| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/11/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems | Cooling Florida Heat Pump CL048 46,600 BTU · Wshp ×2 |
| 06/05/2026 | Permit Issued | CONCEPT CONSTRUCTION SERV | Air Conditioning Systems | Cooling Florida Heat Pump 24 2 tons · Wshp ×1 |
| 12/09/2025 | Permit Issued | A.W. & S. CONSTRUCTION CO | Air Conditioning Systems | Cooling Florida Heat Pump 48 1,300 CFM · Wshp ×1 |
| 11/13/2025 | Permit Issued | CROSS MANAGEMENT CORP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster SR-042 38,400 BTU · Wshp ×2 Ventilation Greenheck CSP-A3300-VG 1,050 CFM · Exhaust Fan ×1 |
| 09/29/2025 | Permit Issued | CONCEPT CONSTRUCTION SERV | Air Conditioning Systems | Cooling Florida Heat Pump CL030 950 CFM · Wshp ×1 |
| 06/16/2025 | Permit Issued | CONCEPT CONSTRUCTION SERV | Air Conditioning Systems | Cooling Florida Heat Pump CL024 2 tons · Wshp ×1 Liebert ×1 |
| 02/25/2025 | Permit Issued | CONCEPT CONSTRUCTION SERV | Air Conditioning Systems | Cooling |
| 05/15/2024 | Permit Issued | DONNELLY MECHANICAL CORP | Air Conditioning Systems | Cooling Water Furnace NBH060ER404DBWAN0A32SSJ 65,000 BTU · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Permit Issued | FULL CAPACITY FIRE CORP | 146 heads, 1 outlets |
| 04/08/2026 | Permit Issued | ASHLAR MECHANICAL CORP | 178 heads, 1 outlets |
| 02/09/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 317 heads |
| 02/02/2026 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 12/09/2025 | Permit Issued | A + SPRINKLER CORP | 109 heads |
| 11/13/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 93 heads |
| 10/27/2025 | Signed-off | FIVE BOROUGH NYC LLC | 164 heads |
| 09/29/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 66 heads |
| 08/13/2025 | Signed-off | DENKO MECHANICAL INC | 27 heads |
| 06/17/2025 | Signed-off | FULL CAPACITY FIRE CORP | 126 heads |
| 06/16/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 133 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 06/05/2026 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 04/08/2026 | Signed-off | NY PLUMBING & HEATING COR | Water/Sanitary |
| 12/09/2025 | — | — | — |
| 12/09/2025 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 12/08/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 11/13/2025 | — | — | — |
| 11/13/2025 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 10/27/2025 | — | — | — |
| 10/23/2025 | Signed-off | ARMON MECHANICAL INC | Water/Sanitary |
| 09/29/2025 | — | — | — |
| 08/13/2025 | — | — | — |
| 08/13/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 06/17/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 03/11/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 11/18/2025 | Permit Issued | C. W. GREENE INC | General Wiring |
| 10/08/2025 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 07/16/2025 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 07/14/2025 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 04/29/2025 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 04/21/2025 | Complete | ALL WAYS ELECTRIC CORP.W | — |
| 03/03/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 02/12/2025 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 10/21/2024 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 10/15/2024 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 05/07/2024 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 10/23/2023 | Complete | EPIC ELECTRIC INC | General Wiring |
| 08/01/2023 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 12/30/2022 | Complete | GREEN WATER AND POWER NYC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | — | — | Steel |
| 11/07/2025 | Permit Issued | FERRAN CONTRACTING CORP | Steel, Concrete |
| 03/10/2025 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | Permit Issued | COLGATE RESTORATION CORP | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | Permit Issued | COLGATE RESTORATION CORP | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN REALITY CORP | 1,703 | 09/19/2026 |
| TRI BOROUGH SCAFFOLDING | 3 | 07/08/2026 |
| SLG 810 SEVENTH LESSEE | 16 | 03/22/2026 |
| 3LG810SEVENTH LESSEE LLC | 1 | 03/22/2026 |
| 230 OPERATING INC | 2 | 03/22/2026 |
| 569 OPERATING | 3 | 03/22/2026 |
| RECKSON ASSOCIATES | 29 | 03/22/2026 |
| RECKON ASSOC. | 3 | 03/22/2026 |
| RECKSON ASSOCIATION | 1 | 03/22/2026 |
| OWNER OF 810 7 AVE | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 17 | 09/11/2026 |
| CANY ARCHITECTURE & ENGINEERING DPC | 3 | 09/01/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 3 | 08/25/2026 |
| SYSKA HENNESSY GROUP | 124 | 08/12/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 38 | 07/20/2026 |
| AMA CONSULTING ENGINEERS, PC | 7 | 02/09/2026 |
| GENSLER | 3 | 02/03/2026 |
| AKF ENGINEERS, LLP | 3 | 11/13/2025 |
| STEPHEN K. CHIN, ARCHITECT | 2 | 11/13/2025 |
| THORNTON TOMASETTI | 2 | 11/07/2025 |
| STERLING ENGINEERING SERVICES,P.C. | 2 | 07/24/2025 |
| WELLWORTH CONSULTING LLC | 1 | 05/15/2025 |
| SEVERUD ASSOCIATES | 2 | 03/10/2025 |
| NEWTEC ENGINEERING | 1 | 05/15/2024 |
| ME ENGINEERS | 3 | 06/08/2023 |
| CFS ENGINEERING, DPC | 3 | 10/06/2022 |
| TPG ARCHITECTURE, LLP | 1 | 10/06/2022 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 12/15/2021 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 07/07/2021 |
| PLAN ARCHITECTURE PLLC | 1 | 04/30/2021 |
| DOOLING & COMPANY ARCHITECTS | 1 | 11/04/2019 |
| SCHERER DESIGN GROUP | 1 | 03/20/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 183 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 1 | 03/21/2026 |
| DESARNO ASSOCIATES | 32 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 2 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| FINALY GENL CONTR CORP | General Contractor | 49 | 07/08/2026 |
| CONCEPT CONSTRUCTION SERV | General Contractor | 19 | 07/08/2026 |
| SYNERGY CONSTRUCTION INC | General Contractor | 17 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 15 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 14 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 11 | 07/08/2026 |
| VERSATILE SERVICES LLC | General Contractor | 8 | 07/08/2026 |
| ACC CONSTRUCTION CORP | General Contractor | 7 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 6 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 6 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 5 | 04/09/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 5 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 5 | 07/08/2026 |
| FERRAN CONTRACTING CORP | General Contractor | 4 | 04/09/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 4 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 4 | 07/08/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 4 | 03/21/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 4 | 07/08/2026 |
| POWER-TECH INSTALL. ELEC' | Electrical | 4 | 03/22/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 4 | 09/19/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 4 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 3 | 09/18/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 26 | 09/11/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 107 | 09/01/2026 |
| URBAN INTEGRATIONS LLC | 7993 | 1 | 07/15/2026 |
| STERLING ENGINEERING SERV | 1012 | 2 | 07/24/2025 |
| AK ENGINEERING PC | 678 | 1 | 05/15/2024 |
| MEP INSPECTIONS, INC | 1102 | 3 | 01/15/2020 |
| SCHERER DESIGN GROUP, LLC | 6303 | 1 | 03/20/2018 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 09/18/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 08/25/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | COLGATE RESTORATION CORP | 08/20/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | COLGATE RESTORATION CORP | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/24/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 06/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 06/29/2026 |
| DOB NOW | General Construction | Permit Issued | CONCEPT CONSTRUCTION SERV | 06/29/2026 |
| DOB NOW | Standpipe | Permit Issued | FULL CAPACITY FIRE CORP | 06/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CONCEPT CONSTRUCTION SERV | 06/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAR MECHANICAL CORP | 05/18/2026 |
| DOB NOW | Standpipe | Signed-off | ASHLAR MECHANICAL CORP | 05/15/2026 |
| DOB NOW | Plumbing | Signed-off | NY PLUMBING & HEATING COR | 05/07/2026 |
| DOB NOW | Mechanical Systems | Signed-off | VERSATILE SERVICES LLC | 04/22/2026 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 04/22/2026 |
| DOB NOW | General Construction | Signed-off | VERSATILE SERVICES LLC | 04/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 04/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | MORA FIRE PROTECTION LLC | 02/05/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 02/04/2026 |
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 01/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SYNERGY CONSTRUCTION INC | 01/05/2026 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 01/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FINALY GENL CONTR | 01/05/2026 |
| DOB NOW | General Construction | Permit Issued | FINALY GENL CONTR | 01/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | A + SPRINKLER CORP | 12/23/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 12/12/2025 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 12/12/2025 |
| DOB NOW | Plumbing | Signed-off | MILLER PLBG & HTG INC | 11/26/2025 |
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 11/25/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CROSS MANAGEMENT CORP | 11/21/2025 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 11/18/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 11/18/2025 |
| DOB NOW | General Construction | Permit Issued | CROSS MANAGEMENT CORP | 11/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SYNERGY CONSTRUCTION INC | 10/20/2025 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 10/16/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 10/16/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 10/09/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/14/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/09/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/29/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/04/2026 | No Access-Final CND-Occupancy Inspection | No Access | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/29/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/22/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/21/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/09/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 09/09/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 09/09/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 09/09/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| 09/09/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 09/09/2026 | Duct leakage testing, insulation and design | James Sullivan Jr | energy_progress |
| 09/09/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 09/09/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 09/09/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 08/28/2026 | Mechanical Systems | James Sullivan Jr | special |
| 08/28/2026 | Final | James Sullivan Jr | progress |
| 07/14/2026 | Alternative Materials - OTCR Buildings Bulletin Number | DANNY TRUJILLO | special |
| 07/14/2026 | Structural Stability – Alterations of existing buildings | DANNY TRUJILLO | special |
| 07/14/2026 | Post-installed Anchors | DANNY TRUJILLO | special |
| 06/25/2026 | Final | Frank Loffredo | progress |
| 06/24/2026 | Final | Nathanael Morejon | progress |
| 06/24/2026 | Structural Stability – Alterations of existing buildings | Young Suh | special |
| 06/24/2026 | Structural Steel - Welding | Young Suh | special |
| 06/24/2026 | Structural Steel - Details | Young Suh | special |
| 06/24/2026 | Post-installed Anchors | Young Suh | special |
| 06/24/2026 | Masonry | Young Suh | special |
| 05/18/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 05/18/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 05/18/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 05/18/2026 | Standpipe Systems | James Sullivan Jr | special |