81-47 260 STREET
QUEENS · BIN 4178573
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,609 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction7p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TIDERUNNER ENGINEERING & DESIGN, PC308/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST END CONSTRUCTION & RGeneral Contractor303/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
METROCITY GROUP,INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570308/27/2024
Building Lifecycle
All (43)Filed (3)Permit Issued (3)Signed Off (1)Inspection (8)Objection (6)Special Inspection (22)
09/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2025
Permit issued — Plumbing
Q00764631-I1-PL
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Louis Schwartz
07/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Louis Schwartz
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Louis Schwartz
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Louis Schwartz
07/09/2025
Special inspection requirement — Maintenance information
Louis Schwartz
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
08/27/2024
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
Q00764631-P1
07/21/2024
Special inspection requirement — Maintenance information
Louis Schwartz
07/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
07/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Louis Schwartz
07/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Louis Schwartz
07/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Louis Schwartz
07/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Louis Schwartz
05/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2024
Signed off — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG, WITH MINOR INTER. & EXTER. WORK. REPLACEMENT INTER. FINISHES. REPLACEMENT OF PORTION OF STRUCTURAL FRAMING & WINDOWS AS DAMAGED. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
Q00764629-I1
12/26/2023
Permit issued — Plumbing
Q00764631-I1-PL
10/19/2022
Permit issued — General Construction
Q00764629-I1-GC-CX
07/14/2022
Objection raised — Inspections
07/14/2022
Objection resolved — Addressed
07/14/2022
Objection raised — Scope
07/14/2022
Objection resolved — Addressed
07/14/2022
Objection raised — Energy
07/14/2022
Objection resolved — Addressed
07/11/2022
Filed — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG, WITH MINOR INTER. & EXTER. WORK. REPLACEMENT INTER. FINISHES. REPLACEMENT OF PORTION OF STRUCTURAL FRAMING & WINDOWS AS DAMAGED. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
Q00764629-I1
07/11/2022
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG RESIDENTIAL BLDG. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
Q00764631-I1
07/09/2022
Special inspection requirement — Interior lighting power
Louis Schwartz
07/09/2022
Special inspection requirement — Insulation placement and R values
Louis Schwartz
07/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
07/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Louis Schwartz
07/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
Louis Schwartz
07/09/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Louis Schwartz
07/09/2022
Special inspection requirement — Fenestration air leakage
Louis Schwartz
07/09/2022
Special inspection requirement — Fenestration areas
Louis Schwartz
06/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD LAURIA
06/27/2022
Special inspection requirement — Final
Louis Schwartz
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC11/06/2025
DOB NOWPlumbingPermit IssuedMETROCITY GROUP,INC12/26/2023
DOB NOWGeneral ConstructionSigned-offEAST END CONSTRUCTION & R10/19/2022
BISPLISSUEDWILLSTON PLUMBING & HEATING CORP07/10/2001
1 project · most recent 08/27/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/27/2024Permit IssuedARCO PLBG AND HTG INCGas, Water/Sanitary
2 projects · most recent 04/22/2024
General Wiring
FiledStatusContractorScope
04/22/2024CompleteTRIANGLE ELECTRIC INC.General Wiring
08/16/2021Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/09/2025Energy Code Compliance InspectionsLouis Schwartzprogress
07/09/2025HVAC-R and service water piping design and insulationLouis Schwartzenergy_progress
07/09/2025HVAC-R and service water heating system controlsLouis Schwartzenergy_progress
07/09/2025HVAC-R and service water heating equipmentLouis Schwartzenergy_progress
07/09/2025Maintenance informationLouis Schwartzenergy_progress
07/09/2025Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
07/21/2024Maintenance informationLouis Schwartzenergy_progress
07/21/2024Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
07/21/2024Energy Code Compliance InspectionsLouis Schwartzprogress
07/21/2024HVAC-R and service water heating equipmentLouis Schwartzenergy_progress
07/21/2024HVAC-R and service water heating system controlsLouis Schwartzenergy_progress
07/21/2024HVAC-R and service water piping design and insulationLouis Schwartzenergy_progress
07/09/2022Interior lighting powerLouis Schwartzenergy_progress
07/09/2022Insulation placement and R valuesLouis Schwartzenergy_progress
07/09/2022Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
07/09/2022Energy Code Compliance InspectionsLouis Schwartzprogress
07/09/2022Fire-Resistance Rated ConstructionLouis Schwartzprogress
07/09/2022Fenestration and door U-factor and product ratingsLouis Schwartzenergy_progress
07/09/2022Fenestration air leakageLouis Schwartzenergy_progress
07/09/2022Fenestration areasLouis Schwartzenergy_progress
06/29/2022Structural Stability – Alterations of existing buildingsEDWARD LAURIAspecial
06/27/2022FinalLouis Schwartzprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q00764631-P1Request digital key ↗
08/21/2026Q00764631-I1Request digital key ↗
08/15/2026Q00764629-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/05/2026Q00764631-P1Open ↗
09/05/2026Q00764631-P1Open ↗
09/01/2026Q00764631-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q00764631-I1Open ↗
08/21/2026Q00764631-P1Open ↗
08/13/2026Q00764629-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/05/2026Q00764631-P1Open ↗
09/01/2026Q00764631-I1Open ↗
08/31/2026Q00764629-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q00764631-P1Open ↗
08/21/2026Q00764631-I1Open ↗
08/13/2026Q00764629-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00764629-I1Open ↗