← Back
BuildNYC
Over six families without stores
811 CROTONA PARK NORTH
BRONX · BIN 2010000
💬 Discuss this project
1931Year Built
5Stories
C1Building Class
R7-1Zoning
17,225 sfGross Floor Area
22Units
Rent Stabilized42 Active Violations 41 unresolved · 1 paperwork only 1 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: 811 Crotona · 5,000 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 28p · 2 filings · 15 docs
Floor 1Unit 1A, Unit 1E9p · 2 filings · 15 docs
CellarPlumbing gas piping installation12p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
811 Crotona103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New Age401/06/2025
AR Consulting Engineer201/03/2023
Uni-D108/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Garden State of NJ Data Recovery303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CBB PlumbingPlumbing407/08/2026
Just Renovations & GCGeneral Contractor303/21/2026
Garden State of NJ DataGeneral Contractor107/08/2026
N Kofsky SonPlumbing103/21/2026
Four Star MechicalPlumbing108/05/1994
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746212/17/2024
AR Consulting Engineer P4054201/03/2023
Uni-D7898108/01/2022
Building Lifecycle
06/14/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM…
HPD violation · open
06/14/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH AT WEST…
HPD violation · open
06/14/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE KITCHEN LOCATED…
HPD violation · closed
06/14/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
06/14/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCBB Plumbing11/14/2024
DOB NOWPlumbingSigned-offCBB Plumbing06/04/2024
DOB NOWBoiler EquipmentSigned-offStar Industrial Service11/22/2023
DOB NOWGeneral ConstructionPermit IssuedGarden State of NJ Data02/01/2023
DOB NOWPlumbingSigned-offCBB Plumbing12/07/2022
DOB NOWBoiler EquipmentSigned-offCBB Plumbing12/06/2022
DOB NOWStructuralSigned-offJust Renovations & GC08/16/2022
BISPLISSUEDNationwide Mechanical08/05/1994
BISPLISSUEDN. Kofsky & Son04/24/1992
BISFBISSUEDAmbassador Fuel Oil10/17/1990
1 project · most recent 01/06/2025
Gas
FiledStatusContractorScope
01/06/2025Signed-offCBB PlumbingGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/06/2025Tenant Protection Plan Compliance—special
01/06/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/06/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/06/2025Maintenance informationStephen Shishkoenergy_progress
01/02/2025Maintenance informationStephen Shishkoenergy_progress
01/02/2025Tenant Protection Plan Compliance—special
01/02/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/02/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/04/2023Wood – Prefabricated I-JoistsQAZI RAZZAKspecial
01/04/2023FinalQAZI RAZZAKprogress
10/13/2022FinalQAZI RAZZAKprogress
10/13/2022Wood – Prefabricated I-JoistsQAZI RAZZAKspecial
07/12/2022FinalJackie Bolalinprogress
07/12/2022Fire-Resistant Penetrations and JointsJackie Bolalinspecial
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account