ECB06/08/2026IN 2.5 STORY,DETACHED,FRAME BUILDING WITH CELLAR EXCESSIVE DEBRIS OBSERVED THROUGHOUT WITH COMBUSTIBLE DEBRIS OBSTRUCTING EXIT., REPAIR AND/REPLACE$3K due
Two stories - detached, small or mid-size · 2,800 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.