Primarily 1 family with 1 store or office
8117 7TH AVENUE
BROOKLYN · Dyker Heights · BIN 3151845
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R5BZoning
2,914 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: J & J REALTY4HEALTH · 2,052 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Doctor's office interior partitions and storefront5p · 1 filing · 12 docs
Floor 1Doctor's office and dwelling unit10p · 3 filings · 20 docs
Cellar8117 7th Ave. Realty LLC13p · 4 filings · 20 docs
Site & exteriorJa Cardiovascular3p · 2 filings · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2024$1.1M—8117 7TH AVENUE REALTY LLC → J & J REALTY4HEALTH, INC.$395/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect607/16/2025
Zenith Home Inspections112/31/2024
Paper Plane Architecture205/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tsolaki's Expediting403/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alnaya BuildersGeneral Contractor407/08/2026
Alnaya BuildersScaffold203/21/2026
Paul's ElectricElectrical103/22/2026
City SignsSign hanger107/08/2026
Jodom MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steven R. Savino Architects1216307/16/2025
Paper Plane Architecture7155205/24/2023
Building Lifecycle
All (95)Filed (9)Permit Issued (6)Signed Off (6)Violation (35)Inspection (5)Objection (4)Special Inspection (30)
12/03/2025
Signed off — Alteration
INSTALLATION OF NEW INTERIOR NON-BEARING WALL PARTITIONS FOR DOCTORS OFFICE ON THE 1ST FL. NEW STORE FRONT W/NEW STUCCO FINISH OVER EXIST BRICK VENEER ON THE FRONT OF THE BLDG. UPON COMPLETION OF APP THE PREV APP'S (320256735 & 3007300074) WILL BE WITHDRA
B01069406-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Signed off — Alteration
B01071042-I1
09/02/2025
Signed off — Alteration
REMOVE EXISTING BOILER IN THE CELLAR, INSTALL 2-NEW LAVS, 2- NEW TOILETS, 1- KITCHEN SINK AND 3- EXAM ROOM HAND SINKS ON THE FIRST FLOOR.
B01071036-I1
07/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/24/2025
Special inspection requirement — Interior lighting power
Steven Savino
07/24/2025
Special inspection requirement — Lighting controls
Steven Savino
07/24/2025
Special inspection requirement — Final
Steven Savino
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/16/2025
Filed — Alteration
INSTALLATION OF NEW INTERIOR NON-BEARING WALL PARTITIONS FOR DOCTORS OFFICE ON THE 1ST FL. NEW STORE FRONT W/NEW STUCCO FINISH OVER EXIST BRICK VENEER ON THE FRONT OF THE BLDG. UPON COMPLETION OF APP THE PREV APP'S (320256735 & 3007300074) WILL BE WITHDRA
B01069406-P1
07/16/2025
Filed — Alteration
REMOVE EXISTING BOILER IN THE CELLAR, INSTALL 2-NEW LAVS, 2- NEW TOILETS, 1- KITCHEN SINK AND 3- EXAM ROOM HAND SINKS ON THE FIRST FLOOR.
B01071036-P1
07/08/2025
Signed off — Alteration
B01069396-I1
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
03/28/2025
Special inspection requirement — Final
Steven Savino
03/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
03/28/2025
Special inspection requirement — Interior lighting power
Steven Savino
03/28/2025
Special inspection requirement — Lighting controls
Steven Savino
03/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
03/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
03/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
02/25/2025
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - JA CARDIOVASCULAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01153630-I1
01/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2025
Permit issued — Sign
B01153630-I1-SG
01/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/31/2024
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - JA CARDIOVASCULAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01153630-I1
08/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2024
Permit issued — Mechanical Systems
B01071042-I1-MS
07/26/2024
Permit issued — Plumbing
B01071036-I1-PL
07/23/2024
Filed — Alteration
B01071042-I1
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/22/2024
Filed — Alteration
REMOVE EXISTING BOILER IN THE CELLAR, INSTALL 2-NEW LAVS, 2- NEW TOILETS, 1- KITCHEN SINK AND 3- EXAM ROOM HAND SINKS ON THE FIRST FLOOR.
B01071036-I1
07/22/2024
Permit issued — Construction Fence
B01069396-I1-FN
07/22/2024
Permit issued — General Construction
B01069406-I1-GC
07/11/2024
Filed — Alteration
INSTALLATION OF NEW INTERIOR NON-BEARING WALL PARTITIONS FOR DOCTORS OFFICE ON THE 1ST FL. NEW STORE FRONT W/NEW STUCCO FINISH OVER EXIST BRICK VENEER ON THE FRONT OF THE BLDG. UPON COMPLETION OF APP THE PREV APP'S (320256735 & 3007300074) WILL BE WITHDRA
B01069406-I1
07/11/2024
Filed — Alteration
B01069396-I1
06/24/2024
Special inspection requirement — Mechanical Systems
Steven Savino
06/24/2024
Special inspection requirement — Final
Steven Savino
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2023
Signed off — Alteration
PROPOSED INTERIOR FIT OUT RENOVATIONS TO EXISTING CELLAR TO TAKE OVER DOBJOB #321103756 AND CORRECT VIOLATION #35097835J TO INCLUDE INSTALLATION OFNON LOAD BEARING WALLS, AND FIRE RATED DOOR.
B00820237-I1
05/31/2023
Permit issued — General Construction
B00820237-I1-GC
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Janiel Collaqi
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Janiel Collaqi
05/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Janiel Collaqi
05/26/2023
Special inspection requirement — Final
Janiel Collaqi
05/24/2023
Filed — Alteration
PROPOSED INTERIOR FIT OUT RENOVATIONS TO EXISTING CELLAR TO TAKE OVER DOBJOB #321103756 AND CORRECT VIOLATION #35097835J TO INCLUDE INSTALLATION OFNON LOAD BEARING WALLS, AND FIRE RATED DOOR.
B00820237-P1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection resolved — Addressed
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offElmer Dawson01/21/2025
DOB NOWMechanical SystemsSigned-offAlnaya Builders07/29/2024
DOB NOWPlumbingSigned-offJodom Mechanical07/26/2024
DOB NOWConstruction FenceSigned-offAlnaya Builders07/22/2024
DOB NOWGeneral ConstructionSigned-offAlnaya Builders07/22/2024
DOB NOWGeneral ConstructionSigned-offAlnaya Builders05/31/2023
BISOTISSUEDLeyon Diamond Construction08/07/2015
BISOTISSUEDGMR Contracting05/13/1998
1 project · most recent 08/05/2024
General Wiring
FiledStatusContractorScope
08/05/2024CompletePaul's ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/24/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
07/24/2025Energy Code Compliance InspectionsSteven Savinoprogress
07/24/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
07/24/2025Energy Code Compliance InspectionsSteven Savinoprogress
07/24/2025Interior lighting powerSteven Savinoenergy_progress
07/24/2025Lighting controlsSteven Savinoenergy_progress
07/24/2025FinalSteven Savinoprogress
07/24/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
07/24/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/24/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
03/28/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
03/28/2025Energy Code Compliance InspectionsSteven Savinoprogress
03/28/2025FinalSteven Savinoprogress
03/28/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
03/28/2025Interior lighting powerSteven Savinoenergy_progress
03/28/2025Lighting controlsSteven Savinoenergy_progress
03/19/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
03/19/2025Energy Code Compliance InspectionsSteven Savinoprogress
03/19/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
03/19/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/23/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
07/23/2024Energy Code Compliance InspectionsSteven Savinoprogress
07/23/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/23/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/24/2024Mechanical SystemsSteven Savinospecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ja CardiovascularMedical / Healthcare—
Project B01153630 Alteration · LOC Issued · 12/31/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B00820237-I1Request digital key ↗
08/27/2026B00820237-P1Request digital key ↗
08/24/2026B01069396-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
08/11/2015321103756Open ↗
01/03/2011320256735Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/07/2015321103756Open ↗
12/28/2010320256735Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026B01069406-I1Open ↗
09/02/2026B01069406-I1Open ↗
08/30/2026B01071042-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026B01069396-I1Open ↗
08/24/2026B01069406-I1Open ↗
08/24/2026B01071036-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01069406-I1Open ↗
08/30/2026B01071042-I1Open ↗
08/26/2026B01069406-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/07/2015321103756Open ↗
12/28/2010320256735Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/28/2010320256735Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/28/2010320256735Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/07/2015321103756Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/28/2010320256735Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026B01069406-I1Open ↗
08/24/2026B01071036-P1Open ↗
08/24/2026B01071036-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/28/2010320256735Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
04/07/2015321103756Open ↗
12/28/2010320256735Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/07/2015321103756Open ↗
12/28/2010320256735Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/07/2015321103756Open ↗
12/28/2010320256735Open ↗