ECB06/12/2025FAILURE TO MAINTAIN BUILDINGS WALLS OR APPURTENANCES; OBSERVED EXTERIOR 6' CMU WALL LEANING TOWARDS DRIVEWAY/WALK WAY AT EXP 2., MAINTAIN EXTERIOR BUILDING WALL$25K due
ECB03/10/2025AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1,2 AND 3 WITH A VALID PERMIT EXPIRATION DATE 05-25-2025 AND WITH THE FOLLOWING OBJECTION INOPERABLE LIGHT$2K due
ECB07/25/2024OBSERVED NO TOE BOARDS PROVIDED WHERE REQUIRED AT MULTIPLE LOCATIONS, GUARD RAIL MISSING AT GROUND FLOOR AT MULTIPLE LOCATIONS, STAIR TOWER INSTALLED CRACKED MUDSILL AND NOT NAILED, MISSING HAND-RAIL FOR STAIR$2K due
DOB07/10/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB05/09/2024FAILURE TO MAINTAIN WALL, NOTED: AT TIME OF INSPECTION, OBSERVED 6" CMU WALL APPROXIMATELY 6'-0"HX 30'-0"L AT EXPOSURE #2, LEANING TOWARDS THE PRIVATE WALKWAY, MAINTAIN EXTERIOR BUILDING WALL$12K due
DOB08/30/2021STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE THE SITE SAFE/CONTACT THE BOR OUGH COMM. OFFICE AT 718 802-3677
DOB08/30/2021STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE THE SITE SAFE, CONTACT THE BOROUGH COMM. ODFFICE AT 718 802-3677
DOB08/30/2021STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE THE SITE SAFE CONTACT THE BOR OUGH COMM. OFFICE AT 718 802-3677
DOB08/30/2021STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE THE SITE SAFE/CONTACT THE BOR OUGH COMM. OFFICE AT 718 802-3677
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB08/24/2020CBC3307.7.7-CONDITION OF FENCE NOTE AT THE TIME OF INSPECTION OF A 4 STORY NEW BUILDING CONSTRUCTION I OBSERVED A CONSTRUCTION FENCE IN PLACE UPON MY INPSETCION I OBSERVED THE CONSTRUCTION FENCE WAS LEANING INT$1K due
DOB03/04/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/04/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/04/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/04/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/29/2020NOT CONFORM W/ SITE SAFETY PLANS. AT THE TIME OF MY INSPECTION OF AN ACTIVE PROPOSED 4 STORY NB SITE,AT FOUNDATION STAGE. OBSERVED ON SSP THAT 2 MEANS OF EGRESS IS REQUIRED. A LADDER AT THE FOUNDATION STAGE,ONL$12K due
ECB01/15/2020UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTE:ATTHE TIME OF INSPECTION WITH A COMPLAINT ABOUT WORK AGAINST STOP WORK ORDER,OBSERVED A ACTIVE JOBSITE.WORKERS DOING FORM WORK,REBAR WORK AT F$5K due
ECB01/08/2020FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO THE COMMENCEMENT OF EARTHWORK.NOTE:AT THE TIME OF INSPECTION OF A 4 STORY NEW BUILDING IN EARTHWORK PHASE UPON REVIEW OF DEPARTMENT RECORDS THERE WAS NO NOTIFICATION IN$2K due
ECB01/08/2020PERMIT HOLDER FAILED TO ENSURE WORKERS RECIEVE SITE SAFETY ORIENTATIONNOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BUILDING IN EARTHWORK PHASE CONSISTS OF USING ELEVATOR,SOE WORK.UPON REQUEST FOR SITE SAF$5K due
ECB12/07/2019BC3304.1.1/FAILURE TO MAINTAIN SIDEWALK IN FONT OF PROPERTY DURING CONSTRUCTION OPERATIONS.AT TIME OF INSPECTION A CONSTRUCTION FENCE WITH DOUBLE DOOR WAS INSTALLED AT EXPOSURE#2(WHICH IS 21ST AVE)HOWEVER,IN FR$5K due
ECB12/07/2019JOBSITE FENCE NOT MAINTAIND PURSUANT TO SUBSECTION.AT TIME OF INSPECTION A CONSTRUCTION FENCE WAS INSTALLED AT EXPOSURE#1(82ND ST)EXPOSURE#2(21ST AVENU)AND AT EXPOSURE #3(WHICH WAS A BASEMENT TYPE DRIVEWAY NEXT$1K due
ECB12/05/20193307.1-3307.2.6=PROTECTION OF PEDESTRIAN NOTE AT TIME OF INSPECTION OF A 4 STORY BUILDING AT EXCAVAION STAGE NO CONSTRUCTING WORK IN PROGRESS I OBSERVED MULTUPLE CRACKS () AND UNEVEN SURFACE ON PEDESTRIAN WALKW$2K due
ECB12/05/20193303.4.7=MATERIAL STORAGE NEAR SIDEWLAK WALKWAY AND PATHWYS NOTE AT TIME OF MY INSPECTION OF A 4 STORY (BUILDING UNDER CONSTRUCTION AT EXCAVATION STAGE NO WORK IN PROGRESS I OBSERVED A DUMPSTER BEING STORED LES$2K due
ECB12/05/20193303.4.2=WASTE DUMPSTER NOTE AT TIM EO F MY SINEPCTION FO A 4 STORY BUILDING AT EXCAVATION STAGE NO WORK IN PROGRESS I OBSERVED ON TEH STREET A 30 CU YARD DUMPSTER (CONTAINER) AT EXPO 2 ,21 AVENUE FULL OF DEBRI$2K due
DOB12/04/2019STOP ALL WORK IMMEDIATELY MAKE THE SITE SAFE CONTACT BOROUGH COMM. OFF ICE AT 718 802-3677 FOR INFORMATION
ECB11/15/2019PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTE;AT TIME OFMY INSPECTION OF A 4 STORY NEW BLDG UNDER CONSTRUCTION AT EXCAVATION STAGE NO WORK IN PROGRESS I OBSERVED THAT THE PEDESTRIAN NO WORK IN PRO$2K due
DOB06/17/2019UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. CONTAINED IN COMPLAINT#3699627 FULL SWO ISSUED ON 04/30.2019. AT TIME OF MY INSPECTION FOUND MEN OPERATING CONSTRUCTION MACHINERY ACTIVELY EXCAVATION SITE INSTALLING PILES.
DOB04/30/2019BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOP UNDER PERMIT#320909077 PERMIT HOLDER HAS INFORMED THE DEPARTMENT THAT HE/SHE HAS WITHDRAWN/ STOP ALL WORK IMMEDIATELY CONTACT BOROUGH COMM. 718 802-3685
DOB05/30/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/09/2018FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. OBSERVED CONDITION CITED INNOV# 35237442K CONTINUE TO EXIST. APPROX 10 X 20 FT PILE OF COMBUSTIBLE DEBRIS PRESENT ON SITE. REM: REMOVE DEBRIS AS PER CODE.$6K due
DOB02/21/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/29/2017FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.OBSERVED AT TIME OF INSPECTION A LARGE PILE OF DEBRIS AT REAR OF SITE.10'-00 HIGH 20'-00" WIDE AND 10-00"DEEP CONSISTING OF COMBUSTIBLE CONSTRU$2K due
DOB09/07/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB09/16/2025AT THE TIME OF INSPECTION OF A PROPOSED 4-STORY COMMUNITY FACILITY IT WAS OBSERVED PLYWOOD JOBSITE FENCE SURROUNDING THE PROPERTY WITH PANELS DETERIORATED, SPRAY-PAINTED WITH GRAFFITI AND CHIPPED WITH HOLES ORHearing held — result not yet published$1K proposed
ECB06/09/20163307.3 NO OVERHEAD PROTECTION.NOTICED @TIME OF INSPECTION DEMOLITION OF GARAGE IN PROGRESS.NOTICED @EXP#2 NO OVERHEAD PROTECTION PROVIDED FOR ADJACENT YARD.REM:STOP ALL DEMO&PROVIDE OVERHEAD PROTECTION.Nothing owed — awaiting certificate of correction
Office with commercial, 1-6 stories · 6,000 sf lot · 3.88 FAR built · Flood zone X