← Back
Miscellaneous educational facility
825 STERLING PLACE
BROOKLYN · Crown Heights (North) · BIN 3031515
💬 Discuss this project
1960Year Built
2Stories
W9Building Class
R6AZoning
28,254 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous educational facility · Owner of record: LONG RIDGE ELECTRONICS INC · 14,905 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 4 filings · 20 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARAS PROPERTIES1807/08/2026
NYC SCHOOL CONSTRUCTION AUTHORITY507/08/2026
ARA PROPERTIES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SBLM803/21/2026
N N CONSULTANT203/21/2026
AK CONSULTING SERVICES203/21/2026
SALAMON ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEM-QUALITY CORPGeneral Contractor607/08/2026
SAFE WAY CONSTRUCTION CORGeneral Contractor303/21/2026
COIL TECHS HVAC SERVICESGeneral Contractor203/21/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317610/28/2025
SALAMON ENGINEERING PLLC1264107/08/2024
Building Lifecycle
All (62)Filed (11)Permit Issued (10)Signed Off (2)Violation (9)Inspection (2)Special Inspection (28)
02/04/2026
Violation issued (FDNY_NOV, closed)
01/20/2026
Permit issued — Construction Fence
B01111190-I1-FN
01/20/2026
Permit issued — General Construction
B00676422-I1-GC
12/22/2025
Violation issued (FDNY_ORDER, closed)
12/22/2025
Violation issued (FDNY_ORDER, closed)
12/22/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Permit issued — Plumbing
B00676433-I1-PL
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Air barrier - visual inspection
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Fenestration areas
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
10/28/2025
Filed — Alteration
B00676422-P2
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
10/23/2025
Filed — Alteration
FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE REPAIRS OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY AND USE.
B00676433-P2
09/25/2025
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Air barrier - visual inspection
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fenestration areas
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
09/22/2025
Signed off — Alteration
B01057781-I1
02/19/2025
Permit issued — General Construction
B00676422-I1-GC
02/19/2025
Permit issued — Construction Fence
B01111190-I1-FN
01/15/2025
Filed — Alteration
FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE REPAIRS OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY AND USE.
B00676433-P1
11/27/2024
Permit issued — General Construction
B01057781-I1-GC-CX
10/04/2024
Permit issued — Construction Fence
B01111190-I1-FN
09/24/2024
Filed — Alteration
B01111190-I1
08/22/2024
Permit issued — Plumbing
B00676433-I1-PL
08/15/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
07/09/2024
Permit issued — General Construction
B00676422-I1-GC
07/08/2024
Filed — Alteration
B01057781-I1
03/29/2024
Filed — Alteration
B00676422-P1
03/30/2023
Filed — Alteration
B00676422-I1
08/03/2022
Filed — Alteration
FILING HEREWITH FOR THE STRUCTURAL WORK RELATED TO THE ROOFTOP SHADE BEING INSTALLED. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
B00693169-I1
07/29/2022
Filed — Alteration
FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE REPAIRS OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY AND USE.
B00676433-I1
07/29/2022
Filed — Alteration
B00679859-I1
07/11/2022
Special inspection requirement — Structural Steel - Welding
07/11/2022
Special inspection requirement — Structural Steel - High Strength Bolting
07/11/2022
Special inspection requirement — Structural Steel - Details
03/07/2022
Special inspection requirement — Final
Evodia Ibrahim
12/03/2021
Signed off — Alteration
B00578768-I1
09/07/2021
Permit issued — General Construction
B00578768-I1-GC
08/19/2021
Filed — Alteration
B00578768-I1
03/09/2020
Violation issued (ECB, closed)
Construction
03/09/2020
Violation issued (ECB, closed)
Construction
09/07/2011
Violation issued (FDNY_NOV, closed)
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedGEM-QUALITY CORPORATION01/20/2026
DOB NOWGeneral ConstructionPermit IssuedGEM-QUALITY CORPORATION01/20/2026
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC11/06/2025
DOB NOWGeneral ConstructionPermit IssuedGEM-QUALITY CORPORATION02/19/2025
DOB NOWConstruction FencePermit IssuedGEM-QUALITY CORPORATION02/19/2025
DOB NOWGeneral ConstructionSigned-offCOIL TECHS HVAC SERVICES11/27/2024
DOB NOWConstruction FencePermit IssuedGEM-QUALITY CORPORATION10/04/2024
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC08/22/2024
DOB NOWGeneral ConstructionPermit IssuedGEM-QUALITY CORPORATION07/09/2024
DOB NOWGeneral ConstructionSigned-offSAFE WAY CONSTRUCTION COR09/07/2021
BISMHISSUEDSUPERIOR FIRE CONTROL INC08/10/2018
BISOTISSUEDN/A06/03/2016
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO., IN05/21/2001
BISMHISSUEDMAXAM CONSTRUCTION11/15/2000
BISOTISSUEDMAXAM CONSTRUCTION11/15/2000
1 project · most recent 10/23/2025
Water/Sanitary
FiledStatusContractorScope
10/23/2025Signed-offVARSITY PLBG AND HTG INCWater/Sanitary
1 project · most recent 08/14/2024
General Wiring
FiledStatusContractorScope
08/14/2024Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
1 project · most recent 08/03/2022
Steel
FiledStatusContractorScope
08/03/2022——Steel
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/04/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/29/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
10/29/2025Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
10/29/2025Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
10/29/2025Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
10/29/2025Fenestration areasMIKHAIL ZEYGMANenergy_progress
10/29/2025Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
10/29/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
10/29/2025FinalMIKHAIL ZEYGMANprogress
10/29/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
10/24/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
10/24/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
09/25/2025Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
09/25/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
09/25/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
09/25/2025FinalMIKHAIL ZEYGMANprogress
09/25/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
09/25/2025Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
09/25/2025Fenestration areasMIKHAIL ZEYGMANenergy_progress
09/25/2025Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
09/25/2025Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
09/25/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
09/25/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
08/15/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
08/15/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
07/11/2022Structural Steel - Welding—special
Latest 25 of 28.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00578768-I1Request digital key ↗
08/28/2026B00679859-I1Request digital key ↗
08/28/2026B00693169-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
08/10/2018321820561Open ↗
08/10/2018321820561Open ↗
06/06/2016321380420Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/08/2018321820561Open ↗
06/02/2016321380420Open ↗
05/19/2016321380420Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026B00676433-P2Open ↗
09/01/2026B00676422-P2Open ↗
09/01/2026B00676422-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00578768-I1Open ↗
08/24/2026B01057781-I1Open ↗
08/24/2026B01111190-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00676433-P2Open ↗
09/01/2026B00676422-P2Open ↗
08/27/2026B00676433-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/08/2018321820561Open ↗
06/06/2016321380420Open ↗
05/31/2016321380420Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/08/2018321820561Open ↗
06/02/2016321380420Open ↗
05/19/2016321380420Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/08/2018321820561Open ↗
05/19/2016321380420Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE PERMITS1
06/06/2016321380420Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/23/2018321820561Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/08/2018321820561Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/06/2016321380420Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00578768-I1Open ↗
08/20/2026B00676433-I1Open ↗
08/20/2026B00676433-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/08/2018321820561Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/08/2018321820561Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01057781-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/06/2016321380420Open ↗
05/31/2016321380420Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/20/2026B00676422-I1Open ↗
08/13/2026B00676433-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/08/2018321820561Open ↗
06/06/2016321380420Open ↗
05/19/2016321380420Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
08/09/2018321820561Open ↗
05/10/2016321380420Open ↗
▸BISADDITIONAL INFORMATION1
06/15/2016321380420Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00676433-P2Open ↗