← Back
Large suburban residence
8115 RIDGE BOULEVARD
BROOKLYN · BIN 3151612
💬 Discuss this project
1930Year Built
2.75Stories
A3Building Class
R4AZoning
2,420 sfGross Floor Area
1Units
Large suburban residence · 3,300 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/02/2021$1.5M—Private party → Private party$612/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S M TAM ARCHITECT, PLLC412/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOMEPRO GENERAL CONTRACTINGGeneral Contractor903/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
WATERWORKS PLUMBING MECHPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GLOBAL ARCH DESIGN & BUIL3397412/06/2022
Building Lifecycle
All (58)Filed (4)Permit Issued (4)Signed Off (2)Inspection (4)Objection (14)Special Inspection (30)
02/23/2023
Signed off — Alteration
B00670134-I1
02/17/2023
Signed off — Alteration
PROPOSED PLUMBING WORK AND GAS PIPING SYSTEM AT EXISTING 1FAMILY BUILDING AT 1ST, 2ND AND CELLAR FLOORS. NO CHANGEIN USE AND OCCUPANCY NO EXTERIOR WORK IS PROPOSED.
B00702638-I1
02/14/2023
Permit issued — General Construction
B00670134-I1-ST
02/14/2023
Permit issued — Structural
B00670134-I1-MS
12/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NITHIN JOHN
12/08/2022
Special inspection requirement — Ventilation and air distribution system
NITHIN JOHN
12/08/2022
Special inspection requirement — Air barrier - visual inspection
NITHIN JOHN
12/08/2022
Special inspection requirement — Interior lighting power
NITHIN JOHN
12/08/2022
Special inspection requirement — Fenestration air leakage
NITHIN JOHN
12/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
NITHIN JOHN
12/08/2022
Special inspection requirement — Structural Steel - Details
NITHIN JOHN
12/08/2022
Special inspection requirement — Heating Systems
NITHIN JOHN
12/08/2022
Special inspection requirement — Mechanical Systems
NITHIN JOHN
12/08/2022
Special inspection requirement — Concrete - Cast-In-Place
NITHIN JOHN
12/08/2022
Special inspection requirement — Structural Steel - High Strength Bolting
NITHIN JOHN
12/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
12/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NITHIN JOHN
12/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
NITHIN JOHN
12/08/2022
Special inspection requirement — Final
NITHIN JOHN
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
12/08/2022
Special inspection requirement — Permanent certificate
NITHIN JOHN
12/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
NITHIN JOHN
12/08/2022
Special inspection requirement — Maintenance information
NITHIN JOHN
12/08/2022
Special inspection requirement — Fenestration areas
NITHIN JOHN
12/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
12/06/2022
Filed — Alteration
B00670134-P1
11/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
NITHIN JOHN
11/29/2022
Special inspection requirement — Mechanical Systems
NITHIN JOHN
11/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NITHIN JOHN
11/29/2022
Special inspection requirement — Structural Steel - Details
NITHIN JOHN
11/29/2022
Special inspection requirement — Structural Steel - High Strength Bolting
NITHIN JOHN
11/29/2022
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
11/29/2022
Special inspection requirement — Final
NITHIN JOHN
11/29/2022
Special inspection requirement — Concrete - Cast-In-Place
NITHIN JOHN
11/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
11/15/2022
Filed — Alteration
PROPOSED PLUMBING WORK AND GAS PIPING SYSTEM AT EXISTING 1FAMILY BUILDING AT 1ST, 2ND AND CELLAR FLOORS. NO CHANGEIN USE AND OCCUPANCY NO EXTERIOR WORK IS PROPOSED.
B00702638-P1
11/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/28/2022
Permit issued — Plumbing
B00702638-I1-PL
04/18/2022
Objection resolved — Addressed
04/18/2022
Objection resolved — Addressed
04/18/2022
Objection resolved — Addressed
04/18/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Scope
04/12/2022
Objection raised — Fire_Protection
04/12/2022
Objection raised — Inspections
04/12/2022
Objection raised — Fire_Protection
04/12/2022
Objection raised — Inspections
04/12/2022
Objection raised — Admin
04/12/2022
Objection raised — Inspections
04/05/2022
Filed — Alteration
PROPOSED PLUMBING WORK AND GAS PIPING SYSTEM AT EXISTING 1FAMILY BUILDING AT 1ST, 2ND AND CELLAR FLOORS. NO CHANGEIN USE AND OCCUPANCY NO EXTERIOR WORK IS PROPOSED.
B00702638-I1
02/18/2022
Permit issued — General Construction
B00670134-I1-GC
02/09/2022
Filed — Alteration
B00670134-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHOMEPRO GENERAL CONTRACTI02/14/2023
DOB NOWStructuralSigned-offHOMEPRO GENERAL CONTRACTI02/14/2023
DOB NOWPlumbingSigned-offWATERWORKS PLUMBING MECH04/28/2022
DOB NOWGeneral ConstructionSigned-offHOMEPRO GENERAL CONTRACTI02/18/2022
BISOTISSUEDSUNRUN INSTALLATION SVC06/02/2022
2 projects · most recent 12/01/2022
General Wiring
FiledStatusContractorScope
12/01/2022CompleteGOODALL ELECTRIC CORPGeneral Wiring
08/01/2022CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
12/08/2022HVAC-R and service water piping design and insulationNITHIN JOHNenergy_progress
12/08/2022Ventilation and air distribution systemNITHIN JOHNenergy_progress
12/08/2022Air barrier - visual inspectionNITHIN JOHNenergy_progress
12/08/2022Interior lighting powerNITHIN JOHNenergy_progress
12/08/2022Fenestration air leakageNITHIN JOHNenergy_progress
12/08/2022HVAC-R and service water heating equipmentNITHIN JOHNenergy_progress
12/08/2022Structural Steel - DetailsNITHIN JOHNspecial
12/08/2022Heating SystemsNITHIN JOHNspecial
12/08/2022Mechanical SystemsNITHIN JOHNspecial
12/08/2022Concrete - Cast-In-PlaceNITHIN JOHNspecial
12/08/2022Structural Steel - High Strength BoltingNITHIN JOHNspecial
12/08/2022Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
12/08/2022Structural Stability – Alterations of existing buildingsNITHIN JOHNspecial
12/08/2022Fire-Resistance Rated ConstructionNITHIN JOHNprogress
12/08/2022FinalNITHIN JOHNprogress
12/08/2022Energy Code Compliance InspectionsNITHIN JOHNprogress
12/08/2022Permanent certificateNITHIN JOHNenergy_progress
12/08/2022HVAC-R and service water heating system controlsNITHIN JOHNenergy_progress
12/08/2022Maintenance informationNITHIN JOHNenergy_progress
12/08/2022Fenestration areasNITHIN JOHNenergy_progress
12/08/2022Fenestration and door U-factor and product ratingsNITHIN JOHNenergy_progress
11/29/2022Fire-Resistance Rated ConstructionNITHIN JOHNprogress
11/29/2022Mechanical SystemsNITHIN JOHNspecial
11/29/2022Structural Stability – Alterations of existing buildingsNITHIN JOHNspecial
11/29/2022Structural Steel - DetailsNITHIN JOHNspecial
Latest 25 of 37.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00670134-P1Request digital key ↗
08/31/2026B00670134-I1Request digital key ↗
08/30/2026B00702638-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
08/24/2022340856194Open ↗
08/19/2022340856194Open ↗
06/01/2022340856194Open ↗
▸BISWORK PERMIT APPLICATION1
06/02/2022340856194Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026B00702638-P1Open ↗
09/02/2026B00702638-P1Open ↗
09/02/2026B00702638-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00702638-P1Open ↗
08/27/2026B00670134-I1Open ↗
08/27/2026B00670134-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00670134-P1Open ↗
08/31/2026B00670134-I1Open ↗
08/13/2026B00702638-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/01/2022340856194Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/01/2022340856194Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/01/2022340856194Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
06/02/2022340856194Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00670134-P1Open ↗
08/31/2026B00670134-I1Open ↗
08/13/2026B00702638-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/01/2022340856194Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/04/2023340856194Open ↗
06/01/2022340856194Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/04/2023340856194Open ↗
02/04/2023340856194Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00702638-I1Open ↗
08/13/2026B00670134-I1Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/06/2023340856194Open ↗
▸BISNYCECC ANALYSIS1
06/01/2022340856194Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/01/2022340856194Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/01/2022340856194Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/04/2023340856194Open ↗
06/01/2022340856194Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/06/2023340856194Open ↗
02/06/2023340856194Open ↗
06/01/2022340856194Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/06/2023340856194Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/04/2023340856194Open ↗
02/04/2023340856194Open ↗
06/01/2022340856194Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/01/2022340856194Open ↗
▸BISADDITIONAL INFORMATION1
08/24/2022340856194Open ↗