← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
81 METROPOLITAN OVAL · Parkchester · BIN 2096605
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized656 Active Violations 649 unresolved · 7 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade restoration and railing installation7p · 1 filing · 6 docs
BulkheadFacade restoration and railing installation1p · 1 filing · 6 docs
Floor 11Unit 11A, Unit 11B, Unit 11C +312p · 1 filing · 10 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorFacade restoration and railing installation13p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester Preservation Company1303/21/2026
PSC307/08/2026
Olshan Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf103/02/2024
Rimkus New York112/22/2023
Connolly Engineering102/16/2021
Green Design106/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants303/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LemxScaffold707/08/2026
Vinco BuildersGeneral Contractor303/21/2026
Elpo Electrical ContgElectrical103/21/2026
Pna ContractingGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481102/07/2024
Outsource Special Inspection2827112/22/2023
Rimkus New York8123112/22/2023
Connolly Engineering, PLL3427102/16/2021
Building Lifecycle
All (99)Filed (5)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (60)Special Inspection (12)
07/05/2026
Violation issued (HPD, closed)
C
11/07/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/05/2025
Signed off — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION AND RAILING INSTALLATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00959308-I1
06/16/2025
Violation issued (HPD, closed)
B
11/15/2024
Signed off — Alteration
X01010004-I1
07/19/2024
Violation issued (HPD, closed)
A
07/19/2024
Violation issued (HPD, closed)
A
07/19/2024
Violation issued (HPD, closed)
C
07/19/2024
Violation issued (HPD, open)
B
07/19/2024
Violation issued (HPD, open)
B
07/19/2024
Violation issued (HPD, open)
B
07/19/2024
Violation issued (HPD, open)
B
05/21/2024
Violation issued (HPD, open)
C
05/21/2024
Violation issued (HPD, open)
C
03/20/2024
Permit issued — General Construction
X00959308-I1-GC
03/04/2024
Permit issued — Sidewalk Shed
X01010004-I1-SH
03/02/2024
Filed — Alteration
X01010004-I1
02/21/2024
Permit issued — Suspended Scaffold
X00991773-I1-SC
02/07/2024
Filed — Alteration
X00991773-I1
01/17/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
01/17/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
01/10/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB AS PER PLANS AT APTS 11A, 11B, 11C, 11D, 11E, 11F, 11G, 11H & HALLWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00463888-I1
12/22/2023
Filed — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION AND RAILING INSTALLATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00959308-I1
11/17/2023
Special inspection requirement — Masonry
JAMES MONAHAN
11/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
11/07/2023
Special inspection requirement — Final
JAMES MONAHAN
10/07/2023
Violation issued (ECB, closed)
Elevators
08/18/2023
Violation issued (ECB, closed)
Elevators
03/15/2023
Violation issued (ECB, closed)
Elevators
03/15/2023
Violation issued (ECB, closed)
Elevators
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — SWARMP
02/07/2023
Violation issued (ECB, closed)
Elevators
02/07/2023
Violation issued (ECB, closed)
Elevators
01/11/2023
Cycle 9 facade inspection completed
07/08/2022
Violation issued (HPD, closed)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, closed)
C
07/08/2022
Violation issued (HPD, closed)
A
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, closed)
A
07/08/2022
Violation issued (HPD, closed)
A
07/08/2022
Violation issued (HPD, open)
C
07/08/2022
Violation issued (HPD, open)
C
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
06/22/2022
Violation issued (HPD, open)
B
04/20/2022
Violation issued (HPD, open)
C
04/20/2022
Violation issued (HPD, open)
C
05/25/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
X00357022-I1
03/03/2021
Violation issued (HPD, closed)
B
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPna Contracting03/20/2024
DOB NOWSidewalk ShedSigned-offLemx03/04/2024
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting02/21/2024
DOB NOWStructuralSigned-offVinco Builders03/02/2021
DOB NOWSidewalk ShedSigned-offLemx12/18/2020
DOB NOWSidewalk ShedSigned-offLemx06/11/2020
BISOTISSUEDProto Restoration Construction07/09/2020
BISEQISSUEDCS Bridge06/09/2011
BISOTISSUEDDNA Contracting04/19/2011
BISOTISSUEDTechinical Construction Services08/02/2005
BISOTISSUEDPPC Construction08/08/2002
BISOTISSUEDPPC Construction04/04/2002
BISPLISSUEDBlueprint Plumbing04/04/2002
BISOTISSUEDValco Associates09/04/2001
BISOTISSUEDValco Associates07/31/2001
BIS—ISSUEDNational Maintenance10/12/2000
BISEQISSUEDAtlantic Heydt08/20/1998
4 projects · most recent 03/01/2024
FiledStatusContractorScope
03/01/2024Permit IssuedRichard Neu—
06/02/2022CompleteDola Electrical Co—
06/16/2020CompleteElpo Electrical Contg—
03/06/2020Permit IssuedRNW Electric1 meters
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/17/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
01/17/2024Post-installed AnchorsLeo Leespecial
11/17/2023MasonryJAMES MONAHANspecial
11/17/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
11/07/2023FinalJAMES MONAHANprogress
02/01/2021Post-installed Anchorsdaniel connollyspecial
02/01/2021Structural Steel - Weldingdaniel connollyspecial
02/01/2021Structural Steel - High Strength Boltingdaniel connollyspecial
02/01/2021Finaldaniel connollyprogress
02/01/2021Structural Steel - Detailsdaniel connollyspecial
02/01/2021Structural Stability – Alterations of existing buildingsdaniel connollyspecial
06/11/2020FinalBRIAN T. O'CONNORprogress
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/21/2026X00959308-I1Request digital key ↗
08/21/2026X00991773-I1Request digital key ↗
08/21/2026X01010004-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/25/2026X00463888-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00357022-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
02/28/2020220727364Open ↗
07/05/2011220123532Open ↗
04/20/2011220115293Open ↗
▸BISWORK PERMIT APPLICATION3
07/09/2020220727364Open ↗
06/10/2011220123532Open ↗
04/20/2011220115293Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature9
09/28/2026X00959308-I1Open ↗
09/28/2026X00959308-I1Open ↗
08/30/2026X00463888-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/28/2020220727364Open ↗
10/09/2012220115293Open ↗
10/09/2012220115293Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X00959308-I1Open ↗
08/13/2026X00463888-I1Open ↗
08/13/2026X01010004-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/28/2026X00959308-I1Open ↗
09/02/2026X00357022-I1Open ↗
08/30/2026X00463888-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/05/2011220123532Open ↗
04/20/2011220115293Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/05/2011220123532Open ↗
04/20/2011220115293Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026X00463888-I1Open ↗
08/13/2026X00357022-I1Open ↗
▸BISTenant Protection Plan and Notes1
02/28/2020220727364Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026X00959308-I1Open ↗
08/13/2026X00463888-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/05/2011220123532Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/09/2020220727364Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/20/2011220115293Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/08/2021220727364Open ↗
07/09/2020220727364Open ↗
07/09/2020220727364Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/28/2020220727364Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/08/2021220727364Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/08/2021220727364Open ↗
07/09/2020220727364Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/08/2021220727364Open ↗
10/09/2012220115293Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/28/2020220727364Open ↗
10/09/2012220115293Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/05/2011220123532Open ↗
04/20/2011220115293Open ↗
▸BISFINAL1
07/09/2020220727364Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
02/28/2020220727364Open ↗
10/09/2012220115293Open ↗
04/20/2011220115293Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/08/2021220727364Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/28/2020220727364Open ↗
07/05/2011220123532Open ↗
04/20/2011220115293Open ↗
▸BISADDITIONAL INFORMATION2
04/02/2020220727364Open ↗
02/28/2020220727364Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026X00991773-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X00991773-I1Open ↗