-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/23/2023340900966Open ↗
10/23/2023340900966Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/23/2023340900966Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00683375-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT6
08/13/2026B00683375-P1Open ↗
08/13/2026B00683375-P9Open ↗
08/13/2026B00683375-P8Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/08/2023340900966Open ↗
12/07/2023340900966Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00683375-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00683375-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/21/2022322101925Open ↗
04/21/2022322101925Open ↗
04/21/2022322101925Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
02/14/2022322101925Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
05/12/2023340868190Open ↗
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
12/08/2023340868190Open ↗
▸Cost, Insurance & Ownership3
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
04/21/2022322101925Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/21/2022322101925Open ↗
▸BISCOST AFFIDAVIT1
10/26/2023340900966Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
10/26/2023340900966Open ↗
10/23/2023340900966Open ↗
06/20/2023340868190Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/23/2023340900966Open ↗
10/11/2022340868190Open ↗
▸BISEFILING COVER SHEET1
12/14/2021322101925Open ↗
▸BISBOROUGH INTAKE FORM1
12/11/2021322101925Open ↗
▸Other Documents28
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/13/2026B00683375-P2Open ↗
08/13/2026B00683375-P1Open ↗
08/13/2026B00683375-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026B00683375-P2Open ↗
08/13/2026B00683375-P6Open ↗
08/13/2026B00683375-P8Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/23/2026B00683375-P2Open ↗
08/23/2026B00683375-I1Open ↗
08/23/2026B00683375-P1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
06/20/2023340868190Open ↗
06/20/2023340868190Open ↗
06/20/2023340868190Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/21/2022322101925Open ↗
04/21/2022322101925Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00683375-S2Open ↗
08/13/2026B00683375-Z2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00683375-I1Open ↗