← Back
Over six families without stores
811 CROTONA PARK NORTH
BRONX · Tremont · BIN 2010000
💬 Discuss this project
1931Year Built
5Stories
C1Building Class
R7-1Zoning
17,225 sfGross Floor Area
22Units
Rent Stabilized41 Open Violations 40 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 811 CROTONA LLC · 5,000 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 28p · 2 filings · 15 docs
Floor 19p · 2 filings · 15 docs
Cellar12p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
811 CROTONA LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC401/06/2025
AR CONSULTING ENGINEER201/03/2023
UNI-D LLC108/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GARDEN STATE OF NJ DATA RECOVERY303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CBB PLUMBING CORPPlumbing407/08/2026
JUST RENOVATIONS & GC LLCGeneral Contractor303/21/2026
GARDEN STATE OF NJ DATA*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746212/17/2024
AR CONSULTING ENGINEER P.4054201/03/2023
UNI-D7898108/01/2022
Building Lifecycle
All (94)Filed (7)Permit Issued (7)Signed Off (1)Violation (60)Inspection (5)Special Inspection (14)
06/14/2026
Violation issued (HPD, closed)
B
06/14/2026
Violation issued (HPD, closed)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, closed)
B
06/14/2026
Violation issued (HPD, closed)
B
06/14/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, closed)
A
06/01/2026
Violation issued (HPD, closed)
B
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, closed)
B
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, closed)
B
06/01/2026
Violation issued (HPD, open)
A
11/22/2025
Violation issued (HPD, open)
A
11/22/2025
Violation issued (HPD, open)
B
11/22/2025
Violation issued (HPD, open)
A
11/22/2025
Violation issued (HPD, open)
B
11/22/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, open)
A
05/21/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
01/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2025
Filed — Alteration
INSTALL REPLACEMENT GAS PIPING AFTER EXISTING APPLIANCE VALVES AS PER PLANS. REFILING OF LAA# 210185609 AND 240052330. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
X07996435-P2
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
01/06/2025
Special inspection requirement — Maintenance information
Stephen Shishko
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCBB PLUMBING CORP11/14/2024
DOB NOWPlumbingSigned-offCBB PLUMBING CORP06/04/2024
DOB NOWBoiler EquipmentSigned-offSTAR INDUSTRIAL SERVICE11/22/2023
DOB NOWGeneral ConstructionPermit IssuedGARDEN STATE OF NJ DATA*02/01/2023
DOB NOWPlumbingSigned-offCBB PLUMBING CORP12/07/2022
DOB NOWBoiler EquipmentSigned-offCBB PLUMBING CORP12/06/2022
DOB NOWStructuralSigned-offJUST RENOVATIONS & GC LLC08/16/2022
BISPLISSUEDNATIONWIDE MECHANICAL INC08/05/1994
BISPLISSUEDN. KOFSKY & SON, INC.04/24/1992
BISFBISSUEDAMBASSADOR FUEL OIL CO.10/17/1990
1 project · most recent 01/06/2025
Gas
FiledStatusContractorScope
01/06/2025Signed-offCBB PLUMBING CORPGas
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/06/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/06/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/06/2025Maintenance informationStephen Shishkoenergy_progress
01/06/2025Tenant Protection Plan Compliance—special
01/02/2025Tenant Protection Plan Compliance—special
01/02/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/02/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/02/2025Maintenance informationStephen Shishkoenergy_progress
01/04/2023Wood – Prefabricated I-JoistsQAZI RAZZAKspecial
01/04/2023FinalQAZI RAZZAKprogress
10/13/2022FinalQAZI RAZZAKprogress
10/13/2022Wood – Prefabricated I-JoistsQAZI RAZZAKspecial
07/12/2022FinalJackie Bolalinprogress
07/12/2022Fire-Resistant Penetrations and JointsJackie Bolalinspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00773709-I1Request digital key ↗
08/23/2026X07996397-I1Request digital key ↗
08/23/2026X00779580-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026X07996435-P2Open ↗
08/29/2026X07996435-P2Open ↗
08/29/2026X07996435-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026X07996397-I1Open ↗
08/23/2026X00779580-I1Open ↗
08/20/2026X07996435-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026X00779580-P1Open ↗
08/24/2026X00779580-I1Open ↗
08/23/2026X00773709-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026X07996397-I1Open ↗
08/23/2026X00779580-I1Open ↗
08/20/2026X07996435-P2Open ↗
Showing 3 of 7 on file for this type