4 Open Violations ▸
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAGNUM REAL ESTATE GROUP208/29/2026
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871104/08/2026
NKM ENGINEERING PLLC6244203/12/2026
SEVERUD ASSOCIATES2224304/24/2025
PE AND CONSULTANTS NEW YO8161107/22/2024
LANGAN ENG, ENV, SURVEYIN1265102/26/2024
Building Lifecycle
All (152)Filed (36)Signed Off (16)Violation (8)Objection (62)Special Inspection (30)
08/05/2026
Signed off — Alteration
INSTALLATION OF 6000 LB SINGLE PERSONNEL/MATERIAL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01140002-I1
08/05/2026
Signed off — Alteration
M01137621-I1
08/04/2026
Signed off — Alteration
M01159560-I1
08/04/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01163108-I1
07/15/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
M01270455-I1
05/15/2026
Signed off — Alteration
Foundation work as per plans filed.
M00616140-I1
05/08/2026
Signed off — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BC
M01131633-I1
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
04/20/2026
Signed off — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BC
M00893003-I1
04/17/2026
Signed off — Alteration
Mechanical work as per plans filed.
M00601994-I1
04/17/2026
Signed off — Alteration
Install temporary dry standpipe system during construction as per plans filed. No change to use, egress or occupancy
M00616129-I1
04/14/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Cost
04/08/2026
Filed — Alteration
Plumbing work as per plans filed.
M00601892-P4
04/03/2026
Filed — Alteration
Install sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
M00602036-P3
04/03/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/03/2026
Special inspection requirement — Final
NARESH MAHANGU
04/03/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/01/2026
Objection resolved — Addressed
03/23/2026
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/23/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/20/2026
Objection raised — Admin
03/12/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
M01270455-P1
02/12/2026
Signed off — Alteration
FILING TO PROTECT NEIGHBOR DURING MINOR FACADE REPAIR WORK. THIS SYSTEM IS A SITE SPECIFIC ENGINEERED ENCLOSURE SYSTEM SUBJECT TO THE REQUIREMENTS OF BC 3309.17. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01193963-I1
02/12/2026
Signed off — Alteration
M01163112-I1
01/30/2026
Signed off — Alteration
Structural work as per plans filed
M00616318-I1
01/27/2026
Signed off — Alteration
M01075417-I1
01/20/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
01/20/2026
Special inspection requirement — Final
NARESH MAHANGU
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/08/2026
Signed off — Alteration
UNDERPINNING PLANS FOR ADJACENT PROPERTY UNDER BIN #1009134 IN CONJUNCTION WITH NB #121209165 AND SOE #M00616327-I1 FILINGS.
M00616327-I1
11/21/2025
Filed — Alteration
Plumbing work as per plans filed.
M00601892-P3
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Maintenance information
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Final
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
09/24/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Cost
09/16/2025
Filed — Alteration
Mechanical work as per plans filed.
M00601994-P2
09/11/2025
Filed — Alteration
Plumbing work as per plans filed.
M00601892-P2
09/11/2025
Filed — Alteration
Install sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
M00602036-P2
09/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/08/2025
Special inspection requirement — Maintenance information
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDTRIDENT RESTORATION INC12/14/2016
BISEQISSUEDBAY RESTORATION CORP05/20/2013
1 project · most recent 04/03/2026
FiledStatusContractorScope
04/03/2026Signed-offPARAMOUNT SERVICES, LLC1,204 heads, 3 outlets
2 projects · most recent 04/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/08/2026Signed-offEMERALD MECHL SOLUTIONS IGas, Storm, Water/Sanitary
04/03/2026———
9 projects · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
04/06/2026CompleteJAM ELECTRICAL CORP—
08/06/2025CompleteFSM ELECTRICAL CORPORATIO—
07/29/2025CompleteAMBER ELECTL CONTNG INC—
03/29/2025CompleteRICHARD NEU—
12/26/2024CompleteRICHARD NEU—
10/29/2024CompleteVERTEX ELECTRIC CORP.—
10/29/2024CompleteVERTEX ELECTRIC CORP.—
10/16/2024CompleteFSM ELECTRICAL CORPORATIO1 meters, 1 new_meters
2 projects · most recent 04/24/2025
FiledStatusContractorScope
04/24/2025Signed-offFIRST STANDARD CONSTR INC1 scope_items
02/26/2024Signed-offFIRST STANDARD CONSTR INC1 scope_items
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026Signed-offSEA BRIGHT SOLAR LLC40 panels, 17.6 kw, 419 roof_area_sqft
3 projects · most recent 04/26/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/26/2025Signed-offPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
11/13/2024Signed-offBAY RESTORATION CORPSidewalk Shed
06/20/2023Signed-offBAY RESTORATION CORPSidewalk Shed
1 project · most recent 04/24/2025
Earthwork
FiledStatusContractorScope
04/24/2025Signed-offFIRST STANDARD CONSTR INCEarthwork
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
05/04/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/03/2026FinalNARESH MAHANGUprogress
04/03/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/03/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/03/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/23/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/23/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/23/2026Standpipe SystemsRICHARD GREENWALDspecial
03/23/2026Sprinkler SystemsRICHARD GREENWALDspecial
01/20/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/20/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/20/2026FinalNARESH MAHANGUprogress
01/20/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
11/21/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/25/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
09/25/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/25/2025Shutoff dampersRICHARD GREENWALDenergy_progress
09/25/2025Maintenance informationRICHARD GREENWALDenergy_progress
09/25/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
09/25/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
09/25/2025Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
09/25/2025FinalRICHARD GREENWALDprogress
09/25/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/25/2025Mechanical SystemsRICHARD GREENWALDspecial
09/25/2025Heating SystemsRICHARD GREENWALDspecial
Latest 25 of 76.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
09/03/2026M00601994-P2Request digital key ↗
09/03/2026M00601994-P1Request digital key ↗
09/03/2026M00601994-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/30/2026M00893003-I1Open ↗
08/26/2026M01090314-I1Open ↗
08/26/2026M01089324-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/23/2026M00616129-I1Open ↗
08/31/2026M00601994-I1Open ↗
08/31/2026M00601994-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
08/31/2026M00601994-I1Open ↗
08/31/2026M00601994-I1Open ↗
08/31/2026M00601994-I1Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00601994-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026M01270455-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00616327-I1Open ↗