← Back
Five to six families
808 DEAN STREET
BROOKLYN · BIN 3027967
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
3,000 sfGross Floor Area
5Units
Rent Stabilized61 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 808 DEAN STREET CORP · 2,200 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 1 filing · 10 docs
Floor 2
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
451 CLASSON REALTY1204/09/2026
808 DEAN STREET CORP403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEE LLC107/09/2024
BILLAH ENGINEERING PLLC209/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALMUNIR CORPGeneral Contractor303/21/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
EBONY & IVORY P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369207/09/2024
BILLAH ENGINEERING5838106/08/2021
Building Lifecycle
All (75)Filed (3)Permit Issued (3)Signed Off (1)Violation (60)Inspection (2)Special Inspection (6)
06/08/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (HPD, open)
A
04/17/2026
Violation issued (ECB, open)
Construction
03/26/2026
Permit issued — General Construction
B01013784-I1-GC
11/20/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
08/26/2024
Signed off — Alteration
Filing for minor plumbing work to address ECB violation# 35409825X, work to replace (3) bathroom plumbing fixtures at existing bathroom inside 1st fl apartment as per plans.
B00590258-I1
07/09/2024
Filed — Alteration
FILING TO ADDRESS ECB VIOLATION# 39072412M, LEGALIZING REAR DECK, REPLACE CEILING JOIST AT 3RD FLOOR APT# 3R, INSTALL MINOR PARTITION TO ENLARGE BOILER RM AT CELLAR FL, INTERIOR FINISHES THROUGHOUT CELLAR.
B01013784-I1
07/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
07/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
04/09/2024
Violation issued (HPD, closed)
A
03/07/2024
Special inspection requirement — Final
RONALD VILLANO
11/22/2023
Violation issued (HPD, closed)
I
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2023
Violation issued (HPD, closed)
A
02/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2022
Violation issued (HPD, closed)
I
10/20/2022
Violation issued (ECB, open)
Construction
10/20/2022
Violation issued (ECB, open)
Construction
03/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
02/23/2022
Permit issued — Plumbing
B00590258-I1-PL
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Filed — Alteration
Filing for minor plumbing work to address ECB violation# 35409825X, work to replace (3) bathroom plumbing fixtures at existing bathroom inside 1st fl apartment as per plans.
B00590258-I1
09/15/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
09/15/2021
Special inspection requirement — Maintenance information
MOHAMMAD BILLAH
08/17/2021
Violation issued (ECB, closed)
Construction
07/30/2021
Permit issued — General Construction
B00531770-I1-GC
06/08/2021
Filed — Alteration
Filing for Minor interior work inside 1st fl Apartment, work includes new hardwood floor, and interior finishes throughout as per plans. no change in use, egress, or occupancy.
B00531770-I1
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
10/16/2018
Violation issued (HPD, closed)
I
11/21/2017
Violation issued (HPD, closed)
I
11/04/2016
Violation issued (HPD, closed)
I
10/21/2016
Violation issued (HPD, open)
B
08/04/2015
Violation issued (HPD, open)
B
12/21/2013
Violation issued (HPD, open)
A
12/21/2013
Violation issued (HPD, open)
C
12/21/2013
Violation issued (HPD, open)
A
12/21/2013
Violation issued (HPD, open)
A
12/21/2013
Violation issued (HPD, open)
B
12/21/2013
Violation issued (HPD, open)
C
12/21/2013
Violation issued (HPD, open)
C
12/21/2013
Violation issued (HPD, open)
A
12/21/2013
Violation issued (HPD, open)
B
12/21/2013
Violation issued (HPD, open)
A
12/21/2013
Violation issued (HPD, open)
A
07/17/2012
Violation issued (HPD, open)
B
02/27/2011
Violation issued (HPD, open)
B
04/20/2008
Violation issued (HPD, open)
B
05/13/2003
Violation issued (HPD, open)
B
06/28/1994
Violation issued (HPD, open)
B
06/28/1994
Violation issued (HPD, open)
B
06/28/1994
Violation issued (HPD, open)
B
06/28/1994
Violation issued (HPD, open)
B
06/26/1994
Violation issued (HPD, open)
B
06/26/1994
Violation issued (HPD, open)
B
06/26/1994
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE03/26/2026
DOB NOWPlumbingSigned-offEBONY & IVORY P & H CORP02/23/2022
DOB NOWGeneral ConstructionPermit IssuedALMUNIR CORP07/30/2021
1 project · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/09/2024Tenant Protection Plan ComplianceLuis Pichardospecial
07/09/2024Structural Stability – Alterations of existing buildingsLuis Pichardospecial
07/09/2024Fire-Resistant Penetrations and JointsLuis Pichardospecial
03/07/2024FinalRONALD VILLANOprogress
09/15/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
09/15/2021Maintenance informationMOHAMMAD BILLAHenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00531770-I1Request digital key ↗
09/01/2026B00590258-I1Request digital key ↗
08/24/2026B01013784-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01013784-P1Open ↗
08/24/2026B01013784-I1Open ↗
08/13/2026B00531770-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/22/2026B00590258-I1Open ↗
09/22/2026B00590258-I1Open ↗
09/01/2026B01013784-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01013784-I1Open ↗
09/01/2026B01013784-I1Open ↗
09/01/2026B01013784-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01013784-I1Open ↗
08/24/2026B01013784-P1Open ↗
08/13/2026B00531770-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00590258-I1Open ↗