← Back
BuildNYC
Three families
815 WOODWARD AVENUE
QUEENS · Ridgewood · BIN 4083352
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,105 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · 2,000 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 39p · 2 filings · 12 docs
Floor 28p · 2 filings · 12 docs
Floor 110p · 2 filings · 12 docs
Cellar8p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/22/2021$1.4M—Private party → Private party$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Flushing404/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
Building Lifecycle
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/12/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/16/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/27/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
09/19/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILER SAND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00646095-I1
26 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing12/28/2021
DOB NOWGeneral ConstructionSigned-offSplen Construction12/27/2021
1 project · most recent 12/28/2021
General Wiring
FiledStatusContractorScope
12/28/2021CompleteR & T ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/03/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account