← Back
Public elementary, junior or senior high
Irwin Altman Middle School 172
81-14 256 STREET · Glen Oaks-Floral Park-New Hyde Park · BIN 4178464
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R2AZoning
171,000 sfGross Floor Area
0Units
LL97 Covered12 Open Violations 5 unresolved · 7 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 120,000 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 20 docs
Floor 3Under Construction5p · 1 filing · 20 docs
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
BasementUnder Construction2p · 2 filings · 20 docs
Sub-BasementUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3708/26/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DOE J.H.S.172 040703/22/2026
D.O.E. P.S.172 0303/22/2026
NYC PARKS 0103/22/2026
DEPT OF EDUCATION JHS 172503/22/2026
DEPT OF EDUCATION J.H.S.1503/22/2026
D.O.E. P.S.172103/22/2026
DOE 040503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYMS CONSULTING, LLC212/24/2025
EME GROUP/SALAS O'BRIEN205/12/2025
NYCSCA209/20/2024
NYC SCA109/20/2024
INFINITY DESIGN CONSULTANT INC410/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LITEHOUSE BUILDERS INCGeneral Contractor2407/08/2026
CENTRAL MECHANICAL SYSTEMS INCGeneral Contractor1308/26/2026
OLYMPIC PLBG & HTG SVC INPlumbing207/02/2026
FRANCIS RICHARDSElectrical103/21/2026
RAIDEN ELECTRIC, LLCElectrical103/22/2026
SORTINO JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400712/24/2025
Building Lifecycle
All (150)Filed (11)Permit Issued (28)Signed Off (1)Violation (60)Inspection (1)Objection (20)Special Inspection (29)
08/18/2026
Permit issued — Structural
Q01110919-I1-GC
08/18/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2026
Permit issued — Supported Scaffold
Q01125356-I1-SF
08/05/2026
Permit issued — Structural
Q01110919-I1-ST
08/05/2026
Permit issued — Mechanical Systems
Q01110919-S1-MS
07/01/2026
Signed off — Alteration
Q00650387-I1
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
02/05/2026
Permit issued — Plumbing
Q01110919-S2-PL
01/05/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
12/24/2025
Filed — Alteration
JHS 172Q, INSTALLATION OF SUPPORTED SCAFFOLD AND STAIR TOWER TO ACCESS THE EXISTING MASONRY CHIMNEY TOP TO INSTALL NEW CHIMNEY LINER/S SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # Q01110919. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01125356-P1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
10/10/2025
Permit issued — Construction Fence
Q00650387-I1-FN
10/10/2025
Permit issued — Supported Scaffold
Q00650386-I1-SF
10/09/2025
Violation issued (FDNY_ORDER, closed)
10/09/2025
Violation issued (FDNY_ORDER, closed)
10/09/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Permit issued — Structural
Q01110919-I1-ST
09/25/2025
Permit issued — Supported Scaffold
Q01125356-I1-SF
09/25/2025
Permit issued — Structural
Q01110919-I1-GC
09/25/2025
Permit issued — Mechanical Systems
Q01110919-S1-MS
08/25/2025
Violation issued (ECB, open)
Boilers
08/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
06/13/2025
Objection resolved — Addressed
06/11/2025
Violation issued (FDNY_ORDER, closed)
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Zoning
06/02/2025
Objection raised — Zoning
05/28/2025
Objection raised — Mechanical
05/28/2025
Objection raised — Other
05/28/2025
Objection raised — Zoning
05/28/2025
Objection raised — Zoning
05/28/2025
Objection raised — Plumbing
05/12/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN GYMNASIUM SPACE.
Q01218569-I1
05/12/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN CAFETERIA.
Q01218868-I1
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
04/30/2025
Special inspection requirement — Mechanical Systems
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2025
Special inspection requirement — Post-installed Anchors
04/30/2025
Special inspection requirement — Maintenance information
Asma Hashmi
04/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
04/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
04/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
04/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/30/2025
Special inspection requirement — Maintenance information
04/30/2025
Special inspection requirement — Final
04/30/2025
Special inspection requirement — Mechanical Systems
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2025
Special inspection requirement — Post-installed Anchors
04/30/2025
Special inspection requirement — Final
Asma Hashmi
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/18/2026
DOB NOWSupported ScaffoldPermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/06/2026
DOB NOWStructuralPermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/05/2026
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/05/2026
DOB NOWPlumbingPermit IssuedOLYMPIC PLBG & HTG SVC IN02/05/2026
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC10/10/2025
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC10/10/2025
DOB NOWStructuralPermit IssuedCENTRAL MECHANICAL SYSTEM09/25/2025
DOB NOWSupported ScaffoldPermit IssuedCENTRAL MECHANICAL SYSTEM09/25/2025
DOB NOWStructuralPermit IssuedCENTRAL MECHANICAL SYSTEM09/25/2025
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEM09/25/2025
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC02/27/2025
DOB NOWPlumbingPermit IssuedOLYMPIC PLBG & HTG SVC IN11/07/2024
DOB NOWSupported ScaffoldPermit IssuedCENTRAL MECHANICAL SYSTEM10/15/2024
DOB NOWGeneral ConstructionPermit IssuedCENTRAL MECHANICAL SYSTEM10/15/2024
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEM10/15/2024
DOB NOWStructuralPermit IssuedCENTRAL MECHANICAL SYSTEM10/15/2024
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC09/11/2024
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC09/11/2024
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC02/29/2024
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC09/20/2023
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC09/20/2023
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC02/16/2023
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC02/16/2023
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC01/27/2023
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC02/07/2022
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC02/04/2022
DOB NOWConstruction FenceSigned-offLITEHOUSE BUILDERS INC01/25/2022
BISOTISSUEDLITEHOUSE BUILDERS INC07/08/2025
BISOTISSUEDLITEHOUSE BUILDERS INC07/08/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/25/2025
BISOTISSUEDLITEHOUSE BUILDERS INC03/19/2025
BISOTISSUEDLITEHOUSE BUILDERS INC08/07/2024
BISOTISSUEDLITEHOUSE BUILDERS INC08/07/2024
BISPLISSUEDFORSYTHE P&H CORP08/06/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/02/2024
BISOTISSUEDLITEHOUSE BUILDERS INC07/13/2023
BISOTISSUEDLITEHOUSE BUILDERS INC07/13/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/27/2023
BISOTISSUEDLITEHOUSE BUILDERS INC07/11/2022
+ 38 more permits on file
3 projects · most recent 05/12/2025
Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2025——Air Conditioning Systems
Cooling
Fujitsu ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×10
AOU120RLAVL 120,000 BTU · Condensing Unit ×2
AOU72RLAVL 72,000 BTU · Condensing Unit ×2
05/12/2025——Air Conditioning Systems
Cooling
Fujitsu CASSETTE - AUUB48TLAV2 48,000 BTU · Fan Coil Indoor ×10
AOUA360ULBVG5 360,000 BTU · Condensing Unit ×1
09/20/2024Permit IssuedCENTRAL MECHANICAL SYSTEMOthers, Ventilation Systems
Ventilation
Us Draft TDF-620 8,500 CFM · Exhaust Fan ×1
1 project · most recent 09/20/2024
Storm
FiledStatusContractorScope
09/20/2024Permit IssuedOLYMPIC PLBG & HTG SVC INStorm
17 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
09/04/2026CompleteCHARAN ELEC'L ENTERP'S IN—
04/21/2026CompleteGEMINI ELECTRIC CO., INC.—
07/09/2025Permit IssuedEVEREST ELECTRIC CORPGeneral Wiring
02/24/2025Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
12/01/2023CompleteANCO ELECTL CONTCTNG INC—
08/16/2023CompleteCHARAN ELEC'L ENTERP'S IN—
08/08/2023CompleteJAMCOB ELECTRIC LLCGeneral Wiring
06/14/2023CompleteGEMINI ELECTRIC CO., INC.—
01/19/2023CompleteCHARAN ELEC'L ENTERP'S IN—
05/04/2022Permit IssuedSTANCO SYSTEM ELEC'L CONT—
04/07/2022CompleteCHARAN ELEC'L ENTERP'S IN—
02/03/2022Permit IssuedRAIDEN ELECTRIC LLC—
09/23/2021CompleteCHARAN ELEC'L ENTERP'S IN—
03/01/2021CompleteLEVIS ELECTR'L CONTR. CORGeneral Wiring
1 project · most recent 09/20/2024
Masonry
FiledStatusContractorScope
09/20/2024Permit IssuedCENTRAL MECHANICAL SYSTEMMasonry
2 projects · most recent 12/24/2025
Scaffold
FiledStatusContractorScope
12/24/2025Permit IssuedCENTRAL MECHANICAL SYSTEMScaffold
10/05/2022Permit IssuedLITEHOUSE BUILDERS INCScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
01/05/2026Post-installed AnchorsNELSON LOPEZspecial
06/16/2025Energy Code Compliance InspectionsAsma Hashmiprogress
05/01/2025Energy Code Compliance Inspections—progress
04/30/2025Mechanical Systems—special
04/30/2025Fire-Resistant Penetrations and Joints—special
04/30/2025Post-installed Anchors—special
04/30/2025Maintenance informationAsma Hashmienergy_progress
04/30/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
04/30/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
04/30/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
04/30/2025HVAC-R and service water piping design and insulation—energy_progress
04/30/2025Maintenance information—energy_progress
04/30/2025Final—progress
04/30/2025Mechanical Systems—special
04/30/2025Fire-Resistant Penetrations and Joints—special
04/30/2025Post-installed Anchors—special
04/30/2025FinalAsma Hashmiprogress
04/30/2025HVAC-R and service water heating system controls—energy_progress
04/30/2025HVAC-R and service water heating equipment—energy_progress
09/25/2024Post-installed AnchorsNELSON LOPEZspecial
09/24/2024Energy Code Compliance InspectionsNELSON LOPEZprogress
09/24/2024Electrical motors and elevatorsNELSON LOPEZenergy_progress
09/20/2024HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
09/20/2024Maintenance informationNELSON LOPEZenergy_progress
09/19/2024Post-installed AnchorsNELSON LOPEZspecial
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
JHS 172EducationSub-basement, Basement, Floors 1–3, Roof
Project Q01110919 Alteration · Permit Entire · 09/20/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026Q00650387-I1Request digital key ↗
08/26/2026Q00650378-I1Request digital key ↗
08/25/2026Q00650386-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/06/2010410070131Open ↗
07/13/2010410070131Open ↗
03/31/2008410070131Open ↗
▸BISWORK PERMIT APPLICATION2
04/15/2008410070131Open ↗
04/15/2008410070131Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026Q00650387-I1Open ↗
08/26/2026Q00650378-I1Open ↗
08/25/2026Q00650386-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/06/2026Q01110919-S1Open ↗
08/26/2026Q01110919-S2Open ↗
08/25/2026Q01125356-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/08/2010410070131Open ↗
03/31/2008410070131Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/06/2010410070131Open ↗
03/31/2008410070131Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/06/2026Q01110919-S1Open ↗
09/06/2026Q01110919-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/31/2008410070131Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/31/2008410070131Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/21/2008410070131Open ↗
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/25/2026Q00650386-I1Open ↗
08/13/2026Q00650386-P1Open ↗
08/13/2026Q01125356-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/31/2008410070131Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/28/2021421102452Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/28/2021421102452Open ↗
▸Approvals, Objections & Sign-offs33
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/25/2026Q00650386-I1Open ↗
08/21/2026Q01110919-S2Open ↗
08/21/2026Q01110919-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/25/2026Q00650386-I1Open ↗
08/20/2026Q01218868-I1Open ↗
08/13/2026Q01218569-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/26/2026Q00650387-I1Open ↗
08/13/2026Q01110919-I1Open ↗
08/13/2026Q01110919-S1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/14/2008410070131Open ↗
03/31/2008410070131Open ↗
03/14/2008410070131Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/21/2026Q01110919-S2Open ↗
08/21/2026Q01110919-S1Open ↗
08/14/2026Q01110919-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/08/2010410070131Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/15/2008410070131Open ↗
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal9
08/25/2026Q00650386-I1Open ↗
08/13/2026Q01125356-P1Open ↗
08/13/2026Q00650386-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/26/2026Q00650387-I1Open ↗