2 Active Violations 0 unresolved · 2 paperwork only▸
ECB10/03/2021Work w/out permit.as noted:at time of inspection observed at exp.#2 sideyard excavated are 5' deep at side perimeter of house w/out a current permit.*stop work order issued* call for retrospection.remedy:obtainNothing owed — awaiting certificate of correction
ECB07/12/2006Work w/o a permit.work noted:2ND fl totally gutted new wood studs erected to create separate rooms.all electrial & plumbing removed.no access to 1ST fl.basement also being gutted at time of inspection.Nothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
Whiteplains Bluestone
General Contractor
1
08/10/2006
Building Lifecycle
03/17/2023
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/04/2022
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
02/17/2022
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/03/2021
Work w/out permit.as noted:at time of inspection observed at exp.#2 sideyard excavated are 5' deep at side perimeter of house w/out a current…
ECB violation · open
04/02/2021
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account