← Back
BuildNYC
Two stories - detached, small or mid-size
81-34 266TH STREET
QUEENS · BIN 4178707
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,480 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Chain link fence installation6p · 2 filings · 17 docs
Floor 1Chain link fence installation6p · 2 filings · 17 docs
CellarChain link fence installation6p · 2 filings · 17 docs
Site & exteriorChain link fence installation8p · 2 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2016$625K—Private party → Private party$252/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward C. Hicks RA408/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ace-NYC Zoning and Code Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.N.K. Romeo ConstructionGeneral Contractor303/21/2026
R.N.K. Romeo ConstructionScaffold107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Citiscape Consulting762106/03/2022
Building Lifecycle
All (13)Filed (4)Permit Issued (3)Signed Off (2)Inspection (4)
10/09/2024
Signed off — Alteration
Filing Herewithin Plans and Application For Installation of Temporary Construction Fence. No Change in Occupancy or Use Under This Application.
Q08031509-I1
10/09/2024
Signed off — Alteration
Revised Location of Both First and Second Floor Bathrooms Layouts. Added Drywell to outside stair Drainage
Q00768068-I1
02/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2023
Filed — Alteration
Revised Location of Both First and Second Floor Bathrooms Layouts. Added Drywell to outside stair Drainage
Q00768068-P1
07/05/2023
Permit issued — Plumbing
Q00768068-I1-PL
05/17/2023
Permit issued — General Construction
Q00746627-I1-GC
04/27/2023
Permit issued — Construction Fence
Q08031509-I1-FN
04/11/2023
Filed — Alteration
Filing Herewithin Plans and Application For Installation of Temporary Construction Fence. No Change in Occupancy or Use Under This Application.
Q08031509-I1
07/21/2022
Filed — Alteration
Revised Location of Both First and Second Floor Bathrooms Layouts. Added Drywell to outside stair Drainage
Q00768068-I1
06/03/2022
Filed — Alteration CO
Q00746627-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing07/05/2023
DOB NOWGeneral ConstructionPermit IssuedR.N.K. Romeo Construction05/17/2023
DOB NOWConstruction FenceSigned-offR.N.K. Romeo Construction04/27/2023
1 project · most recent 07/12/2023
General Wiring
FiledStatusContractorScope
07/12/2023CompleteAyyub ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00746627-I1Request digital key ↗
08/24/2026Q08031509-I1Request digital key ↗
08/24/2026Q00768068-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00746627-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00746627-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00746627-I1Open ↗
08/24/2026Q08031509-I1Open ↗
08/24/2026Q00768068-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/26/2026Q00746627-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00746627-I1Open ↗
08/24/2026Q00768068-I1Open ↗
08/13/2026Q00768068-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00746627-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q00746627-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/26/2026Q00746627-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00746627-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00746627-I1Open ↗