← Back
Walk-up apt, over six families with stores
Highbridge Rising
81 FEATHERBED LANE · BIN 2008809
💬 Discuss this project
1924Year Built
5Stories
C7Building Class
R7-1Zoning
33,000 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized47 Open Violations ▸
Walk-up apt, over six families with stores · 7,500 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction84p · 1 filing · 20 docs
Floor 6Under Construction70p · 1 filing · 20 docs
Floor 5Under Construction71p · 1 filing · 20 docs
Floor 4Under Construction63p · 1 filing · 20 docs
Floor 3Under Construction63p · 1 filing · 20 docs
Floor 2Under Construction73p · 1 filing · 20 docs
Floor 1Under Construction75p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE COMMUNITY DEV. CORP3508/29/2026
RENEWAL ARTS CONTRACTING403/22/2026
HIGHBRIDGE COMMUNITY DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC106/18/2026
PAUL A. CASTRUCCI, ARCHITECT303/02/2026
GACE DPC412/18/2025
FLORINELA MURESAN612/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor407/02/2026
AKM CONSTRUCTION NY CORPGeneral Contractor106/27/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
DUAL FUEL PLUBING & HTINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53441303/02/2026
Building Lifecycle
All (112)Filed (14)Permit Issued (7)Violation (60)Inspection (1)Special Inspection (30)
08/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/23/2026
Permit issued — Sidewalk Shed
X01359977-I1-SH
06/18/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR FACADE REPAIRS FILED UNDER APPL# X01208262-S5. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01359977-I1
06/02/2026
Permit issued — Plumbing
X01208262-S2-PL
05/15/2026
Permit issued — Boiler Equipment
X01208262-S4-BE
04/03/2026
Violation issued (HPD, closed)
B
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, open)
C
04/03/2026
Violation issued (HPD, closed)
C
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
03/03/2026
Special inspection requirement — Final
MINA HANNA
03/03/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
03/03/2026
Special inspection requirement — Interior lighting power
MINA HANNA
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
03/03/2026
Special inspection requirement — Fenestration areas
MINA HANNA
03/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
03/03/2026
Special inspection requirement — Lighting controls
MINA HANNA
03/03/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
03/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
03/03/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
03/03/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
03/02/2026
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P8
02/25/2026
Special inspection requirement — Lighting controls
02/25/2026
Special inspection requirement — Lighting in dwelling units
02/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/25/2026
Special inspection requirement — Interior lighting power
02/25/2026
Special inspection requirement — Exterior lighting power
12/29/2025
Permit issued — Mechanical Systems
X01208262-S3-MS
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/29/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/29/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/29/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/29/2025
Special inspection requirement — Final
MINA HANNA
12/23/2025
Permit issued — General Construction
X01208262-I1-GC
12/23/2025
Permit issued — Structural
X01208262-S1-ST
12/23/2025
Permit issued — General Construction
X01208262-S5-GC
12/19/2025
Special inspection requirement — Structural Steel - Welding
MINA HANNA
12/19/2025
Special inspection requirement — Final
MINA HANNA
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
12/19/2025
Special inspection requirement — Structural Steel - Details
MINA HANNA
12/18/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P3
12/18/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P7
12/17/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P5
12/17/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P4
12/17/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P6
12/16/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-P2
09/18/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-S4
07/25/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-S1
07/25/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-S5
07/11/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-S2
07/11/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-S3
06/25/2025
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS.
X01208262-I1
07/15/2024
Violation issued (HPD, open)
C
07/15/2024
Violation issued (HPD, open)
B
07/15/2024
Violation issued (HPD, open)
A
07/15/2024
Violation issued (HPD, open)
C
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP06/23/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.06/02/2026
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING05/15/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC12/29/2025
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWStructuralPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
1 project · most recent 03/02/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/02/2026Permit IssuedNOTIAS CONSTRUCTION INCHeating Systems, Ventilation Systems
Heating
Ventilation
Enervex RSV315 1,260 CFM · Exhaust Fan ×2
1 project · most recent 03/02/2026
FiledStatusContractorScope
03/02/2026——7 heads
1 project · most recent 03/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/02/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
2 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
06/02/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
1 project · most recent 03/02/2026
Steel
FiledStatusContractorScope
03/02/2026Permit IssuedAMERICAN STANDARD P&H CORSteel
1 project · most recent 06/18/2026
Sidewalk Shed
FiledStatusContractorScope
06/18/2026Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
1 project · most recent 03/02/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/02/2026Permit IssuedAMERICAN STANDARD P&H CORTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
03/03/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
03/03/2026Exterior lighting powerMINA HANNAenergy_progress
03/03/2026Fenestration areasMINA HANNAenergy_progress
03/03/2026Interior lighting powerMINA HANNAenergy_progress
03/03/2026Lighting in dwelling unitsMINA HANNAenergy_progress
03/03/2026Lighting controlsMINA HANNAenergy_progress
03/03/2026Fenestration air leakageMINA HANNAenergy_progress
03/03/2026Air barrier - visual inspectionMINA HANNAenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
03/03/2026Tenant Protection Plan ComplianceMINA HANNAspecial
03/03/2026Energy Code Compliance InspectionsMINA HANNAprogress
03/03/2026FinalMINA HANNAprogress
03/03/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
02/25/2026Exterior lighting power—energy_progress
02/25/2026Lighting controls—energy_progress
02/25/2026Lighting in dwelling units—energy_progress
02/25/2026Interior lighting power—energy_progress
02/25/2026Tenant Protection Plan Compliance—special
12/29/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/29/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/29/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/29/2025Fenestration air leakageMINA HANNAenergy_progress
12/29/2025Fenestration areasMINA HANNAenergy_progress
12/29/2025Air barrier - visual inspectionMINA HANNAenergy_progress
12/29/2025FinalMINA HANNAprogress
Latest 25 of 91.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/17/2026X01208262-I1Request digital key ↗
08/17/2026X01208262-P9Request digital key ↗
08/17/2026X01208262-P8Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature19
09/30/2026X01208262-P9Open ↗
09/23/2026X01208262-S3Open ↗
09/23/2026X01208262-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/30/2026X01208262-P9Open ↗
09/23/2026X01208262-S3Open ↗
09/23/2026X01208262-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/17/2026X01208262-S3Open ↗
08/17/2026X01208262-P4Open ↗
08/17/2026X01208262-S1Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/17/2026X01208262-S5Open ↗
08/17/2026X01208262-S2Open ↗
08/17/2026X01208262-S1Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/17/2026X01208262-I1Open ↗
08/17/2026X01208262-P4Open ↗
08/17/2026X01208262-P2Open ↗
Showing 3 of 14 on file for this type
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026X01208262-P2Open ↗
08/17/2026X01208262-I1Open ↗
08/13/2026X01208262-P8Open ↗