← Back
BuildNYC
Other college and university
Newman Hall
81-06 UTOPIA PARKWAY · BIN 4595652
💬 Discuss this project
1950Year Built
5Stories
W6Building Class
R4Zoning
4,687,440 sfGross Floor Area
6Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Other college and university · 4,106,280 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSt. John's University1p · 1 filing · 2 docs
Site & exteriorSt. John's UniversityUnder Construction12p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St John's University807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf204/01/2026
AR Consulting Engineer101/12/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold507/08/2026
Joreich Restoration Groupspecialty_contractor104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR Consulting Engineer P4054101/12/2026
Building Lifecycle
All (17)Filed (3)Permit Issued (6)Signed Off (1)Inspection (2)Objection (2)Special Inspection (3)
09/11/2026
Signed off — Alteration
EXTERIOR FACADE REPAIRS INCLUDES REPLACEMENT OF PARAPET ALONG EXPOSURES 1, 2, 3 & 4. SHELF ANGLE REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01297164-I1
07/06/2026
Permit issued — Supported Scaffold
Q01380891-I1-SH
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2026
Permit issued — Structural
Q01297164-I1-GC-CX
04/02/2026
Permit issued — Supported Scaffold
Q01380891-I1-SH
04/02/2026
Permit issued — Supported Scaffold
Q01380891-I1-SF
04/02/2026
Permit issued — Sidewalk Shed
Q01380891-I1-FN
04/01/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDIN, HEAVY DUTY SIDEWALK SHED, AND PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01380891-I1
04/01/2026
Permit issued — Protection and Mechanical Methods
Q01380881-I1-PMM
03/31/2026
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AND ASSOCIATED SCAFFOLD AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CHUTE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022
Q01380881-I1
02/17/2026
Objection resolved — Addressed
02/16/2026
Objection raised — Cost
01/12/2026
Filed — Alteration
EXTERIOR FACADE REPAIRS INCLUDES REPLACEMENT OF PARAPET ALONG EXPOSURES 1, 2, 3 & 4. SHELF ANGLE REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01297164-I1
01/07/2026
Special inspection requirement — Masonry
QAZI RAZZAK
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
QAZI RAZZAK
10/02/2025
Special inspection requirement — Final
MOHSIN BHUIYAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold07/06/2026
DOB NOWStructuralSigned-offJoreich Restoration Group04/09/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold04/02/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold04/02/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold04/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold04/01/2026
1 project · most recent 03/27/2026
FiledStatusContractorScope
03/27/2026Permit IssuedNash Electric Services—
1 project · most recent 01/12/2026
Masonry
FiledStatusContractorScope
01/12/2026Signed-offJoreich Restoration GroupMasonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/07/2026MasonryQAZI RAZZAKspecial
01/07/2026Structural Stability – Alterations of existing buildingsQAZI RAZZAKspecial
10/02/2025FinalMOHSIN BHUIYANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. John's UniversityEducationRoof
Project Q01380891 Alteration · Permit Entire · 04/01/2026
Project Q01380881 Alteration · Permit Entire · 03/31/2026
Project Q01297164 Alteration · LOC Issued · 01/12/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01297164-I1Request digital key ↗
08/17/2026Q01380881-I1Request digital key ↗
08/17/2026Q01380891-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01297164-I1Open ↗
08/17/2026Q01380881-I1Open ↗
08/17/2026Q01380891-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01297164-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01297164-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01297164-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/17/2026Q01380881-I1Open ↗
08/17/2026Q01380891-I1Open ↗
08/13/2026Q01297164-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01297164-I1Open ↗