Three families
809 E 218TH STREET
BRONX · BIN 2130378
💬 Discuss this project
2022Year Built
2Stories
C0Building Class
R5Zoning
3,696 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: 809 E 218 LLC · 3,016 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof3p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
809 E 218 LLC203/22/2026
3750 BARNES DEVELOPMENT1303/21/2026
TOP DEVELOPMENT803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2024$973K—— → —$263/sf building
01/07/2019$425K—Private party → 3750 BARNES DEVELOPMENT LLC— not available
01/08/2016$398K—SAGI, INC. → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOSTAFA407/20/2022
L & C ASSOCIATES406/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES403/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor507/08/2026
MANHATTAN CONSTRUCTION &General Contractor407/08/2026
W.JAKE CONSTRUCTION CORPGeneral Contractor407/08/2026
CASE PLUMBING LLCFire Protection307/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing207/08/2026
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
CHI WAI CHUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519507/20/2022
Building Lifecycle
All (67)Filed (8)Permit Issued (15)Signed Off (5)Violation (1)Inspection (8)Special Inspection (30)
11/18/2025
Violation issued (HPD, closed)
I
11/14/2023
Signed off — Alteration
X00250866-I1
11/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/02/2023
Signed off — Alteration
PROVIDE SPRINKLER SYSTEM & PLUMBING SYSTEM THROUGHOUT THE NEW THREE-STORY RESIDENTIAL BUILDING.
X00250914-I1
10/27/2023
Signed off — Alteration
X00250534-I1
10/26/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/02/2023
Permit issued — Curb Cut
X00250866-I1-CC
08/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/27/2023
Signed off — Alteration
PROPOSED MECHANICAL SYSTEMS FOR THE NEW THREE-STORY RESIDENTIAL BUILDING.
X00250918-I1
07/24/2023
Signed off — Alteration
SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH NB JOB # 210180347
X00383503-I1
07/22/2023
Permit issued — Plumbing
X00250914-I1-EW-SP
07/06/2023
Permit issued — Structural
X00383503-I1-ST
06/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2023
Permit issued — Construction Fence
X00250534-I1-FN
04/05/2023
Permit issued — Mechanical Systems
X00250918-I1-MS
02/17/2023
Permit issued — Plumbing
X00250914-I1-PL
11/01/2022
Permit issued — Construction Fence
X00250534-I1-FN
10/26/2022
Permit issued — Sprinklers
X00250914-I1-EW-SP
09/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2022
Special inspection requirement — Masonry
Younes Abouyaala
07/22/2022
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/22/2022
Special inspection requirement — Final
NAVEEN KUMAR
07/22/2022
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Younes Abouyaala
07/22/2022
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
07/20/2022
Filed — Alteration
SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH NB JOB # 210180347
X00383503-P3
05/31/2022
Permit issued — Structural
X00383503-I1-ST
05/31/2022
Permit issued — Construction Fence
X00250534-I1-FN
03/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/15/2022
Permit issued — Construction Fence
X00250534-I1-FN
02/10/2022
Permit issued — Structural
X00383503-I1-ST
12/27/2021
Filed — Alteration
SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH NB JOB # 210180347
X00383503-P2
12/27/2021
Permit issued — Plumbing
X00250914-I1-EW-SP
12/14/2021
Special inspection requirement — Masonry
Younes Abouyaala
12/14/2021
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
12/14/2021
Special inspection requirement — Final
NAVEEN KUMAR
12/14/2021
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Younes Abouyaala
12/14/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
12/03/2021
Permit issued — Sprinklers
X00250914-I1-PL
09/23/2021
Permit issued — Construction Fence
X00250534-I1-FN
06/07/2021
Filed — Alteration
SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH NB JOB # 210180347
X00383503-P1
06/02/2021
Filed — Alteration
PROVIDE SPRINKLER SYSTEM & PLUMBING SYSTEM THROUGHOUT THE NEW THREE-STORY RESIDENTIAL BUILDING.
X00250914-I1
06/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/02/2021
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
05/27/2021
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
05/27/2021
Special inspection requirement — Final
05/27/2021
Special inspection requirement — Structural Wood Frame
05/27/2021
Special inspection requirement — Masonry
05/27/2021
Special inspection requirement — Structural Cold-Formed Steel
04/12/2021
Filed — Alteration
SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH NB JOB # 210180347
X00383503-I1
09/03/2020
Filed — Alteration
X00250866-I1
08/28/2020
Filed — Alteration
PROPOSED MECHANICAL SYSTEMS FOR THE NEW THREE-STORY RESIDENTIAL BUILDING.
X00250918-I1
08/26/2020
Filed — Alteration
X00250534-I1
08/26/2020
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
08/26/2020
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
08/26/2020
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
08/26/2020
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
08/26/2020
Special inspection requirement — Heating Systems
Younes Abouyaala
08/26/2020
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offKAIETEUR CONSTRUCTION INC10/02/2023
DOB NOWPlumbingSigned-offS & L PLUMBING INC07/22/2023
DOB NOWStructuralSigned-offKAIETEUR CONSTRUCTION INC07/06/2023
DOB NOWConstruction FenceSigned-offMANHATTAN CONSTRUCTION &05/19/2023
DOB NOWMechanical SystemsSigned-offKAIETEUR CONSTRUCTION INC04/05/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI02/17/2023
DOB NOWConstruction FenceSigned-offMANHATTAN CONSTRUCTION &11/01/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC10/26/2022
DOB NOWStructuralSigned-offGOLDEN GATE BAPAZ CONSTRU05/31/2022
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU05/31/2022
DOB NOWConstruction FenceSigned-offW.JAKE CONSTRUCTION CORP02/15/2022
DOB NOWStructuralSigned-offW.JAKE CONSTRUCTION CORP02/10/2022
DOB NOWPlumbingSigned-offS & L PLUMBING INC12/27/2021
DOB NOWSprinklersSigned-offSUPERIOR PLUMBING & HEATI12/03/2021
DOB NOWConstruction FenceSigned-offMANHATTAN CONSTRUCTION &09/23/2021
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.04/23/2024
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.08/02/2023
BISOTISSUEDKAIETEUR CONSTRUCTION INC.04/20/2023
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.02/27/2023
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.02/08/2023
BIS—ISSUEDGOLDEN GATE BAPAZ CONSTRU03/21/2022
BIS—ISSUEDW.JAKE CONSTRUCTION CORP10/19/2021
BIS—ISSUEDW.JAKE CONSTRUCTION CORP10/19/2021
BIS—ISSUEDW.JAKE CONSTRUCTION CORP10/19/2021
BIS—ISSUEDGOLDEN GATE BAPAZ CONSTRU10/18/2021
3 projects · most recent 08/03/2023
General Wiring
FiledStatusContractorScope
08/03/2023CompleteJOSEPH WEINSTEIN ELECTRIC—
07/31/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/14/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/26/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/22/2022MasonryYounes Abouyaalaspecial
07/22/2022Structural Wood FrameYounes Abouyaalaprogress
07/22/2022FinalNAVEEN KUMARprogress
07/22/2022Wood – Metal-Plate-Connected TrussesYounes Abouyaalaspecial
07/22/2022Structural Cold-Formed SteelYounes Abouyaalaspecial
12/14/2021MasonryYounes Abouyaalaspecial
12/14/2021Structural Wood FrameYounes Abouyaalaprogress
12/14/2021FinalNAVEEN KUMARprogress
12/14/2021Wood – Metal-Plate-Connected TrussesYounes Abouyaalaspecial
12/14/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
06/02/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/02/2021HVAC insulation and sealing Younes Abouyaalaenergy_progress
05/27/2021Wood – Metal-Plate-Connected Trusses—special
05/27/2021Final—progress
05/27/2021Structural Wood Frame—progress
05/27/2021Masonry—special
05/27/2021Structural Cold-Formed Steel—special
08/26/2020HVAC and service water heating system controls Younes Abouyaalaenergy_progress
08/26/2020HVAC and service water heating equipment Younes Abouyaalaenergy_progress
08/26/2020HVAC insulation and sealing Younes Abouyaalaenergy_progress
08/26/2020HVAC and service water heating system controls Younes Abouyaalaenergy_progress
08/26/2020Heating SystemsYounes Abouyaalaspecial
08/26/2020Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/26/2020Shutoff dampersYounes Abouyaalaenergy_progress
08/26/2020Permanent certificateYounes Abouyaalaenergy_progress
Latest 25 of 30.
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Structural4
08/25/2026X00383503-P3Request digital key ↗
08/25/2026X00383503-P2Request digital key ↗
08/25/2026X00383503-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00250918-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00250866-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00250914-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00250914-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00250534-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION21
01/08/2024210180347Open ↗
12/27/2023210180347Open ↗
12/21/2023210180347Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION7
04/20/2023240343142Open ↗
02/10/2023210180347Open ↗
04/01/2022210180347Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/24/2021240268376Open ↗
09/15/2020240268376Open ↗
02/07/2020240268376Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
06/03/2024210180347Open ↗
02/13/2020210180347Open ↗
02/03/2020201121400Open ↗
▸BISZONING DIAGRAM3
04/23/2024210180347Open ↗
09/15/2021210180347Open ↗
04/08/2021210180347Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/13/2020210180347Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/13/2020210180347Open ↗
▸BISVERIFY TAX LOT1
10/19/2023210180347Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/13/2020210180347Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/19/2023210180347Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026X00250918-I1Open ↗
09/01/2026X00250918-I1Open ↗
09/01/2026X00250918-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026X00250918-I1Open ↗
09/01/2026X00250918-I1Open ↗
08/28/2026X00250914-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00250534-I1Open ↗
08/26/2026X00250918-I1Open ↗
08/26/2026X00250866-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/17/2023240343142Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/07/2020240268376Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/17/2023240343142Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/22/2023210180347Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/22/2023210180347Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/19/2023210180347Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/19/2023210180347Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST5
06/03/2024210180347Open ↗
09/15/2021210180347Open ↗
09/10/2020210180347Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/30/2021210180347Open ↗
09/30/2021210180347Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/15/2020240268376Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/05/2023240343142Open ↗
04/18/2023240343142Open ↗
03/17/2023240343142Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/05/2023240343142Open ↗
08/22/2023210180347Open ↗
▸BISINTERIOR LIGHTING POWER1
08/22/2023210180347Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2023210180347Open ↗
▸BISFENESTRATION AREAS1
08/22/2023210180347Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/22/2023210180347Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/17/2023240343142Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/05/2023240343142Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/22/2023210180347Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/22/2023210180347Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00250914-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY12
09/05/2023240343142Open ↗
04/18/2023240343142Open ↗
03/17/2023240343142Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/03/2024210180347Open ↗
09/30/2021210180347Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/04/2021210180347Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/22/2023210180347Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/22/2023210180347Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/22/2023210180347Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/22/2023210180347Open ↗
▸BISSOIL REPORT1
02/13/2020210180347Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE3
10/16/2023210180347Open ↗
02/18/2020210180347Open ↗
01/17/2020210180347Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/24/2022210180347Open ↗
10/20/2021210180347Open ↗
10/20/2021210180347Open ↗
▸BISSUPERSEDING LETTER3
02/10/2023210180347Open ↗
03/24/2022210180347Open ↗
10/20/2021210180347Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE5
02/10/2023210180347Open ↗
03/24/2022210180347Open ↗
10/20/2021210180347Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT1
03/17/2023240343142Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/08/2023240268376Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/05/2023240343142Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION11
01/10/2024210180347Open ↗
08/28/2023210180347Open ↗
08/28/2023210180347Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM3
10/20/2021210180347Open ↗
10/07/2021210180347Open ↗
02/03/2020201121400Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/17/2023240343142Open ↗
02/07/2020240268376Open ↗
▸DOB NOWAI1 Form2
08/13/2026X00383503-I1Open ↗
08/13/2026X00383503-P3Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/07/2020240268376Open ↗
▸BISEFILING COVER SHEET1
07/08/2020210180347Open ↗
▸Other Documents25
▸BISBPP - SUPPORTING DOCUMENTATION8
12/08/2023240268376Open ↗
12/08/2023240268376Open ↗
12/08/2023240268376Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION7
04/23/2024210180347Open ↗
09/24/2021240268376Open ↗
09/22/2021210180347Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM3
04/08/2021210180347Open ↗
09/10/2020210180347Open ↗
02/13/2020210180347Open ↗
▸BISSHUTOFF DAMPERS1
08/22/2023210180347Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/08/2021210180347Open ↗
▸BISLOWEST FLOOR ELEVATION1
08/22/2023210180347Open ↗
▸BISMAINTENANCE INFORMATION1
08/22/2023210180347Open ↗
▸BISTax Abatement Miscellaneous1
09/06/2023240343142Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
08/22/2023210180347Open ↗
▸BISPERMANENT CERTIFICATE1
08/22/2023210180347Open ↗