← Back
Two family brick
8125 6 AVENUE
BROOKLYN · Bay Ridge · BIN 3151818
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,562 sfGross Floor Area
2Units
Two family brick · 1,897 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 27p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2021$1.5M—Private party → Private party$568/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.510/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PENN ELECTL CONTRACTINGElectrical203/22/2026
ST SAFETY CONS. INCGeneral Contractor107/08/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613510/20/2022
Building Lifecycle
All (32)Filed (5)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (19)
10/26/2022
Signed off — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION & COSMETIC WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: B00570074. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00570068-I1
10/26/2022
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00570068. CAP & REMOVE OIL TANK, OIL BOILER & HWH AT CEL. INSTALL 2 HWH, 2 BOILER, WASHER, DRYER & 3-PIECE BATHROOM AT CEL; 1 NEW BATHROOM ON 1ST & 2ND FL.
B00570074-I1
10/20/2022
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION & COSMETIC WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: B00570074. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00570068-P1
09/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/01/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00570068. CAP & REMOVE OIL TANK, OIL BOILER & HWH AT CEL. INSTALL 2 HWH, 2 BOILER, WASHER, DRYER & 3-PIECE BATHROOM AT CEL; 1 NEW BATHROOM ON 1ST & 2ND FL.
B00570074-P2
08/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/01/2022
Special inspection requirement — Maintenance information
Fran Huang
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/01/2022
Special inspection requirement — Maintenance information
Fran Huang
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
03/24/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/10/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00570068. CAP & REMOVE OIL TANK, OIL BOILER & HWH AT CEL. INSTALL 2 HWH, 2 BOILER, WASHER, DRYER & 3-PIECE BATHROOM AT CEL; 1 NEW BATHROOM ON 1ST & 2ND FL.
B00570074-P1
03/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
03/09/2022
Special inspection requirement — Final
Fran Huang
03/09/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
03/09/2022
Special inspection requirement — Interior lighting power
Fran Huang
03/09/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
03/09/2022
Special inspection requirement — Permanent certificate
Fran Huang
03/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/29/2021
Permit issued — Plumbing
B00570074-I1-PL
11/24/2021
Permit issued — General Construction
B00570068-I1-GC
09/07/2021
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION & COSMETIC WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow APPLICATION#: B00570074. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00570068-I1
09/07/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00570068. CAP & REMOVE OIL TANK, OIL BOILER & HWH AT CEL. INSTALL 2 HWH, 2 BOILER, WASHER, DRYER & 3-PIECE BATHROOM AT CEL; 1 NEW BATHROOM ON 1ST & 2ND FL.
B00570074-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP11/29/2021
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC11/24/2021
1 project · most recent 03/24/2023
General Wiring
FiledStatusContractorScope
03/24/2023CompletePENN ELECTL CONTRACTINGGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/01/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
08/01/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
08/01/2022Maintenance informationFran Huangenergy_progress
08/01/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/01/2022Energy Code Compliance InspectionsFran Huangprogress
08/01/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/01/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
08/01/2022Maintenance informationFran Huangenergy_progress
08/01/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/01/2022Energy Code Compliance InspectionsFran Huangprogress
08/01/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/01/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
03/09/2022Energy Code Compliance InspectionsFran Huangprogress
03/09/2022FinalFran Huangprogress
03/09/2022Air barrier - visual inspectionFran Huangenergy_progress
03/09/2022Interior lighting powerFran Huangenergy_progress
03/09/2022Fenestration air leakageFran Huangenergy_progress
03/09/2022Permanent certificateFran Huangenergy_progress
03/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00570074-P2Request digital key ↗
09/01/2026B00570074-P1Request digital key ↗
09/01/2026B00570074-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B00570074-P1Open ↗
08/13/2026B00570068-P1Open ↗
08/13/2026B00570068-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B00570074-P2Open ↗
09/01/2026B00570074-P2Open ↗
09/01/2026B00570074-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00570074-P1Open ↗
08/13/2026B00570074-P2Open ↗
08/13/2026B00570068-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00570074-P2Open ↗
09/01/2026B00570068-P1Open ↗
08/26/2026B00570074-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00570068-P1Open ↗
08/13/2026B00570074-I1Open ↗
08/13/2026B00570074-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00570074-I1Open ↗
08/13/2026B00570068-I1Open ↗