Antenna · Mechanical Systems · Supported Scaffold
Installation of 6 in-row coolers, 2 inline pumps, and associated piping on the 4th floor. Installation of 1 adiabatic cooler and associated glycol and makeup water piping on the 5th floor.
On file for this project
15 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Facade Repairs for entire building. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Bulkhead2p · 1 filing · 11 docs
Architecture
Facade Repairs for entire building. No change to use, egress, or occupancy.
On file for this project
11 documents · 2 drawing sheets
Penthouse1 filing · 19 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Installation of steel supports for replacement generators on 3rd floor slab, and also in existing opening above, to support sound attenuators and generator exhaust ducts being installed under Job# M00574311.
On file for this project
19 documents
Floor 211p · 2 filings · 14 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Reconfiguration of HVAC ducts at main entrance points to telephone switch equipment rooms from elevator lobbies on 18th, 19th & 21st floors as shown on plans submitted herewith.
On file for this project
14 documents · 1 drawing sheet
Reconfiguration of fire barriers at main entrance points to telephone switch equipment rooms from elevator lobbies on 17th through 21st floors as shown on plans submitted herewith.
On file for this project
4 documents
Floor 201 filing
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Reconfiguration of fire barriers at main entrance points to telephone switch equipment rooms from elevator lobbies on 17th through 21st floors as shown on plans submitted herewith.
On file for this project
4 documents
Floor 192 filings · 14 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Reconfiguration of HVAC ducts at main entrance points to telephone switch equipment rooms from elevator lobbies on 18th, 19th & 21st floors as shown on plans submitted herewith.
On file for this project
14 documents
Reconfiguration of fire barriers at main entrance points to telephone switch equipment rooms from elevator lobbies on 17th through 21st floors as shown on plans submitted herewith.
On file for this project
4 documents
Floor 182 filings · 14 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Reconfiguration of HVAC ducts at main entrance points to telephone switch equipment rooms from elevator lobbies on 18th, 19th & 21st floors as shown on plans submitted herewith.
On file for this project
14 documents
Reconfiguration of fire barriers at main entrance points to telephone switch equipment rooms from elevator lobbies on 17th through 21st floors as shown on plans submitted herewith.
On file for this project
4 documents
Floor 171 filing
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Reconfiguration of fire barriers at main entrance points to telephone switch equipment rooms from elevator lobbies on 17th through 21st floors as shown on plans submitted herewith.
On file for this project
4 documents
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 111 filing
ElectricalFire ProtectionMechanical
Issued Permit Scope
Antenna · Mechanical Systems · Sprinklers
Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation of equipment cabinet in the existing equipment room in the 11th floor. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
On file for this project
6 documents
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 4 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Installation of six (6) in-row A/C units, one (1) outdoor adiabatic cooler, and associated piping. New BMS controls system.
On file for this project
7 documents · 1 drawing sheet
Installation of 6 in-row coolers, 2 inline pumps, and associated piping on the 4th floor. Installation of 1 adiabatic cooler and associated glycol and makeup water piping on the 5th floor.
On file for this project
15 documents
Cooler support dunnage for 15 LF
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction4p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of six (6) in-row A/C units, one (1) outdoor adiabatic cooler, and associated piping. New BMS controls system.
On file for this project
7 documents · 2 drawing sheets
Replacement of one (1) existing water-cooled chiller and valve replacement on the 2nd floor. Valve and basin heater replacement at cooling towers on the 4th floor setback.
On file for this project
7 documents
Installation of 6 in-row coolers, 2 inline pumps, and associated piping on the 4th floor. Installation of 1 adiabatic cooler and associated glycol and makeup water piping on the 5th floor.
On file for this project
15 documents
Latest 3 of 6 filings on this floor.
Floor 32p · 5 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of steel supports for replacement generators on 3rd floor slab, and also in existing opening above, to support sound attenuators and generator exhaust ducts being installed under Job# M00574311.
On file for this project
19 documents
Roof drain work on third floor roof and sprinkler modifications on 1st & 3rd floors.
On file for this project
11 documents · 2 drawing sheets
Slab openings for electrical conduits to install electrical tap boxes and includes hanging of cable trays. Separate applications for associated general construction, plumbing, sprinkler and mechanical work are filed.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 2Under Construction6p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Replacement of one (1) existing water-cooled chiller and valve replacement on the 2nd floor. Valve and basin heater replacement at cooling towers on the 4th floor setback.
On file for this project
7 documents · 1 drawing sheet
Work to include Concrete Mechanical Pad Extension
On file for this project
4 documents · 1 drawing sheet
Construction of new UPS Room, extend raised access floor, new doors, painting.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 18p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of (5) new CRAH units.
On file for this project
7 documents · 2 drawing sheets
Roof drain work on third floor roof and sprinkler modifications on 1st & 3rd floors.
On file for this project
11 documents · 1 drawing sheet
Modify existing sprinkler piping to accommodate ductwork modifications
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Cellar1p · 1 filing · 4 docs
Fire Protection
Issued Permit Scope
Sprinklers
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM FOR INSTALLATION OF NEW HEADS ON CELLAR LEVELS (CEL,SC). PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Sub-Cellar1p · 1 filing · 4 docs
Fire Protection
Issued Permit Scope
Sprinklers
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM FOR INSTALLATION OF NEW HEADS ON CELLAR LEVELS (CEL,SC). PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Basement1p · 1 filing · 12 docs
Mechanical
Installation of three additional Computer Room A/C units, CRAH-1-8, CRAH-1-9 & CRAH-1-10
On file for this project
12 documents · 1 drawing sheet
Site & exteriorUnder Construction11 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural · Supported Scaffold
INSTALL NON-ILLUMINATED ADVERTISING SIGN (SIGN A) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION NUMBER M01138269 (CHANGEABLE COPY)
On file for this project
3 documents · 7 drawing sheets
ERECT WALL STRUCTURE FOR ADVERTISING SIGNS FILED UNDER SEPARATE APPLICATION NUMBER M01138250 & M01138286. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 6 drawing sheets
INSTALL NON-ILLUMINATED ADVERTISING SIGN (SIGN B) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION NUMBER M01138269 (CHANGEABLE COPY)
On file for this project
4 documents · 7 drawing sheets
Latest 3 of 11 filings on this floor.
Filed — no permit issued2 filings · 9 docs
ArchitectureGeneralPlumbingStructural
No filed description on record for this project.
On file for this project
4 documents · 11 drawing sheets
COOLER SUPPORTS BEING INSTALED ABOVE THE 5TH FL SLAB AND PIPE & PUMP SUPPORTS TO HUNG UNDER THE 5TH FL SLAB.