Primarily 1 family with 1 store or office
8125 7 AVENUE
BROOKLYN · BIN 3151842
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R5BZoning
3,116 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · Owner of record: D.K. REALTY HOLDINGS, LLC · 1,558 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION604/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLIED BUILDING MAINT.CORGeneral Contractor607/08/2026
K.H. WERBER PLBG CO INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355504/03/2025
Building Lifecycle
All (50)Filed (6)Permit Issued (6)Signed Off (3)Inspection (6)Special Inspection (29)
06/20/2025
Signed off — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-S2
06/20/2025
Signed off — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-I1
06/20/2025
Signed off — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-S1
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2025
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-P2
04/03/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
04/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
04/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/02/2025
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-P1
04/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/02/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/02/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
03/27/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
03/27/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
03/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
03/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
03/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2024
Permit issued — General Construction
B01002663-I1-GC
09/16/2024
Permit issued — Construction Fence
B01002663-S3-FN
07/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/25/2024
Permit issued — Construction Fence
B01002663-S3-FN
04/25/2024
Permit issued — General Construction
B01002663-I1-GC
04/03/2024
Permit issued — Boiler Equipment
B01002663-S2-BE
04/02/2024
Permit issued — Plumbing
B01002663-S1-PL
03/27/2024
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-S2
03/22/2024
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-I1
03/22/2024
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-S1
03/22/2024
Filed — Alteration
GAS PIPING FOR FOUR (4) BOILERS AND FOUR (4) WATER HEATERS, REGISTER FOUR (4 )WATER HEATERS; INSTALL TWO (2) FIXTURE TOILET IN CELLAR, RELOCATE A SINK & CREATE A TWO (2) FIXTURE ADA TOILET ON THE 1st FLOOR
B01002663-S3
03/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
03/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
02/07/2024
Special inspection requirement — Final
Steven Bendoraitis
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALLIED BUILDING MAINT.COR09/16/2024
DOB NOWConstruction FencePermit IssuedALLIED BUILDING MAINT.COR09/16/2024
DOB NOWConstruction FencePermit IssuedALLIED BUILDING MAINT.COR04/25/2024
DOB NOWGeneral ConstructionSigned-offALLIED BUILDING MAINT.COR04/25/2024
DOB NOWBoiler EquipmentSigned-offK.H. WERBER PLBG CO INC04/03/2024
DOB NOWPlumbingSigned-offK.H. WERBER PLBG CO INC04/02/2024
1 project · most recent 06/18/2024
General Wiring
FiledStatusContractorScope
06/18/2024Permit IssuedABILENE ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/03/2025Maintenance informationSteven Bendoraitisenergy_progress
04/03/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/03/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/03/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
04/03/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
04/03/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/03/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
04/02/2025Tenant Protection Plan Compliance—special
04/02/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/02/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
04/02/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/02/2025Maintenance informationSteven Bendoraitisenergy_progress
04/02/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/02/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
04/02/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/02/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
04/02/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/02/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/02/2025Maintenance informationSteven Bendoraitisenergy_progress
04/02/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
03/27/2025Tenant Protection Plan Compliance—special
03/27/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
03/27/2025Maintenance informationSteven Bendoraitisenergy_progress
03/27/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
03/27/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
Latest 25 of 29.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01002663-I1Request digital key ↗
08/25/2026B01002663-P1Request digital key ↗
08/25/2026B01002663-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B01002663-S2Open ↗
09/23/2026B01002663-S2Open ↗
09/23/2026B01002663-S2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01002663-S2Open ↗
09/23/2026B01002663-S2Open ↗
08/27/2026B01002663-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01002663-S2Open ↗
08/25/2026B01002663-S1Open ↗
08/13/2026B01002663-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B01002663-S2Open ↗
08/25/2026B01002663-S1Open ↗
08/13/2026B01002663-P1Open ↗
Showing 3 of 5 on file for this type