← Back
Two family converted from one family
812 THROGS NECK EXPWY SR
BRONX · BIN 2077992
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3AZoning
2,208 sfGross Floor Area
2Units
Rent Stabilized
Two family converted from one family · 3,742 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2025$1.2M—— → —$528/sf building
01/24/2024$488K—— → —$221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN704/16/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor307/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519604/16/2025
Building Lifecycle
All (60)Filed (7)Permit Issued (3)Signed Off (2)Inspection (8)Objection (10)Special Inspection (30)
08/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
X00976165-P4
04/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/16/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/16/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/16/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/16/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/16/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/16/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/16/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
04/16/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/16/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
04/16/2025
Special inspection requirement — Metering
Younes Abouyaala
04/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
04/16/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
04/16/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/09/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
X00976165-P3
01/23/2025
Signed off — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #X00976165-I1
X01034926-I1
12/15/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/20/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
X00976165-P2
09/20/2024
Special inspection requirement — Metering
Younes Abouyaala
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/20/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/20/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/20/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/20/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
09/20/2024
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
09/20/2024
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2024
Objection resolved — Addressed
08/14/2024
Signed off — Alteration
installation of temporary construction wood fence filed in conjunction with ALT I application #X00976165-I1
X01044931-I1
08/12/2024
Objection resolved — Addressed
07/27/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/26/2024
Objection raised — Energy
07/26/2024
Objection raised — Fire_Protection
07/25/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
X00976165-P1
06/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2024
Permit issued — Plumbing
X01034926-I1-PL
05/07/2024
Permit issued — Construction Fence
X01044931-I1-FN
05/07/2024
Permit issued — Structural
X00976165-I1-GC-CX
05/02/2024
Filed — Alteration
installation of temporary construction wood fence filed in conjunction with ALT I application #X00976165-I1
X01044931-I1
04/19/2024
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #X00976165-I1
X01034926-I1
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
03/15/2024
Objection raised — Other
03/06/2024
Objection raised — Energy
03/05/2024
Objection raised — Zoning
03/03/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
X00976165-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC05/20/2024
DOB NOWConstruction FenceSigned-off26 BONIM05/07/2024
DOB NOWStructuralPermit Issued26 BONIM05/07/2024
2 projects · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025Permit IssuedMEO ELECTRIC CORP3 meters, 1 new_meters
05/07/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 04/16/2025
Concrete Wood
FiledStatusContractorScope
04/16/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/15/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
04/16/2025Permanent certificateYounes Abouyaalaenergy_progress
04/16/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/16/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/16/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/16/2025Interior lighting powerYounes Abouyaalaenergy_progress
04/16/2025Maintenance informationYounes Abouyaalaenergy_progress
04/16/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
04/16/2025Fenestration air leakageYounes Abouyaalaenergy_progress
04/16/2025Fenestration areasYounes Abouyaalaenergy_progress
04/16/2025MeteringYounes Abouyaalaenergy_progress
04/16/2025Structural Wood FrameYounes Abouyaalaprogress
04/16/2025Footing and FoundationYounes Abouyaalaprogress
04/16/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/16/2025FinalNAVEEN KUMARprogress
04/16/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/16/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/16/2025Subgrade InspectionsYounes Abouyaalaspecial
04/16/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
04/16/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/16/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
09/20/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
09/20/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
09/20/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 69.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026X01034926-I1Request digital key ↗
08/21/2026X01044931-I1Request digital key ↗
08/19/2026X00976165-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P3Open ↗
08/13/2026X00976165-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P4Open ↗
08/13/2026X00976165-P3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
08/27/2026X00976165-P4Open ↗
08/27/2026X00976165-P4Open ↗
08/27/2026X00976165-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026X00976165-P4Open ↗
08/27/2026X00976165-P4Open ↗
08/27/2026X00976165-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026X01044931-I1Open ↗
08/19/2026X00976165-P4Open ↗
08/19/2026X00976165-P3Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/19/2026X00976165-P4Open ↗
08/19/2026X00976165-P3Open ↗
08/19/2026X00976165-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026X00976165-P4Open ↗
08/19/2026X00976165-P3Open ↗
08/19/2026X00976165-P2Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P2Open ↗
08/13/2026X00976165-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026X00976165-I1Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P1Open ↗
08/13/2026X00976165-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P3Open ↗
08/13/2026X00976165-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/15/2026X00976165-I1Open ↗
08/13/2026X00976165-P3Open ↗
08/13/2026X00976165-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/19/2026X00976165-P3Open ↗
08/19/2026X00976165-P4Open ↗
08/19/2026X00976165-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/15/2026X00976165-I1Open ↗