← Back
BuildNYC
Two stories - detached, small or mid-size
81-36 252ND STREET
QUEENS · Bellerose · BIN 4174779
💬 Discuss this project
1950Year Built
2.25Stories
A1Building Class
R2AZoning
1,938 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding mounted solar electric generation array installatio3p · 2 filings · 20 docs
Attic18p · 2 filings · 20 docs
Floor 223p · 2 filings · 20 docs
Floor 119p · 2 filings · 20 docs
Cellar19p · 2 filings · 20 docs
Site & exteriorTemporary wooden construction fence1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/17/2022$610K—Private party → Private party$315/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parikh Architectural708/06/2026
Momentum Solar202/23/2026
Enthink Engineers207/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PNP Consulting Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Safeway ContractingGeneral Contractor804/09/2026
Sai JI PlumbingPlumbing310/07/2026
New Safeway ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parikh Architectural1470808/06/2026
MXV Sia9281202/23/2026
Building Lifecycle
All (80)Filed (11)Permit Issued (9)Signed Off (2)Inspection (6)Objection (22)Special Inspection (30)
10/06/2026
Permit issued — Plumbing
Q08035373-I1-PL
08/06/2026
Filed — Alteration
Provide two new gas furnaces, two compressors, three W.C., three Lav., three shower, one bathtub, one sink and drain. Relocate one W.C., One Lav, One stove, two sinks, one dishwasher. Remove one bathtub. No change in use, occupancy or egress.
Q08035373-P3
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
BINA PARIKH
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BINA PARIKH
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
BINA PARIKH
08/03/2026
Special inspection requirement — Maintenance information
BINA PARIKH
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BINA PARIKH
08/03/2026
Special inspection requirement — Permanent certificate
BINA PARIKH
04/02/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 7.79 KW
Q01314541-I1
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
03/31/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/31/2026
Special inspection requirement — Final
Mina Makar
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
03/27/2026
Objection resolved — Addressed
03/05/2026
Objection raised — Electrical
02/23/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 7.79 KW
Q01314541-P1
11/28/2025
Permit issued — Solar
Q01314541-I1-SL
11/06/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 7.79 KW
Q01314541-I1
04/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BINA PARIKH
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
BINA PARIKH
04/29/2025
Special inspection requirement — Lighting in dwelling units
BINA PARIKH
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
BINA PARIKH
04/29/2025
Special inspection requirement — Final
BINA PARIKH
04/29/2025
Special inspection requirement — Fenestration areas
BINA PARIKH
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
BINA PARIKH
04/29/2025
Special inspection requirement — Subgrade Inspections
BINA PARIKH
04/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BINA PARIKH
04/29/2025
Special inspection requirement — Mechanical Systems
BINA PARIKH
04/29/2025
Special inspection requirement — Concrete - Cast-In-Place
BINA PARIKH
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BINA PARIKH
04/29/2025
Special inspection requirement — Masonry
BINA PARIKH
04/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
BINA PARIKH
04/29/2025
Special inspection requirement — Footing and Foundation
BINA PARIKH
04/29/2025
Special inspection requirement — Preliminary
BINA PARIKH
04/29/2025
Special inspection requirement — Insulation placement and R values
BINA PARIKH
04/29/2025
Special inspection requirement — Permanent certificate
BINA PARIKH
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BINA PARIKH
04/04/2025
Filed — Alteration CO
Provide horizontal and vertical extension to single family dwelling. Internal alteration work. New CO requested
Q08035370-P3
02/07/2025
Filed — Alteration
Provide two new gas furnaces, two compressors, three W.C., three Lav., three shower, one bathtub, one sink and drain. Relocate one W.C., One Lav, One stove, two sinks, one dishwasher. Remove one bathtub. No change in use, occupancy or egress.
Q08035373-P2
02/04/2025
Signed off — Alteration
PROVIDE TEMP. CONSTRUCTION FENCE FOR ALTCO APPLICATION Q08035370. NO CHANG EIN USE, OCCUPANCY OR EGRESS.
Q08035375-I1
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Other
12/06/2024
Filed — Alteration CO
Provide horizontal and vertical extension to single family dwelling. Internal alteration work. New CO requested
Q08035370-P2
10/18/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2024
Permit issued — Foundation
Q08035370-I1-FO
09/23/2024
Permit issued — Mechanical Systems
Q08035370-I1-MS
09/13/2024
Permit issued — Plumbing
Q08035373-I1-PL
06/11/2024
Filed — Alteration
Provide two new gas furnaces, two compressors, three W.C., three Lav., three shower, one bathtub, one sink and drain. Relocate one W.C., One Lav, One stove, two sinks, one dishwasher. Remove one bathtub. No change in use, occupancy or egress.
Q08035373-P1
03/16/2024
Permit issued — Mechanical Systems
Q08035370-I1-GC
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Zoning
07/26/2023
Objection raised — Zoning
07/26/2023
Objection raised — Scope
07/26/2023
Objection raised — Other
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSai JI Plumbing10/06/2026
DOB NOWSolarSigned-offMomentum Solar11/28/2025
DOB NOWFoundationSigned-offNew Safeway Contracting09/24/2024
DOB NOWMechanical SystemsSigned-offNew Safeway Contracting09/23/2024
DOB NOWPlumbingPermit IssuedSai JI Plumbing09/13/2024
DOB NOWMechanical SystemsSigned-offNew Safeway Contracting03/16/2024
DOB NOWPlumbingPermit IssuedSai JI Plumbing03/17/2023
DOB NOWMechanical SystemsPermit IssuedNew Safeway Contracting02/22/2023
DOB NOWConstruction FenceSigned-offNew Safeway Contracting02/22/2023
1 project · most recent 04/04/2025
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
04/04/2025Signed-offNew Safeway ContractingHeating and Air Conditioning Systems, Others
Heat / Cool
York YCD48B21SA 3 tons · Condensing Unit ×8
DE60A36-210L-416 120,000 BTU · Furnace ×4
Williamson THERMOFLOW 120,000 BTU · Furnace ×2
Other
Delta Breez Radiance 80FL-HEATER RAD80L 90 CFM · Exhaust Fan ×20
York ASPEN DE60A36-21OL-416 65,000 BTU · Furnace ×4
Williamson THERMOFLOW 65,000 BTU · Furnace ×2
1 project · most recent 08/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/06/2026Permit IssuedSai JI PlumbingGas, Water/Sanitary
2 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025CompleteIsland Electric—
05/09/2024CompleteJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 04/04/2025
FiledStatusContractorScope
04/04/2025Signed-offNew Safeway Contracting3 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
08/03/2026Maintenance informationBINA PARIKHenergy_progress
08/03/2026HVAC-R and service water heating equipmentBINA PARIKHenergy_progress
08/03/2026Permanent certificateBINA PARIKHenergy_progress
08/03/2026HVAC-R and service water heating system controlsBINA PARIKHenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsBINA PARIKHspecial
08/03/2026HVAC-R and service water piping design and insulationBINA PARIKHenergy_progress
03/31/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
03/31/2026FinalMina Makarprogress
03/31/2026Energy Code Compliance InspectionsMina Makarprogress
03/31/2026Air barrier - visual inspectionMina Makarenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsMina Makarspecial
04/29/2025FinalBINA PARIKHprogress
04/29/2025PreliminaryBINA PARIKHprogress
04/29/2025Structural Stability – Alterations of existing buildingsBINA PARIKHspecial
04/29/2025Subgrade InspectionsBINA PARIKHspecial
04/29/2025MasonryBINA PARIKHspecial
04/29/2025Concrete - Cast-In-PlaceBINA PARIKHspecial
04/29/2025Mechanical SystemsBINA PARIKHspecial
04/29/2025Fire-Resistant Penetrations and JointsBINA PARIKHspecial
04/29/2025Fenestration air leakageBINA PARIKHenergy_progress
04/29/2025Insulation placement and R valuesBINA PARIKHenergy_progress
04/29/2025HVAC-R and service water piping design and insulationBINA PARIKHenergy_progress
04/29/2025HVAC-R and service water heating system controlsBINA PARIKHenergy_progress
04/29/2025HVAC-R and service water heating equipmentBINA PARIKHenergy_progress
04/29/2025Lighting in dwelling unitsBINA PARIKHenergy_progress
Latest 25 of 109.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026Q08035373-P3Request digital key ↗
08/21/2026Q08035373-P2Request digital key ↗
08/21/2026Q08035373-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q08035370-I1Open ↗
08/13/2026Q08035370-P3Open ↗
08/13/2026Q08035370-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q08035370-P3Open ↗
08/13/2026Q08035370-I1Open ↗
08/13/2026Q08035370-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08035370-I1Open ↗
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature46
09/01/2026Q08035370-P3Open ↗
09/01/2026Q08035370-P3Open ↗
09/01/2026Q08035370-P3Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026Q08035370-P3Open ↗
09/01/2026Q08035370-P3Open ↗
09/01/2026Q08035370-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026Q08035373-P3Open ↗
08/21/2026Q08035373-P2Open ↗
08/21/2026Q08035373-P1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/20/2026Q08035370-I1Open ↗
08/20/2026Q08035370-P3Open ↗
08/15/2026Q08035370-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08035370-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08035370-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q08035370-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/21/2026Q08035373-P3Open ↗
08/21/2026Q08035373-P2Open ↗
08/21/2026Q08035373-P1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01314541-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form3
08/13/2026Q08035370-P2Open ↗
08/13/2026Q08035370-I1Open ↗
08/13/2026Q08035370-P3Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/13/2026Q08035370-I1Open ↗
08/13/2026Q08035370-P1Open ↗
08/13/2026Q08035370-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q08035370-P1Open ↗
08/13/2026Q08035370-P2Open ↗
08/13/2026Q08035370-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q08035370-I1Open ↗
08/13/2026Q08035370-P2Open ↗
08/13/2026Q08035370-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026Q08035370-P3Open ↗
08/20/2026Q08035370-I1Open ↗
08/15/2026Q08035370-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q08035370-I1Open ↗