← Back
BuildNYC
Four families
81 BAY 19 STREET
BROOKLYN · Bensonhurst · BIN 3166650
💬 Discuss this project
1947Year Built
3Stories
C3Building Class
R5Zoning
3,780 sfGross Floor Area
4Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Four families · 3,867 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3General construction and demolition work8p · 2 filings · 16 docs
Floor 2General construction and demolition work8p · 2 filings · 16 docs
Floor 1General construction and demolition work9p · 2 filings · 16 docs
BasementGeneral construction and demolition work4p · 2 filings · 16 docs
Sub-BasementGeneral construction and demolition work7p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2024$2.0M—Private party → Private party$526/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri612/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor303/21/2026
Kle ConstructionGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394312/23/2024
Building Lifecycle
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
01/27/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01068480-I1
01/23/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01068478-I1
12/24/2024
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01068480-P2
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKale Construction11/26/2024
DOB NOWPlumbingSigned-offCatman Plumbing07/01/2024
DOB NOWGeneral ConstructionSigned-offKle Construction07/01/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/23/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/23/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/23/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/01/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/01/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/01/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account