Factory, heavy manufacturing, fireproof
814 RICHMOND TERRACE
STATEN ISLAND · St. George-New Brighton · BIN 5001742
💬 Discuss this project
1931Year Built
1Stories
F1Building Class
M1-1Zoning
12,244 sfGross Floor Area
2Units
7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: VG 814 RICHMOND TERRACE, LLC · 13,325 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction42p · 6 filings · 20 docs
Floor 1Under Construction51p · 10 filings · 20 docs
MezzanineUnder Construction29p · 4 filings · 20 docs
Cellar25p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAROB HOLDING303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE2404/24/2026
POLY ENGINEER PC108/11/2024
OLD STRUCTURES ENGINEERING311/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE1103/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JVN RESTORATION ENVIRONMENTALGeneral Contractor1407/08/2026
RICHMOND PLBG & HTG CO INPlumbing607/08/2026
SCARAN OIL SERVICE INCGeneral Contractor407/08/2026
RICHMOND P & H CO, INCFire Protection106/28/2026
CT IDEAL SUPPRESSIONGeneral Contractor109/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P67381004/24/2026
THINK DESIGN ARCHITECTURA6831005/08/2025
Building Lifecycle
All (122)Filed (28)Permit Issued (21)Signed Off (9)Violation (15)Inspection (7)Objection (12)Special Inspection (30)
09/25/2026
Permit issued — Mechanical Systems
S01070879-I1-MS
06/11/2026
Permit issued — Sprinklers
S01355256-I1-PL
06/11/2026
Permit issued — Plumbing
S01355256-I1-EW-SP
04/24/2026
Filed — Alteration
Application is filed solely for the installation of a sprinkler line between the drinking and eating establishment and the brewery from the exist domestic feed as per the plan filed herewith. No change of use filed under this application.
S01355256-I1
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
03/23/2026
Objection raised — Fire_Protection
03/23/2026
Objection raised — Plumbing
03/23/2026
Objection raised — Fire_Protection
03/23/2026
Objection raised — Admin
03/23/2026
Objection raised — Zoning
03/23/2026
Objection raised — Electrical
03/03/2026
Signed off — Alteration
APPLICATION IS FILED FOR REMOVAL OF EXISTING ROOF SHEATING AND ROOF MEMBRANE. MINOR NEW WORK TO REPLACE DAMAGED CEILING JOISTS ONLY AS REQUIRED.
S00456648-I1
02/25/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE SUPPORT FOR THE CEILINGS PRE-FAB COLD-STORAGE ROOM. CREATION OF MECHANICAL MEZZANINE AND DUNNAGE STRUCTURE, SUPPORTED INDENPENDENTLY OF THE ROOF STRUCTURE. REPAIRS TO THE STRUCTURAL STEEL OF STREET FACADES.
S00542389-I1
02/25/2026
Filed — No Work
S01355073-I1
02/25/2026
Signed off — Alteration
REPAIR TO THE WOOD BOWSTRINGS-TRUSS ROOF STRUCTURE.
S00563863-I1
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/04/2026
Special inspection requirement — Sprinkler Systems
anthony santoro
02/03/2026
Special inspection requirement — Public Assembly Emergency Lighting
anthony santoro
01/12/2026
Signed off — Alteration
APPLICATION FILED FOR THE PLUMBING WORK ONLY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00610001-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
05/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
05/08/2025
Filed — Alteration
APPLICATION FILED FOR THE PLUMBING WORK ONLY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00610001-A1
05/08/2025
Permit issued — Plumbing
S00610001-I1-PL
05/07/2025
Signed off — Alteration
APPLICATION IS FILED SOLELY FOR THE INSTALLATION OF (1) NEW COMMERCIAL BOILER ASSOCIATED WITH INTERIOR ALTERATION APPLICATION TO CONVERT EXIST USE TO BREWERY. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APP
S00804008-I1
05/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
04/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/28/2025
Special inspection requirement — Fenestration areas
anthony santoro
04/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/28/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
04/28/2025
Special inspection requirement — Mechanical Systems
anthony santoro
04/28/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
04/28/2025
Special inspection requirement — Shutoff dampers
anthony santoro
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/28/2025
Special inspection requirement — Final
anthony santoro
04/28/2025
Special inspection requirement — Fenestration areas
anthony santoro
04/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/28/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/28/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
04/28/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
04/28/2025
Special inspection requirement — Final
anthony santoro
04/28/2025
Special inspection requirement — Permanent certificate
anthony santoro
04/27/2025
Filed — Alteration
APPLICATION FILED FOR THE PLUMBING WORK ONLY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00610001-P9
04/25/2025
Filed — Alteration
APPLICATION IS FILED FOR INTERIOR PARTITIONS, FINISHES, FIXTURES, ETC. AND NEW HVAC SYSTEMS ASSOCIATED WITH ALTERATION CO #S00708595-I1 AND PLUMBING # S00610001-I1.
S08002152-P1
04/25/2025
Filed — Alteration
APPLICATION IS FILED FOR REMOVAL OF EXISTING ROOF SHEATING AND ROOF MEMBRANE. MINOR NEW WORK TO REPLACE DAMAGED CEILING JOISTS ONLY AS REQUIRED.
S00456648-P1
04/18/2025
Signed off — Alteration
APPLICATION IS FILED FOR NEW 15' WIDE CURB CUT ALONG RICHMOND TERRACE. FILED IN CONJUNCTION WITH BPP APPLICATION # 540238802.
S08021087-I1
04/18/2025
Signed off — Alteration
APPLICATION IS FILED FOR EXISTING 13.0' WIDE CURB CUT ALONG TYSEN STREET. FILED IN CONJUNCTION WITH BPP APPLICATION #540238802 .
S08021089-I1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCT IDEAL SUPPRESSION09/25/2026
DOB NOWSprinklersPermit IssuedRICHMOND PLBG & HTG CO IN06/11/2026
DOB NOWPlumbingPermit IssuedRICHMOND P & H CO, INC06/11/2026
DOB NOWPlumbingSigned-offRICHMOND PLBG & HTG CO IN05/08/2025
DOB NOWCurb CutSigned-offJVN RESTORATION ENVIRONME04/08/2025
DOB NOWCurb CutSigned-offJVN RESTORATION ENVIRONME04/08/2025
DOB NOWCurb CutSigned-offJVN RESTORATION ENVIRONME04/08/2025
DOB NOWMechanical SystemsPermit IssuedSCARAN OIL SERVICE INC01/28/2025
DOB NOWGeneral ConstructionPermit IssuedJVN RESTORATION ENVIRONME06/12/2024
DOB NOWConstruction FenceSigned-offJVN RESTORATION ENVIRONME06/11/2024
DOB NOWMechanical SystemsPermit IssuedSCARAN OIL SERVICE INC05/10/2024
DOB NOWPlumbingSigned-offRICHMOND PLBG & HTG CO IN04/30/2024
DOB NOWBoiler EquipmentSigned-offRICHMOND PLBG & HTG CO IN02/14/2023
DOB NOWGeneral ConstructionPermit IssuedSCARAN OIL SERVICE INC01/19/2023
DOB NOWConstruction FenceSigned-offJVN RESTORATION ENVIRONME09/01/2022
DOB NOWPlumbingSigned-offRICHMOND PLBG & HTG CO IN05/18/2022
DOB NOWPlumbingSigned-offRICHMOND PLBG & HTG CO IN12/10/2021
DOB NOWGeneral ConstructionSigned-offJVN RESTORATION ENVIRONME12/08/2021
DOB NOWGeneral ConstructionSigned-offJVN RESTORATION ENVIRONME12/08/2021
DOB NOWGeneral ConstructionSigned-offJVN RESTORATION ENVIRONME11/23/2021
DOB NOWConstruction FenceSigned-offJVN RESTORATION ENVIRONME11/16/2021
BISPLISSUEDSCARAN PLUMBING INC02/27/2004
BISMHISSUEDF & T SERVICE COMPANY, LLC02/27/2004
1 project · most recent 04/25/2025
Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
04/25/2025Permit IssuedSCARAN OIL SERVICE INCHeating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
— BDP 150 2,778 CFM · Fan Coil Indoor ×4
BDP 250 4,630 CFM · Fan Coil Indoor ×2
Carrier 48HCED11A2A 10 tons · Rooftop Unit ×4
Hussmann HDSZ0400MTKDED 3 kW · Condensing Unit ×4
Refrigeration
International Comfort Products CAS181HAA0A 15 tons · Chiller ×2
1 project · most recent 04/24/2026
FiledStatusContractorScope
04/24/2026Permit IssuedRICHMOND P & H CO, INC20 heads
1 project · most recent 04/24/2026
Water/Sanitary
FiledStatusContractorScope
04/24/2026Permit IssuedRICHMOND PLBG & HTG CO INWater/Sanitary
1 project · most recent 06/06/2023
General Wiring
FiledStatusContractorScope
06/06/2023CompleteHIGH BEAM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/16/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/23/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
02/04/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
02/04/2026Sprinkler Systemsanthony santorospecial
02/03/2026Public Assembly Emergency Lightinganthony santoroprogress
05/12/2025HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
05/12/2025HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/12/2025Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
05/12/2025Energy Code Compliance InspectionsFrank Martarella IIIprogress
05/06/2025HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
05/06/2025HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
05/06/2025Energy Code Compliance InspectionsFrank Martarella IIIprogress
04/28/2025Fenestration areasanthony santoroenergy_progress
04/28/2025Finalanthony santoroprogress
04/28/2025Insulation placement and R valuesanthony santoroenergy_progress
04/28/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/28/2025Mechanical Systemsanthony santorospecial
04/28/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
04/28/2025Fire-Resistance Rated Constructionanthony santoroprogress
04/28/2025Finalanthony santoroprogress
04/28/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/28/2025Energy Code Compliance Inspectionsanthony santoroprogress
04/28/2025Fenestration areasanthony santoroenergy_progress
04/28/2025Permanent certificateanthony santoroenergy_progress
04/28/2025Insulation placement and R valuesanthony santoroenergy_progress
04/28/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
Latest 25 of 114.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch23
08/26/2026S01355256-I1Request digital key ↗
08/25/2026S00563863-I1Request digital key ↗
08/25/2026S00542389-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/21/2026S00456599-I1Request digital key ↗
08/21/2026S00456599-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026S01355073-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026S00456648-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
12/06/2022540238802Open ↗
02/11/2020500421046Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/16/2023540238802Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00708595-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00708595-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00708595-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature28
09/29/2026S00456648-I1Open ↗
09/29/2026S00456648-I1Open ↗
09/29/2026S00456648-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026S01355256-I1Open ↗
08/25/2026S00456648-I1Open ↗
08/25/2026S00542389-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/16/2026S00804008-I1Open ↗
09/02/2026S00610001-P6Open ↗
09/01/2026S00610001-P7Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/06/2022540238802Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/06/2022540238802Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00708595-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
04/23/2024540238802Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00708595-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/25/2026S00456648-I1Open ↗
08/25/2026S00542389-I1Open ↗
08/24/2026S00708595-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026S01070879-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00456648-I1Open ↗
08/13/2026S00542389-I1Open ↗
08/13/2026S00610001-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00804008-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/06/2022540238802Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/11/2020500421046Open ↗
02/11/2020500421046Open ↗
▸BISLetter from Homeowner for Withdrawal1
02/11/2020500421046Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
04/25/2024540238802Open ↗
▸BISBOROUGH INTAKE FORM1
02/11/2020500421046Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/06/2022540238802Open ↗
▸Other Documents7
▸BISBPP - SUPPORTING DOCUMENTATION3
04/23/2024540238802Open ↗
04/23/2024540238802Open ↗
12/06/2022540238802Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/25/2024540238802Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S00708595-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00708595-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026S00708595-I1Open ↗