Elevator apt, fireproof without stores
Sumner (NYCHA)
808 PARK AVENUE · BIN 3338596
💬 Discuss this project
1950Year Built
12Stories
D3Building Class
R6Zoning
429,900 sfGross Floor Area
514Units
LL97 Covered17 Open Violations 9 unresolved · 8 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 371,700 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
CellarUnder Construction45p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3509/13/2026
NYC HOUSING AUTHORITY2503/22/2026
NEW YORK CITY HOUSING AUTHORITY303/22/2026
NYCHA 99303/22/2026
VIKRANT CONTRACTING BUILDERS I203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC211/14/2025
CAMERON ENGINEERING501/14/2025
JUNE DANIEL ARCHITECT210/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES1003/21/2026
JMV ASSOCIATES LLC203/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
TAREK M ZEID P E203/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARDS PLUM & HTG CO,INGeneral Contractor807/08/2026
H&F IRON WORKSElectrical203/21/2026
FOY, REMERElectrical203/21/2026
J & N CONSTRUCTION GROUPGeneral Contractor207/03/2026
RICHARDS P AND H CO, INCPlumbing206/28/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
BOILERMAKER LOCAL 5Electrical103/21/2026
LAMPIRIS, DElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416207/07/2026
ALAN MARGOLIN & ASSOC423601/14/2025
Building Lifecycle
All (121)Filed (12)Permit Issued (16)Signed Off (1)Facade (FISP) (17)Violation (24)Inspection (5)Objection (20)Special Inspection (26)
08/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2026
Permit issued — Suspended Scaffold
B01422114-I1-SC
08/10/2026
Objection resolved — Addressed
07/21/2026
Objection raised — Other
07/07/2026
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01422114-I1
07/02/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01178389-I1
06/30/2026
Permit issued — Suspended Scaffold
B01178389-I1-SC
06/24/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
05/06/2026
Violation issued (ECB, open)
Construction
04/14/2026
Cycle 10 facade report submitted
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Cycle 10 facade report signed — UNSAFE
04/03/2026
Cycle 10 facade inspection completed
03/31/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/10/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/21/2026
Permit issued — Structural
B00596277-S3-ST
01/16/2026
Permit issued — Plumbing
B00596277-S1-PL
01/14/2026
Permit issued — Mechanical Systems
B00596277-S2-MS
01/14/2026
Permit issued — General Construction
B00596277-I1-GC
01/13/2026
Permit issued — General Construction
B00596277-S4-GC
11/17/2025
Permit issued — Suspended Scaffold
B01315741-I1-SC
11/17/2025
Permit issued — Sidewalk Shed
B01318297-I1-SH
11/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01318297-I1
11/14/2025
Permit issued — Construction Fence
B01318814-I1-FN
11/13/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01318814-I1
11/11/2025
Filed — Alteration
B01315741-I1
11/07/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2025
Permit issued — Suspended Scaffold
B01178389-I1-SC
02/20/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01178389-I1
02/07/2025
Special inspection requirement — Masonry
Young Suh
02/07/2025
Special inspection requirement — Exterior lighting power
Young Suh
02/07/2025
Special inspection requirement — Lighting controls
Young Suh
02/07/2025
Special inspection requirement — Interior lighting power
Young Suh
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
02/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
01/27/2025
Objection resolved — Addressed
01/15/2025
Permit issued — Plumbing
B00596277-S1-PL
01/14/2025
Filed — Alteration
NYCHA Sumner BOILER Bldg #10 - Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters
B00596277-P6
01/14/2025
Permit issued — General Construction
B00596277-S4-GC
01/14/2025
Permit issued — General Construction
B00596277-I1-GC
01/14/2025
Permit issued — Structural
B00596277-S3-ST
01/14/2025
Permit issued — Mechanical Systems
B00596277-S2-MS
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/21/2024
Objection raised — Other
10/07/2024
Filed — Alteration
NYCHA Sumner BOILER Bldg #10 - Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters
B00596277-P5
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2022
Violation issued (ECB, open)
Local Law
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2022
Objection resolved — Addressed
05/05/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
03/28/2022
Objection resolved — Addressed
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedZORIA HOUSING LLC08/11/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/30/2026
DOB NOWStructuralPermit IssuedRICHARDS PLUM & HTG CO,IN01/21/2026
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC01/16/2026
DOB NOWMechanical SystemsPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2026
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2026
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN01/13/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP11/17/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP11/17/2025
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP11/14/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/24/2025
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC01/15/2025
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2025
DOB NOWGeneral ConstructionPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2025
DOB NOWStructuralPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2025
DOB NOWMechanical SystemsPermit IssuedRICHARDS PLUM & HTG CO,IN01/14/2025
BISOTISSUEDPRO-METAL CONSTRUCTION12/10/2015
BISEQISSUEDPRO-METAL CONSTRUCTION12/09/2015
BISEQISSUEDPRO-METAL CONSTRUCTION12/09/2015
BISEQISSUEDVIKRANT CONTRACTING & BUILDER05/28/2015
BISEQISSUEDPRO-METAL CONSTRUCTION01/21/2015
BISEQISSUEDPRO-METAL CONSTRUCTION01/21/2015
BISOTISSUEDAKRO GENERAL CONTRACTING11/25/2014
BISOTISSUEDAKRO GENERAL CONTRACTING08/20/2014
BISEQISSUEDAKRO GENERAL CONTRACTING08/20/2014
BISEQISSUEDAKRO GENERAL CONTRACTING08/20/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER04/09/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/27/2014
BISOTISSUEDPIONEER GENERAL CONSTRUCT06/05/2013
BISEQISSUEDPIONEER GENERAL CONSTRUCT06/05/2013
BISEQISSUEDPIONEER GENERAL CONSTRUCT06/05/2013
BISEQISSUEDPIONEER GENERAL CONSTRUCT06/05/2013
BISEQISSUEDTECHNICO CONSTRUCTION03/01/2013
BISEQISSUEDPIONEER GENERAL CONSTRUCT12/06/2012
BISOTISSUEDPIONEER GENERAL CONSTRUCT10/03/2012
BISEQISSUEDPIONEER GENERAL CONSTRUCT09/27/2012
BISEQISSUEDPIONEER GENERAL CONSTRUCT09/26/2012
BISEQISSUEDTECHNICO CONSTRUCTION03/07/2012
BISEQISSUEDTECHNICO CONSTRUCTION04/14/2011
BISEQISSUEDTECHNICO CONSTRUCTION08/26/2010
+ 8 more permits on file
1 project · most recent 01/14/2025
Others
FiledStatusContractorScope
01/14/2025Permit IssuedRICHARDS PLUM & HTG CO,INOthers
1 project · most recent 01/14/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/14/2025Permit IssuedRICHARDS P AND H CO, INCGas, Storm, Water/Sanitary
8 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedLIT MODE ELECL CONTG INC—
06/30/2026Permit IssuedLIT MODE ELECL CONTG INC—
01/15/2026Permit IssuedGILSTON ELEC'L CONTNG LLCGeneral Wiring
10/13/2025Permit IssuedLIT MODE ELECL CONTG INC—
09/07/2025CompleteCSI SEC & ELECTRIC INCGeneral Wiring
01/17/2025CompleteGILSTON ELEC'L CONTNG LLC—
05/07/2019CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
05/07/2019CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
1 project · most recent 01/14/2025
Steel Concrete
FiledStatusContractorScope
01/14/2025Permit IssuedRICHARDS PLUM & HTG CO,INSteel, Concrete
2 projects · most recent 11/14/2025
Sidewalk Shed Fence
FiledStatusContractorScope
11/14/2025Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
11/13/2025Permit IssuedJ & N CONSTRUCTION GROUPFence
2 projects · most recent 07/07/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/07/2026Permit IssuedZORIA HOUSING LLCSuspended Scaffold (SC)
02/20/2025Signed-offSTRUCTUAL PRESV SYSTEM—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/10/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/24/2026Post-installed AnchorsJOEL PHAGOOspecial
11/07/2025Post-installed AnchorsJOEL PHAGOOspecial
02/07/2025MasonryYoung Suhspecial
02/07/2025Exterior lighting powerYoung Suhenergy_progress
02/07/2025Lighting controlsYoung Suhenergy_progress
02/07/2025Interior lighting powerYoung Suhenergy_progress
02/07/2025Energy Code Compliance InspectionsYoung Suhprogress
02/07/2025Tenant Protection Plan ComplianceYoung Suhspecial
02/07/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
01/14/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
01/10/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
11/04/2021HVAC-R and service water heating system controlsYoung Suhenergy_progress
11/04/2021HVAC-R and service water piping design and insulationYoung Suhenergy_progress
11/04/2021Shutoff dampersYoung Suhenergy_progress
11/04/2021Chimneys and ventsYoung Suhspecial
11/04/2021Heating SystemsYoung Suhspecial
11/04/2021Fire-Resistant Penetrations and JointsYoung Suhspecial
11/04/2021HVAC-R and service water heating equipmentYoung Suhenergy_progress
10/18/2021FinalYoung Suhprogress
10/18/2021Concrete - Cast-In-PlaceYoung Suhspecial
10/18/2021Post-installed AnchorsYoung Suhspecial
10/18/2021Structural Steel - High Strength BoltingYoung Suhspecial
10/18/2021Structural Steel - WeldingYoung Suhspecial
10/18/2021Mechanical SystemsYoung Suhspecial
10/18/2021Structural Steel - DetailsYoung Suhspecial
Latest 25 of 26.
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/23/2026B00596277-P6Request digital key ↗
08/23/2026B00596277-S2Request digital key ↗
08/23/2026B00596277-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION21
12/10/2015340240643Open ↗
05/27/2015340264859Open ↗
01/18/2015340209483Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
06/03/2015340240643Open ↗
05/27/2015340264859Open ↗
05/13/2015340240643Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/13/2017340240643Open ↗
11/09/2016340264859Open ↗
11/04/2016340264859Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B00596277-P6Open ↗
08/23/2026B00596277-P5Open ↗
08/23/2026B00596277-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/30/2026B00596277-S2Open ↗
09/02/2026B01315741-I1Open ↗
09/01/2026B00596277-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/21/2014320989757Open ↗
09/27/2012320543756Open ↗
09/27/2012320543550Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/27/2015340264859Open ↗
01/18/2015340209483Open ↗
01/18/2015340209474Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/30/2026B00596277-S2Open ↗
09/30/2026B00596277-S2Open ↗
08/28/2026B00596277-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/27/2015340264859Open ↗
01/18/2015340209483Open ↗
01/18/2015340209474Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
05/27/2015340264859Open ↗
01/18/2015340209483Open ↗
01/18/2015340209474Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
09/27/2012320543756Open ↗
09/27/2012320543550Open ↗
08/30/2010320211178Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/04/2015340240643Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/11/2012320503497Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/23/2026B00596277-S2Open ↗
08/23/2026B00596277-S1Open ↗
08/15/2026B00596277-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/09/2015320503497Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/10/2015340240643Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/30/2010320211178Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/13/2017340240643Open ↗
10/09/2015320503497Open ↗
10/05/2012320503497Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/27/2015340264859Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/09/2015320503497Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/11/2012320503497Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/01/2015340240643Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/17/2015340240643Open ↗
05/27/2015340264859Open ↗
01/18/2015340209483Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/27/2015340264859Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/23/2026B00596277-P6Open ↗
08/23/2026B00596277-S2Open ↗
08/23/2026B00596277-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026B00596277-S1Open ↗
08/13/2026B00596277-S3Open ↗
08/13/2026B00596277-S4Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/21/2014320989757Open ↗
09/27/2012320543756Open ↗
09/27/2012320543550Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/13/2017340240643Open ↗
11/09/2016340264859Open ↗
04/11/2016340209483Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/09/2015320503497Open ↗
03/12/2012320211178Open ↗
08/30/2010320211178Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
03/07/2013320211178Open ↗
03/07/2013320211178Open ↗
▸BISSHED LETTER1
03/03/2014320211178Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
06/13/2017340240643Open ↗
10/09/2015320503497Open ↗
07/17/2015340240643Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
07/11/2012320503497Open ↗
▸Filing & Intake Forms11
▸BISEFILING JOB APPLICATION COVER SHEET8
05/27/2015340264859Open ↗
05/04/2015340240643Open ↗
01/18/2015340209483Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET2
06/21/2014320989757Open ↗
09/26/2012320543756Open ↗
▸BISADDITIONAL INFORMATION1
06/01/2015340240643Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/14/2026B01422114-I1Open ↗
08/13/2026B01315741-I1Open ↗
▸DOB NOWCalculations2
08/14/2026B01422114-I1Open ↗
08/13/2026B01315741-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
12/06/2012340027429Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01178389-I1Open ↗