← Back
Two family frame
81 BAY RIDGE AVENUE
BROOKLYN · Bay Ridge · BIN 3145033
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R3-2Zoning
2,504 sfGross Floor Area
2Units
Two family frame · 3,625 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.301/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APPROVED OIL CO BROOKLYNGeneral Contractor203/21/2026
BELL FUEL OIL, LLCPlumbing107/08/2026
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (9)
08/21/2023
Signed off — Alteration
REPLACE BOILER. INSTALL WATER HEATER. REGISTER GAS DRYER. INSTALL NEW GAS SERVICE, METER AND PIPING.
B08019965-I1
08/21/2023
Signed off — Alteration
REPLACE BOILER. INSTALL WATER HEATER. REGISTER GAS DRYER. INSTALL NEW GAS SERVICE, METER AND PIPING.
B08019965-S1
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/17/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
01/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/16/2023
Filed — Alteration
REPLACE BOILER. INSTALL WATER HEATER. REGISTER GAS DRYER. INSTALL NEW GAS SERVICE, METER AND PIPING.
B08019965-P1
01/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/16/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/16/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
01/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2022
Permit issued — General Construction
B08019965-S1-GC
11/16/2022
Filed — Alteration
REPLACE BOILER. INSTALL WATER HEATER. REGISTER GAS DRYER. INSTALL NEW GAS SERVICE, METER AND PIPING.
B08019965-S1
11/01/2022
Permit issued — Plumbing
B08019965-I1-PL
10/28/2022
Special inspection requirement — Final
LOUIS ARENA
10/25/2022
Filed — Alteration
REPLACE BOILER. INSTALL WATER HEATER. REGISTER GAS DRYER. INSTALL NEW GAS SERVICE, METER AND PIPING.
B08019965-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAPPROVED OIL CO BROOKLYN12/16/2022
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC11/01/2022
BISOTISSUEDVOLTAIC SOLAIRE LLC12/10/2015
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/17/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
01/17/2023Maintenance informationLOUIS ARENAenergy_progress
01/17/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/17/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/16/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/16/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
01/16/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/16/2023Maintenance informationLOUIS ARENAenergy_progress
10/28/2022FinalLOUIS ARENAprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B08019965-P1Request digital key ↗
08/28/2026B08019965-I1Request digital key ↗
08/28/2026B08019965-S1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/01/2015340325419Open ↗
▸BISWORK PERMIT APPLICATION1
12/10/2015340325419Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B08019965-S1Open ↗
08/28/2026B08019965-I1Open ↗
08/28/2026B08019965-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B08019965-S1Open ↗
08/28/2026B08019965-I1Open ↗
08/28/2026B08019965-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/01/2015340325419Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B08019965-I1Open ↗
08/28/2026B08019965-P1Open ↗
08/28/2026B08019965-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/01/2015340325419Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/07/2016340325419Open ↗
12/01/2015340325419Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/01/2015340325419Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
11/07/2016340325419Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/07/2016340325419Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/07/2016340325419Open ↗
12/01/2015340325419Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/07/2016340325419Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
11/07/2016340325419Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/07/2016340325419Open ↗
12/01/2015340325419Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
04/13/2016340325419Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/01/2015340325419Open ↗