← Back
Predominantly retail with other uses
814 WESTCHESTER AVENUE
BRONX · BIN 2004992
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R6Zoning
55,500 sfGross Floor Area
19Units
LL97 Covered20 Open Violations 16 unresolved · 4 paperwork only ▸
Predominantly retail with other uses · Owner of record: WESTCHESTER PLAZA LLC · 29,955 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTECHESTER PLAZA LLC5403/22/2026
ESBEL RLTY CORP503/22/2026
PLAZA HOMES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ORPHEUS ASSOCIATES107/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EB STUDIO EXP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.L.G. PLBG & HTG INCPlumbing303/22/2026
KONSTANTINOS KOSTARIDISElectrical103/21/2026
MARTINEZ ELECTRICAL CONTElectrical103/22/2026
CARLTON ASPINALLElectrical103/21/2026
WOJCIECH RZESZUTKOElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
SCOTT HOERTERElectrical103/21/2026
Building Lifecycle
All (74)Filed (1)Violation (55)Objection (8)Special Inspection (10)
01/13/2025
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
11/29/2024
Objection raised — Other
11/06/2024
Objection resolved — Addressed
09/09/2024
Objection raised — Admin
08/01/2024
Objection resolved — Addressed
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Admin
07/08/2024
Filed — Alteration
Interior renovation for existing store use group 6 to propose a covered area for the existing store, including painting and finishing the floor and ceiling, mechanical system for cooking equipment ventilation and refrigeration system. plumbing work to fil
X01045200-I1
05/02/2024
Special inspection requirement — Mechanical Systems
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/02/2024
Special inspection requirement — Structural Steel - Details
05/02/2024
Special inspection requirement — Structural Steel - High Strength Bolting
05/02/2024
Special inspection requirement — Final
05/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
05/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
05/02/2024
Special inspection requirement — Lighting controls
05/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
05/02/2024
Special inspection requirement — Insulation placement and R values
05/15/2020
Violation issued (ECB, open)
Construction
01/03/2020
Violation issued (ECB, open)
Construction
01/03/2020
Violation issued (ECB, open)
Construction
12/28/2019
Violation issued (ECB, open)
Construction
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2018
Violation issued (ECB, closed)
Construction
02/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2012
Violation issued (ECB, closed)
Construction
09/05/2012
Violation issued (ECB, closed)
Construction
08/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2012
Violation issued (ECB, closed)
Construction
05/09/2012
Violation issued (ECB, open)
Unknown
05/09/2012
Violation issued (ECB, closed)
Construction
05/07/2012
Violation issued (ECB, open)
Construction
05/07/2012
Violation issued (ECB, open)
Construction
05/03/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2011
Violation issued (ECB, closed)
Construction
02/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2010
Violation issued (ECB, closed)
Construction
11/30/2010
Violation issued (ECB, closed)
Unknown
11/19/2010
Violation issued (ECB, open)
Construction
11/09/2010
Violation issued (ECB, closed)
Construction
09/13/2010
Violation issued (ECB, closed)
Construction
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDL.L.G. PLBG & HTG INC03/22/2016
BISPLISSUEDL.L.G. PLBG & HTG INC03/22/2016
BISPLISSUEDPRECISION PLBG SVCS., INC05/01/2015
BISMHISSUEDCORREA GENERAL CONSTRUCTI04/30/2015
BISFPISSUEDMASTER FIRE SYSTEMS, INC01/22/2015
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/31/2014
BISOTISSUEDPRECISION PLUMBING SERVIC10/07/2014
BISPLISSUEDPRECISION PLBG SVCS., INC10/07/2014
BISOTISSUEDCGM MANAGEMENT GROUP INC06/16/2014
BISMHISSUEDMRMD NY CORP08/21/2013
BISOTISSUEDVAN NEST CONSTRUCTION01/15/2013
BISPLISSUEDQBK PLUMBING & HTNG INC12/20/2010
BISPLISSUEDQBK PLUMBING & HTNG INC10/02/2008
BISPLISSUEDBETA PLUMBING & HEATING INC08/08/2008
BISEQISSUEDSHELTECH CONSTRUCTION,LLC05/22/2008
BISEQISSUEDSHELTECH CONSTRUCTION LLC12/17/2007
BISOTISSUEDFPS GROUP CORP07/08/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC09/30/2004
BISBLISSUEDC.R.U. MECHAN & HEAT INC01/29/2003
BISFPISSUEDNEW YORK BUISNEES_FIRE SYSTEM11/25/2002
BISMHISSUEDCRU MECHANICAL AND HEATING08/27/2002
BISPLISSUEDC.R.U. MECHAN & HEAT INC08/27/2002
BISOTISSUEDWON CONSTRUCTION INC.08/26/2002
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/07/2001
BISEQISSUEDMEDITERRANEAN CONSTRUCTION CORP07/20/2001
BISOTISSUEDMEDITERRANEAN CONSTRUCTION CORP07/20/2001
BISPLISSUEDBEST PLUMBING & HVAC INC05/29/2001
BISOTISSUEDMASTER FIRE PREVENTION SYSTEMS05/21/2001
BISPLISSUEDTHEODORE WAGNER PLG & HTG CORP02/08/2001
BISPLISSUEDTHEODORE WAGNER PLG. & HTG. CORP12/19/2000
BISPLISSUEDTHEODORE WAGNER PLG. & HTG. CORP09/22/2000
BISMHISSUEDTHEODORE WAGNER PLG. & HTG. CORP09/22/2000
BISOTISSUEDMEDITERRANEAN CONSTRUCTION CORP10/19/1999
1 project · most recent 07/08/2024
Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2024——Heating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
York MODEL:ZF120N20N2AAA5A MODEL:ZF150N20N2AAA6 240,000 BTU ×2
Refrigeration
Krack LAVC-14410KA CPC1 NCA4111 TRSS 20 tons · Refrigeration Unit ×1
4 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025Permit IssuedINFINITY ELECTRIC, INCGeneral Wiring
02/21/2024Permit IssuedKGB ELEC'L CONTR'G CORPGeneral Wiring
09/18/2022CompleteKGB ELEC'L CONTR'G CORPGeneral Wiring
05/27/2020CompleteMARTINEZ ELECTRICAL CONT—
1 project · most recent 07/08/2024
Steel
FiledStatusContractorScope
07/08/2024——Steel
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/02/2024Mechanical Systems—special
05/02/2024Fire-Resistant Penetrations and Joints—special
05/02/2024Structural Steel - Details—special
05/02/2024Structural Steel - High Strength Bolting—special
05/02/2024Final—progress
05/02/2024HVAC-R and service water heating equipment—energy_progress
05/02/2024HVAC-R and service water heating system controls—energy_progress
05/02/2024Lighting controls—energy_progress
05/02/2024HVAC-R and service water piping design and insulation—energy_progress
05/02/2024Insulation placement and R values—energy_progress
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01045200-I1Request digital key ↗
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION18
05/04/2015220453293Open ↗
04/30/2015220453293Open ↗
01/23/2015220421620Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
07/20/2015220425010Open ↗
06/02/2015220453293Open ↗
05/27/2015220453293Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01045200-I1Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
04/27/2015220453293Open ↗
01/28/2015220425010Open ↗
01/13/2015220421620Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/27/2015220453293Open ↗
12/30/2014220421620Open ↗
10/11/2014220409939Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/27/2015220453293Open ↗
12/30/2014220421620Open ↗
10/11/2014220409939Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/13/2008210049543Open ↗
12/04/2007210024846Open ↗
11/14/2007210011486Open ↗
▸BISPC FULL REPORT2
12/04/2007210024846Open ↗
11/14/2007210011486Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026X01045200-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE7
06/22/2015220453293Open ↗
06/19/2015220453293Open ↗
06/08/2015220453293Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/02/2015220453293Open ↗
05/27/2015220453293Open ↗
04/27/2015220453293Open ↗
▸BISSCHEDULE B - PLUMBING1
10/19/2009220032765Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/08/2015220453293Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01045200-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
04/27/2015220453293Open ↗
10/11/2014220409939Open ↗
08/06/2013220284715Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/19/2009220032765Open ↗
03/17/2008210033033Open ↗
11/14/2007210011486Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/13/2008210049543Open ↗
12/04/2007210024846Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X01045200-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/27/2015220453293Open ↗
08/06/2013220284715Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/24/2014220384484Open ↗
▸Approvals, Objections & Sign-offs18
▸BISADMINISTRATIVE OBJECTIONS9
08/06/2013220284715Open ↗
10/04/2012220229713Open ↗
09/28/2012220231611Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/16/2015220032765Open ↗
10/30/2014210033033Open ↗
10/27/2014220229713Open ↗
Showing 3 of 9 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
12/16/2015220032765Open ↗
04/27/2015220453293Open ↗
01/28/2015220425010Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET10
04/27/2015220453293Open ↗
01/28/2015220425010Open ↗
12/30/2014220421620Open ↗
Showing 3 of 10 on file for this type
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01045200-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X01045200-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01045200-I1Open ↗