← Back
Office with commercial, 1-6 stories
815 BROADWAY
BROOKLYN · BIN 3071688
💬 Discuss this project
1926Year Built
5Stories
O5Building Class
C4-3Zoning
49,500 sfGross Floor Area
18Units
LL97 Covered8 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 815 BROADWAY EQUITIES LLC · 8,580 sf lot · 5.77 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof4p · 3 filings · 20 docs
Floor 52p · 2 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Mezzanine9p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Sub-Cellar13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
815 BROADWAY EQUITIES1803/22/2026
815 BROADWAY2703/22/2026
815 BROADWAY REALTY603/22/2026
BERGENLINE CORP303/22/2026
GILBANE103/22/2026
825 BROADWAY REALTY103/21/2026
MSK REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACOB FEINBERG KATZ & MICHAELI CONS1905/24/2021
LEON SKVIRSKY PE302/16/2021
SAFWAY ATLANTIC LLC106/17/2020
KZ ENGINEERING, P.C106/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS603/21/2026
NERIS3803/21/2026
A1 EXPEDITING SERVICE203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIRINA FIRE PROTPlumbing803/22/2026
ACTIVE SIGNSScaffold307/08/2026
GILBANE BUILDING COMPANYGeneral Contractor307/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor307/08/2026
UNITY ELECTRIC CO INC 001463General Contractor203/22/2026
CARDOZA PLUMBING CORPPlumbing207/08/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061905/24/2021
Building Lifecycle
All (153)Filed (24)Permit Issued (13)Signed Off (10)Violation (60)Objection (16)Special Inspection (30)
09/17/2025
Violation issued (FDNY_NOV, closed)
05/30/2024
Violation issued (ECB, open)
Construction
11/20/2023
Violation issued (FDNY_NOV, closed)
09/13/2023
Violation issued (FDNY_NOV, closed)
08/15/2023
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/15/2023
Violation issued (FDNY_NOV, closed)
11/23/2022
Violation issued (FDNY_NOV, closed)
09/04/2022
Violation issued (FDNY_NOV, closed)
03/09/2022
Signed off — Alteration
B00358580-I1
01/07/2022
Violation issued (FDNY_NOV, closed)
11/09/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2021
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN (NYC Health+Hospitals Gotham Health Broadway)
B00455856-I1
09/02/2021
Signed off — Alteration
B00455857-I1
09/02/2021
Signed off — Alteration
B00455858-I1
08/29/2021
Violation issued (FDNY_NOV, closed)
08/08/2021
Violation issued (FDNY_NOV, closed)
06/30/2021
Signed off — Alteration
Mechanical systems work for new long-term coronavirus medical facility including new roof-top units (RTUs), unit heaters (CUHs), exhaust fans (EFs), HVAC ductwork, smoke purge systems, fuel oil connections to roof mounted generator & DX hot water units.
B00348071-I1
06/21/2021
Signed off — Alteration
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005.
B00348076-I1
06/04/2021
Signed off — Alteration
INSTALLATION OF A EMERGENCY GENERATOR on roof associated fuel oil storage and piping to be filed separately.
B00354296-I1
05/24/2021
Filed — Alteration
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005.
B00348076-P7
05/14/2021
Special inspection requirement — Fire-Resistance Rated Construction
EDUARDO LIEVANO
05/14/2021
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
05/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
05/07/2021
Filed — Alteration
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005.
B00348076-P6
05/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
05/04/2021
Special inspection requirement — Fire-Resistance Rated Construction
EDUARDO LIEVANO
05/04/2021
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
04/14/2021
Signed off — Alteration
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof
B00353915-I1
04/13/2021
Special inspection requirement — Fire-Resistance Rated Construction
EDUARDO LIEVANO
04/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
04/06/2021
Filed — Alteration
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005.
B00348076-P5
04/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
04/05/2021
Special inspection requirement — Fire-Resistance Rated Construction
EDUARDO LIEVANO
04/05/2021
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
03/30/2021
Violation issued (ECB, closed)
Elevators
03/26/2021
Filed — Alteration
Installation of new Medical Gas system including oxygen and vacuum with associated piping from cellar to 5th and roof
B00353915-P4
03/26/2021
Permit issued — Mechanical Systems
B00354296-I1-MS
03/24/2021
Special inspection requirement — Fire-Resistance Rated Construction
EDUARDO LIEVANO
03/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
03/11/2021
Permit issued — Sign
B00455856-I1-SG
03/11/2021
Permit issued — Sign
B00455858-I1-SG
03/11/2021
Permit issued — Sign
B00455857-I1-SG
03/04/2021
Objection resolved — Addressed
03/04/2021
Objection resolved — Addressed
03/02/2021
Objection raised — Scope
03/02/2021
Objection raised — Scope
02/25/2021
Signed off — Alteration
B00354316-I1
02/25/2021
Filed — Alteration
Installation of new water lines, waste lines, vent lines and piping with plumbing fixtures for new plumbing installation and installation of new sprinkler piping and heads for modification to the existing system on Floors, Cellar, 001, 002-005.
B00348076-P3
02/17/2021
Special inspection requirement — Final
EDUARDO LIEVANO
02/17/2021
Special inspection requirement — Energy Code Compliance Inspections
EDUARDO LIEVANO
02/17/2021
Special inspection requirement — Mechanical Systems
EDUARDO LIEVANO
02/16/2021
Filed — Alteration
INSTALL ILLUMINATED WALL SIGN (NYC Health+Hospitals Gotham Health Broadway)
B00455856-I1
02/16/2021
Filed — Alteration
B00455857-I1
02/16/2021
Filed — Alteration
B00455858-I1
02/16/2021
Special inspection requirement — Final
LEON SKVIRSKY
02/12/2021
Objection resolved — Addressed
02/12/2021
Objection resolved — Addressed
02/09/2021
Objection raised — Scope
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY03/26/2021
DOB NOWSignSigned-offACTIVE SIGNS INC03/11/2021
DOB NOWSignSigned-offACTIVE SIGNS INC03/11/2021
DOB NOWSignSigned-offACTIVE SIGNS INC03/11/2021
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC12/24/2020
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/22/2020
DOB NOWBoiler EquipmentSigned-offAGEE HEATING SVC CORP09/15/2020
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP09/02/2020
DOB NOWSprinklersSigned-offCARDOZA PLUMBING CORP06/22/2020
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/22/2020
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP06/20/2020
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC06/17/2020
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/09/2018
BISOTISSUEDGILBANE BUILDING COMPANY11/13/2020
BISOTISSUEDGILBANE BUILDING COMPANY06/24/2020
BISOTISSUEDGILBANE BUILDING COMPANY05/22/2020
BISOTISSUEDGLOBAL HOME IMPROVEMENTS07/11/2018
BISEQISSUEDBILLY ENTERPRISES INC11/06/2017
BISEQISSUEDBILLY ENTERPRISES INC10/30/2017
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS10/03/2017
BISPLISSUEDPREMIER SEWER & WATERMAIN LLC,12/01/2016
BISEQISSUEDGLOBAL HOME IMPROVEMENTS11/16/2016
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS10/28/2016
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS10/10/2016
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS06/01/2016
BISEQISSUEDGLOBAL HOME IMPROVEMENTS05/12/2016
BISEQISSUEDBILLY ENTERPRISES INC04/01/2016
BISEQISSUEDBILLY ENTERPRISES INC03/31/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/22/2015
BISOTISSUEDGLOBAL HOME IMPROVEMENTS11/24/2015
BISPLISSUEDS. WACHTEL PLBG & HTG INC10/27/2015
BISOTISSUEDGLOBAL HOME IMPROVEMENTS10/16/2015
BISOTISSUEDZ & J MANAGEMENT LLC06/03/2011
BISOTISSUEDWIRELESS SITES DEVELOPMENT NEW05/21/2010
BIS—ISSUEDMODERN BUILDERS&CONTRACTO02/06/2009
BISPLISSUEDZARA PLUMBING CORP08/28/2008
BISPLISSUEDCALA/SACCO MECHANICAL, INC06/25/2008
BIS—ISSUEDMODERN BUILDERS & CONTRACTORS IN06/25/2008
BISPLISSUEDDOVAL PLBG & HTG CORP08/21/2007
BISOTISSUEDNEW YORK PRESCO INC06/14/2007
+ 6 more permits on file
6 projects · most recent 06/22/2021
General Wiring
FiledStatusContractorScope
06/22/2021CompleteUNITY ELECTRIC CO INCGeneral Wiring
02/16/2021CompleteRAINBOW ELECTRIC CO., INC—
02/16/2021CompleteRAINBOW ELECTRIC CO., INC—
02/16/2021CompleteRAINBOW ELECTRIC CO., INC—
05/21/2020CompleteUNITY ELECTRIC CO INC—
05/21/2020CompleteUNITY ELECTRIC CO INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
05/14/2021Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
05/14/2021Fire-Resistance Rated ConstructionEDUARDO LIEVANOprogress
05/14/2021Sprinkler SystemsEDUARDO LIEVANOspecial
05/04/2021Fire-Resistance Rated ConstructionEDUARDO LIEVANOprogress
05/04/2021Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
05/04/2021Sprinkler SystemsEDUARDO LIEVANOspecial
04/13/2021Fire-Resistance Rated ConstructionEDUARDO LIEVANOprogress
04/13/2021Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
04/05/2021Fire-Resistance Rated ConstructionEDUARDO LIEVANOprogress
04/05/2021Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
04/05/2021Sprinkler SystemsEDUARDO LIEVANOspecial
03/24/2021Fire-Resistance Rated ConstructionEDUARDO LIEVANOprogress
03/24/2021Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
02/17/2021FinalEDUARDO LIEVANOprogress
02/17/2021Mechanical SystemsEDUARDO LIEVANOspecial
02/17/2021Energy Code Compliance InspectionsEDUARDO LIEVANOprogress
02/16/2021FinalLEON SKVIRSKYprogress
02/08/2021Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
02/08/2021Sprinkler SystemsGEORGE GHEBRYALspecial
02/08/2021Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/02/2021FinalGEORGE GHEBRYALprogress
02/02/2021Mechanical SystemsGEORGE GHEBRYALspecial
02/02/2021Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/06/2021Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
01/06/2021Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
Latest 25 of 79.
▾Documents — 612 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch - Plumbing12
09/02/2026B00348076-I1Request digital key ↗
09/02/2026B00348076-P5Request digital key ↗
09/02/2026B00348076-P7Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/02/2026B00348076-P7Request digital key ↗
09/02/2026B00348076-I1Request digital key ↗
09/02/2026B00348076-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/02/2026B00348071-I1Request digital key ↗
09/02/2026B00354296-I1Request digital key ↗
08/15/2026B00354296-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/01/2026B00455856-I1Request digital key ↗
09/01/2026B00455858-I1Request digital key ↗
09/01/2026B00455857-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00358580-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/03/2026B00050240-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00354316-I1Request digital key ↗
▸Applications & Permits108
▸BISPLAN / WORK APPROVAL APPLICATION74
12/15/2020340727930Open ↗
12/07/2020340727930Open ↗
10/14/2020340738045Open ↗
Showing 3 of 74 on file for this type
▸BISWORK PERMIT APPLICATION18
11/13/2020340738045Open ↗
05/22/2020340727930Open ↗
07/12/2018321798541Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
06/13/2019320025799Open ↗
11/08/2018321155600Open ↗
09/04/2018321286639Open ↗
Showing 3 of 9 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1136
12/16/2019320025799Open ↗
01/24/2018301127091Open ↗
12/19/2017301154104Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
08/08/2018321286639Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT II- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications169
▸DOB NOWProgress Inspector Seal & Signature54
09/25/2026B00353915-P4Open ↗
09/23/2026B00348071-P3Open ↗
09/23/2026B00348071-P3Open ↗
Showing 3 of 54 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION42
01/31/2019321155600Open ↗
01/31/2019321155600Open ↗
01/31/2019321155600Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/25/2026B00353915-P4Open ↗
09/23/2026B00348071-P3Open ↗
09/23/2026B00348071-P3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026B00050240-I1Open ↗
09/01/2026B00455856-I1Open ↗
09/01/2026B00455858-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
07/12/2018321798541Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/12/2018321798541Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/25/2020340738045Open ↗
05/10/2020340727930Open ↗
▸Trade Schedules & Equipment28
▸DOB NOWFDNY: Letter of No Objection12
08/13/2026B00353915-P2Open ↗
08/13/2026B00353915-P3Open ↗
08/13/2026B00353915-P4Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
10/03/2018321155600Open ↗
06/20/2018321368257Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/10/2018321286639Open ↗
09/10/2018321286639Open ↗
▸BISEQUIPMENT USE PERMITS1
09/10/2018321286639Open ↗
▸Safety & Tenant Protection10
▸BISTENANT PROTECTION PLAN AND NOTES4
06/25/2020340738045Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/13/2026B00354296-I1Open ↗
08/13/2026B00353915-I1Open ↗
08/13/2026B00348076-P1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/05/2020340738045Open ↗
09/23/2020340738045Open ↗
Showing 2 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
03/04/2021340727930Open ↗
12/15/2020340727930Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
03/04/2021340727930Open ↗
09/16/2020340727930Open ↗
08/25/2020340727930Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/15/2019321155600Open ↗
10/03/2018321155600Open ↗
07/12/2018321798541Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/04/2021340727930Open ↗
01/31/2019321155600Open ↗
01/15/2019321155600Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00348071-I1Open ↗
08/13/2026B00354296-I1Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/04/2021340727930Open ↗
11/05/2020340738045Open ↗
11/05/2020340738045Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
11/09/2020340738045Open ↗
11/09/2020340738045Open ↗
11/05/2020340738045Open ↗
Showing 3 of 8 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/14/2020340738045Open ↗
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/13/2026B00354296-P1Open ↗
08/13/2026B00353915-P1Open ↗
08/13/2026B00348076-P7Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
01/31/2019321155600Open ↗
01/15/2019321155600Open ↗
10/22/2018321286639Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
05/22/2020340727930Open ↗
05/22/2020340727930Open ↗
10/22/2018321286639Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
10/14/2020340738045Open ↗
05/11/2020340727930Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
03/12/2021340727930Open ↗
02/23/2021340738045Open ↗
02/19/2021340738045Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms84
▸BISBOROUGH INTAKE FORM42
12/16/2019320025799Open ↗
01/31/2019321155600Open ↗
01/15/2019321155600Open ↗
Showing 3 of 42 on file for this type
▸BISADDITIONAL INFORMATION22
12/15/2020340727930Open ↗
12/10/2020340727930Open ↗
12/07/2020340727930Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET12
11/05/2020340738045Open ↗
07/12/2018321798541Open ↗
Showing 2 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
06/25/2020340738045Open ↗
05/10/2020340727930Open ↗
Showing 2 of 8 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM2
08/08/2018321286639Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: DEED1
01/05/2018301027341Open ↗