← Back
BuildNYC
Large suburban residence
81-08 193RD STREET
QUEENS · BIN 4156508
💬 Discuss this project
2025Year Built
2Stories
A3Building Class
R2AZoning
3,587 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Large suburban residence · 6,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
AtticUnder Construction49p · 1 filing · 20 docs
Floor 2Under Construction60p · 1 filing · 20 docs
Floor 1Under Construction62p · 1 filing · 20 docs
CellarUnder Construction59p · 1 filing · 20 docs
Site & exteriorUnder Construction69p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2025$1.5M—193 STREET HOLDINGS LLC → Private party$413/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects604/01/2026
Ras PE Consulting Engineers506/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J. Caliendo R.A803/21/2026
Dmconsulting6860403/21/2026
Gerald J Caliendo Rapc803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB Renovation & ModelingGeneral Contractor504/09/2026
SB Renovation & ModelingScaffold207/08/2026
DPH Plumbing & HeatingPlumbing106/28/2026
Just Plumbing & HeatingPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection15191104/01/2026
Building Lifecycle
All (73)Filed (11)Permit Issued (9)Signed Off (3)Violation (2)Inspection (4)Objection (14)Special Inspection (30)
07/09/2026
Permit issued — Plumbing
Q01188853-S5-PL
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-S4
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-S3
05/04/2026
Permit issued — Construction Fence
Q01188853-S1-FN
04/28/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
04/28/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
04/28/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/28/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/28/2026
Special inspection requirement — Final
NAVEEN KUMAR
04/28/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
04/28/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/28/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/28/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/28/2026
Special inspection requirement — Masonry
Younes Abouyaala
04/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
04/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/28/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/28/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/28/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
04/28/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/28/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-P5
03/30/2026
Permit issued — Mechanical Systems
Q01188853-I1-GC-CX
03/29/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/29/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
02/09/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-S2
02/03/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-P4
10/27/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/02/2025
Objection resolved — Addressed
08/15/2025
Objection raised — Cost
07/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-P3
06/25/2025
Permit issued — Plumbing
Q01188853-S5-PL
06/24/2025
Objection resolved — Addressed
06/18/2025
Objection raised — Admin
06/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-P1
06/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-P2
06/06/2025
Violation issued (ECB, closed)
Construction
06/04/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Energy
05/29/2025
Permit issued — Support of Excavation
Q01188853-S2-SE
05/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILING FOR STRUCTURAL DESIGN OF 2-STORY ALT-1 BUILDING FILED UNDER DOB NOW JOB # Q01188853-S4. THE PROP. DESIGN INCLUDE STEEL & WOOD FRAMED STRUCTURE ALONG WITH PARTIAL DEMOLITION. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB # Q01188853-I1
Q01188853-S5
05/12/2025
Objection resolved — Addressed
05/09/2025
Permit issued — Structural
Q01188853-S4-ST
05/09/2025
Permit issued — Foundation
Q01188853-S3-FO-EA
05/07/2025
Permit issued — General Construction
Q01188853-I1-GC-CX
05/07/2025
Permit issued — Construction Fence
Q01188853-S1-FN
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJust Plumbing & Heating07/09/2026
DOB NOWConstruction FencePermit IssuedSB Renovation & Modeling05/04/2026
DOB NOWMechanical SystemsPermit IssuedSB Renovation & Modeling03/30/2026
DOB NOWPlumbingPermit IssuedDPH Plumbing & Heating06/25/2025
DOB NOWSupport of ExcavationSigned-offSB Renovation & Modeling05/29/2025
DOB NOWStructuralSigned-offSB Renovation & Modeling05/09/2025
DOB NOWFoundationSigned-offSB Renovation & Modeling05/09/2025
DOB NOWGeneral ConstructionPermit IssuedSB Renovation & Modeling05/07/2025
DOB NOWConstruction FencePermit IssuedSB Renovation & Modeling05/07/2025
BISOTISSUEDSamon Construction11/25/2005
BISOTISSUEDGentile Associatec07/16/1999
BISOTISSUEDCervinka & Co03/10/1995
BISPLISSUEDHudson River Mechanical Group I04/01/1994
BISOTISSUEDHoti Construction01/26/1994
1 project · most recent 04/01/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/01/2026Permit IssuedSB Renovation & ModelingHeating Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×12
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×12
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×9
1 project · most recent 04/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/01/2026Permit IssuedJust Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
06/20/2025Permit IssuedWCK ElectricGeneral Wiring
1 project · most recent 04/01/2026
Steel Concrete Wood
FiledStatusContractorScope
04/01/2026Permit IssuedJust Plumbing & HeatingSteel, Concrete, Wood
1 project · most recent 04/01/2026
Fence
FiledStatusContractorScope
04/01/2026Permit IssuedJust Plumbing & HeatingFence
1 project · most recent 04/01/2026
Earthwork
FiledStatusContractorScope
04/01/2026Permit IssuedJust Plumbing & HeatingEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/03/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
04/28/2026Subgrade InspectionsYounes Abouyaalaspecial
04/28/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/28/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/28/2026Maintenance informationYounes Abouyaalaenergy_progress
04/28/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/28/2026Interior lighting powerYounes Abouyaalaenergy_progress
04/28/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
04/28/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/28/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/28/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/28/2026Ventilation and air distribution systemYounes Abouyaalaenergy_progress
04/28/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/28/2026Fenestration air leakageYounes Abouyaalaenergy_progress
04/28/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
04/28/2026Air barrier — testing Younes Abouyaalaenergy_progress
04/28/2026Permanent certificateYounes Abouyaalaenergy_progress
04/28/2026Fenestration areasYounes Abouyaalaenergy_progress
04/28/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/28/2026FinalNAVEEN KUMARprogress
04/28/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/28/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/28/2026Mechanical SystemsYounes Abouyaalaspecial
04/28/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/28/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
04/28/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
Latest 25 of 116.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/17/2026Q01188853-P5Request digital key ↗
08/17/2026Q01188853-P4Request digital key ↗
08/17/2026Q01188853-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q01188853-P2Open ↗
09/01/2026Q01188853-S3Open ↗
09/01/2026Q01188853-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/03/2026Q01188853-S2Open ↗
09/01/2026Q01188853-P2Open ↗
09/01/2026Q01188853-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-S4Open ↗
08/13/2026Q01188853-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P2Open ↗
08/13/2026Q01188853-P1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01188853-S3Open ↗
08/13/2026Q01188853-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-I1Open ↗
08/13/2026Q01188853-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01188853-P5Open ↗
08/13/2026Q01188853-P3Open ↗
08/13/2026Q01188853-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01188853-S2Open ↗
08/13/2026Q01188853-S3Open ↗