Public elementary, junior or senior high
P.S. 204 Vince Lombardi
8101 15 AVENUE · BIN 3163702
💬 Discuss this project
1931Year Built
4Stories
W1Building Class
R4Zoning
41,976 sfGross Floor Area
1Units
LL97 Covered9 Open Violations 0 unresolved · 9 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 85,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 4Under Construction13p · 1 filing · 20 docs
Floor 3Under Construction13p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1307/22/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
DEPARTMENT OF EDUCATION1303/22/2026
NYC DOE 0103/22/2026
DEPARTMENT OF EDUCATION 0503/22/2026
DOE PS 204703/22/2026
DEPT OF EDUCATION PS 204103/22/2026
D.O.E. P.S.204 0103/22/2026
DOE 040203/22/2026
DOE PS 204 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VELOCITY ARCHITECTURAL SERVICES PLL806/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABC CONSTRUCTION CONT INCGeneral Contractor207/08/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
SUNRISE ELEC'L SERVICESElectrical103/22/2026
FORSYTHE PLBG & HTG CORPPlumbing107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230406/09/2026
Building Lifecycle
All (96)Filed (8)Permit Issued (3)Violation (60)Objection (6)Special Inspection (19)
07/20/2026
Permit issued — Plumbing
B01293555-S2-PL
06/18/2026
Permit issued — Mechanical Systems
B01293555-S1-MS
06/17/2026
Permit issued — General Construction
B01293555-I1-GC
06/12/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
06/12/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
06/12/2026
Special inspection requirement — Final
STEPHEN LATUS
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
06/11/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
06/09/2026
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-P3
06/09/2026
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-P2
06/09/2026
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-P1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
06/02/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
06/02/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
06/02/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
06/02/2026
Special inspection requirement — Final
STEPHEN LATUS
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/09/2026
Violation issued (ECB, open)
Construction
03/09/2026
Violation issued (ECB, open)
Construction
03/09/2026
Violation issued (ECB, open)
Construction
01/13/2026
Violation issued (FDNY_ORDER, closed)
01/13/2026
Violation issued (FDNY_ORDER, closed)
12/17/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Other
12/12/2025
Special inspection requirement — Final
12/05/2025
Filed — Alteration
SELECTIVE REMOVALS; TOILET FIXTURES, PARTITIONS, ROOM ACCESSORIES, DOOR HARDWARE, FLOOR/WALL TILES, DRINKING FOUNTAIN. INSTALL: PARTITIONS, MIRRORS, WALL./FLOOR TILE, DOOR/HARDWARE, RADIATOR COVER , DRINKING/FILLER FOUNTAIN TO COMPLY WITH ADA REQUIREMENTS
B01319633-I1
12/05/2025
Filed — Alteration
SELECTIVE REMOVALS; TOILET FIXTURES, PARTITIONS, ROOM ACCESSORIES, DOOR HARDWARE, FLOOR/WALL TILES, DRINKING FOUNTAIN. INSTALL: PARTITIONS, MIRRORS, WALL./FLOOR TILE, DOOR/HARDWARE, RADIATOR COVER , DRINKING/FILLER FOUNTAIN TO COMPLY WITH ADA REQUIREMENTS
B01319633-S1
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/24/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Other
10/21/2025
Objection raised — Other
10/21/2025
Objection resolved — Addressed
10/14/2025
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-S2
10/10/2025
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-I1
10/10/2025
Filed — Alteration
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New ERV Units, piping/.hanger/insulation/temp controls/Roof Piping Penetration.
B01293555-S1
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
05/01/2025
Violation issued (ECB, open)
Construction
04/18/2024
Violation issued (FDNY_NOV, closed)
04/18/2024
Violation issued (FDNY_NOV, closed)
02/21/2024
Violation issued (ECB, open)
Construction
11/02/2023
Violation issued (FDNY_ORDER, closed)
11/02/2023
Violation issued (FDNY_NOV, closed)
09/13/2023
Violation issued (FDNY_NOV, closed)
02/08/2023
Violation issued (FDNY_NOV, closed)
01/26/2023
Violation issued (ECB, open)
Construction
01/26/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP07/20/2026
DOB NOWMechanical SystemsPermit IssuedABC CONSTRUCTION CONT INC06/18/2026
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC06/17/2026
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/02/2016
BISPLISSUEDVARSITY PLBG AND HTG INC11/03/2015
BISOTISSUEDLANMARK GROUP INC10/20/2015
BISEQISSUEDLANMARK GROUP INC10/20/2015
BISEQISSUEDLANMARK GROUP INC10/20/2015
BISOTISSUEDLANMARK GROUP INC10/20/2015
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/01/2015
BISEQISSUEDSUKHMANY CONSTRUCTION INC02/04/2015
BISEQISSUEDSUKHMANY CONSTRUCTION INC02/04/2015
BISOTISSUEDLANMARK GROUP INC11/05/2014
BISOTISSUEDLANMARK GROUP INC11/05/2014
BISEQISSUEDLANMARK GROUP INC11/05/2014
BISEQISSUEDLANMARK GROUP INC11/05/2014
BISPLISSUEDVARSITY PLBG AND HTG INC11/04/2014
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/02/2014
BISEQISSUEDSUKHMANY CONSTRUCTION INC01/24/2014
BISEQISSUEDSUKHMANY CONSTRUCTION INC01/24/2014
BISOTISSUEDLANMARK GROUP INC11/29/2013
BISEQISSUEDLANMARK GROUP INC11/29/2013
BISEQISSUEDLANMARK GROUP INC11/29/2013
BISOTISSUEDLANMARK GROUP INC11/29/2013
BISPLISSUEDVARSITY PLBG AND HTG INC11/20/2013
BISOTISSUEDLANMARK GROUP INC11/20/2013
BISMHISSUEDMIDTOWN HVAC ENTERPRISES11/20/2013
BISOTISSUEDLANMARK GROUP INC11/20/2013
BISEQISSUEDLANMARK GROUP INC11/18/2013
BISEQISSUEDSUKHMANY CONSTRUCTION INC10/15/2013
BISEQISSUEDSUKHMANY CONSTRUCTION INC10/15/2013
BISEQISSUEDLANMARK GROUP INC10/01/2013
BISEQISSUEDLANMARK GROUP INC09/27/2013
BISOTISSUEDPERFECT CITY GATES CORP02/08/2012
BISOTISSUEDKEY HOME CONSTRUCTION COR01/27/2012
BISOTISSUEDKEY HOME CONSTRUCTION COR03/15/2011
BISMHISSUEDCHAPMAN & EVANS CONTRACT03/15/2011
BISEQISSUEDNEHAL CONTRACTING INC05/28/2010
BISPLISSUEDMAR-SAL PLBG & HTG, INC10/06/2009
BISOTISSUEDKEY HOME CONSTRUCTION COR10/05/2009
+ 13 more permits on file
1 project · most recent 06/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Permit IssuedABC CONSTRUCTION CONT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRNU363M2AA 40,000 BTU · Vrf Outdoor ×2
ZRUM060GSSO 67,000 BTU · Vrf Outdoor ×2
ZRUN183MAAA 21,500 BTU · Vrf Outdoor ×2
Ventilation
Anemostat 30-45 580 CFM ×4
EPL 265 CFM ×2
Renewaire HE05 200 CFM · Erv ×2
HE07 410 CFM · Erv ×2
2 projects · most recent 06/09/2026
Water/Sanitary
FiledStatusContractorScope
06/09/2026Permit IssuedFORSYTHE PLBG & HTG CORPWater/Sanitary
12/05/2025——Water/Sanitary
9 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedAPEX ELECTRIC CORPGeneral Wiring
06/26/2026Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
06/23/2026Permit IssuedTELECOMMUNICATION ELEC COGeneral Wiring
08/25/2025Permit IssuedSUNRISE ELEC'L SERVICES—
12/26/2024CompleteEVEREST ELECTRIC CORP—
03/22/2019CompleteCHARAN ELEC'L ENTERP'S IN—
12/17/2018CompleteCHARAN ELEC'L ENTERP'S IN—
01/02/2018CompleteCHARAN ELEC'L ENTERP'S IN—
12/26/2017CompleteCHARAN ELEC'L ENTERP'S IN—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/12/2026Post-installed AnchorsSTEPHEN LATUSspecial
06/12/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
06/12/2026Mechanical SystemsSTEPHEN LATUSspecial
06/12/2026FinalSTEPHEN LATUSprogress
06/12/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
06/11/2026Post-installed AnchorsSTEPHEN LATUSspecial
06/11/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
06/11/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
06/02/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
06/02/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
06/02/2026Post-installed AnchorsSTEPHEN LATUSspecial
06/02/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
06/02/2026Mechanical SystemsSTEPHEN LATUSspecial
06/02/2026Post-installed AnchorsSTEPHEN LATUSspecial
06/02/2026FinalSTEPHEN LATUSprogress
06/02/2026Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
12/12/2025Final—progress
12/05/2025Fire-Resistant Penetrations and Joints—special
11/19/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026B01319633-I1Request digital key ↗
08/19/2026B01319633-S1Request digital key ↗
08/16/2026B01293555-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸BISWORK PERMIT APPLICATION1
11/17/2013340097380Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026B01293555-I1Open ↗
08/16/2026B01293555-P1Open ↗
08/16/2026B01293555-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01293555-I1Open ↗
08/31/2026B01293555-S1Open ↗
08/29/2026B01293555-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01293555-I1Open ↗
08/31/2026B01293555-S1Open ↗
08/29/2026B01293555-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026B01293555-P1Open ↗
08/16/2026B01293555-S1Open ↗
08/16/2026B01293555-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/13/2022340836126Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/13/2022340836126Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/16/2026B01293555-P1Open ↗
08/16/2026B01293555-P3Open ↗
08/16/2026B01293555-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/16/2026B01293555-P2Open ↗
08/16/2026B01293555-P1Open ↗
08/16/2026B01293555-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026B01293555-S1Open ↗
08/13/2026B01319633-I1Open ↗
08/13/2026B01319633-S1Open ↗
Showing 3 of 5 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
04/13/2022340836126Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/13/2022340836126Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
04/13/2022340836126Open ↗
11/17/2013340097380Open ↗
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/16/2026B01293555-P1Open ↗
08/16/2026B01293555-P3Open ↗
08/16/2026B01293555-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProof of Historic Building3
08/16/2026B01293555-P1Open ↗
08/13/2026B01293555-I1Open ↗
08/13/2026B01319633-I1Open ↗