Elevator apt, fireproof with stores
The 816 58th Street Condominium
816 58 STREET · BIN 3428882
💬 Discuss this project
2021Year Built
8Stories
D6Building Class
—Zoning
22,614 sfGross Floor Area
11Units
1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: SUNRISE BROOKLYN LLC · 6,010 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 101p · 1 filing · 2 docs
Floor 9
Floor 81p · 1 filing · 4 docs
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 2 docs
Floor 3Under Construction6p · 2 filings · 19 docs
Floor 2Under Construction6p · 2 filings · 18 docs
Floor 12p · 2 filings · 20 docs
Cellar8p · 4 filings · 20 docs
3 jobs · most recent 08/24/2026
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Signed-offYONGXIN INT CONTRACTOR I*Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Carrier PA4SAN56000N 5 tons · Split System ×6
Cooper & Hunter CH-HPR24-230V 46,000 CFM · Split System ×2
Ventilation
Canarm ×3
06/26/2026Permit IssuedACER CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×2
05/28/2026Signed-offWINWAY DEVELOPMENT LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ3 23,600 BTU · Heat Pump Outdoor ×3
Ventilation
Greenheck SP-B110 50 CFM · Exhaust Fan ×2
2 jobs · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026Signed-offCASE PLUMBING LLCSprinkler System
09/15/2024——20 outlets
3 jobs · most recent 08/24/2026
Water/Sanitary
FiledStatusContractorScope
08/24/2026———
06/26/2026Permit IssuedCITYWIDE PLBG HTG & SPKLSWater/Sanitary
05/28/2026Permit IssuedDYNAMIC PLBG & SPRKLR CORWater/Sanitary
10 jobs · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteJONG HYUN KIM—
02/02/2026Permit IssuedERIC & NG ELEC'L, INC.General Wiring
10/15/2025Permit IssuedHI-RITE ELECTRIC CORPGeneral Wiring
04/23/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
07/06/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
06/21/2022CompleteKJK ELECTRIC INC—
06/20/2022CompleteSOLAS ELECTRICAL CORP—
08/05/2021Permit IssuedA.C. MORGAN ELECTRIC1 meters, 1 new_meters
08/05/2021CompleteA.C. MORGAN ELECTRICGeneral Wiring
08/03/2021Permit IssuedWCK ELECTRIC CORP.—
1 job · most recent 08/24/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/24/2026Signed-offS & L PLUMBING INCTenant Protection Plan 72 Hour
Building Lifecycle
All (179)Filed (33)Permit Issued (22)Signed Off (10)Violation (48)Inspection (17)Objection (19)Special Inspection (30)
08/27/2026
Signed off — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-I1
08/26/2026
Special inspection requirement — Shutoff dampers
BRIAN ILL
08/26/2026
Special inspection requirement — Final
BRIAN ILL
08/26/2026
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/26/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
08/26/2026
Special inspection requirement — Interior lighting power
BRIAN ILL
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/26/2026
Special inspection requirement — Lighting controls
BRIAN ILL
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/26/2026
Special inspection requirement — Maintenance information
BRIAN ILL
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/26/2026
Special inspection requirement — Ventilation and air distribution system
BRIAN ILL
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/24/2026
Filed — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-P4
08/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/24/2026
Special inspection requirement — Maintenance information
BRIAN ILL
08/24/2026
Special inspection requirement — Shutoff dampers
BRIAN ILL
08/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/24/2026
Special inspection requirement — Final
BRIAN ILL
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/24/2026
Special inspection requirement — Interior lighting power
BRIAN ILL
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
08/24/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/24/2026
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/24/2026
Special inspection requirement — Lighting controls
BRIAN ILL
08/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
08/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/19/2026
Filed — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-P3
07/17/2026
Permit issued — Mechanical Systems
B01421374-I1-GC-CX
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/13/2026
Permit issued — Plumbing
B01421374-S1-PL
07/06/2026
Objection resolved — Addressed
07/02/2026
Objection raised — Cost
06/30/2026
Objection resolved — Addressed
06/26/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AND INSTALL NEW HVAC UNITS AT 2ND FLOOR ONLY. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01421374-I1
06/26/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AND INSTALL NEW HVAC UNITS AT 2ND FLOOR ONLY. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01421374-S1
06/16/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Other
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Cost
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
05/28/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON 3RD FLOOR. IN CONJUNCTION WITH DOB NOW GC JOB NO: B01321095-I1.
B01321095-P2
05/28/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON 3RD FLOOR. IN CONJUNCTION WITH DOB NOW GC JOB NO: B01321095-I1.
B01321095-P1
05/13/2026
Filed — No Work
B01400254-I1
04/09/2026
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY. INSTALLATION OF NEW KITCHEN EQUIPMENT, PLUMBING FIXTURES.
B01242057-I1
04/07/2026
Filed — No Work
B01381228-I1
04/03/2026
Filed — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-P2
04/02/2026
Signed off — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-S1
03/30/2026
Signed off — Alteration
FILE PLUMBING WORK OF PROPOSED WORK WITH INSTALLATION OF NEW PLUMBING FIXTURES, GREASE TRAP AND H.W.H AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01247834-S1
03/29/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01368201-I1
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Filed — Alteration
INTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.
B01240065-P1
Latest 60 of 179 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNLIGHT DEVELOPMENT GROUP2209/13/2026
GUL G CONTRACTING2307/08/2026
OWNERS REP603/22/2026
LT PRO CONSTRUCTION103/22/2026
DMA CONTRACTING3203/22/2026
KOBAN PROPERTIES503/22/2026
CONSTRUCTION MNGT AA403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2024$9.8M—— → —$433/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1108/24/2026
YANG ENGINEERING LLC306/26/2026
DEFONSECA ARCHITECTS405/28/2026
YOUN DESIGN CORP.103/29/2026
BANGASH ASSOCIATES INC.412/02/2025
ASHRAF CORP411/02/2024
HPL ENGINEERING P.C.109/15/2024
JOEL PHAGOO P.E. PLLC210/12/2022
KN3 ENGINEERING LLC207/29/2022
BASIC GROUPS CORP104/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES1203/21/2026
NYC BUILDING CONSULTANTS403/21/2026
MILETO ARCH ASSOCAITE DPC1203/21/2026
SD DESIGN STUDIO203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor903/21/2026
GUL & G CONTRACTING INCGeneral Contractor807/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing507/14/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor407/08/2026
DMA CONTRACTING INCGeneral Contractor307/08/2026
A.C. MORGAN ELECTRICElectrical203/22/2026
S & L PLUMBING INCPlumbing207/08/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
LT PRO CONSTRUCTION INCGeneral Contractor104/09/2026
CASE PLUMBING LLCFire Protection107/08/2026
WING JAY CONSTRUCTION INCGeneral Contractor104/09/2026
WINWAY DEVELOPMENT LLCGeneral Contractor104/09/2026
YONGXIN INT CONTRACTOR I*General Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
ACER CONSTRUCTION INCGeneral Contractor107/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402808/24/2026
YANG ENGINEERING LLC8376606/26/2026
AMERILAND BROOK LLC1506202/24/2026
BANGASH ASSOCIATES INC8488412/02/2025
HPL ENGINEERING PC5613110/09/2024
JOEL PHAGOO ,PE, PLLC2416210/12/2022
NY ACOM ENGINEERING PLLC7061104/02/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedACER CONSTRUCTION INC07/17/2026
DOB NOWPlumbingPermit IssuedDYNAMIC PLBG & SPRKLR COR07/13/2026
DOB NOWMechanical SystemsSigned-offWINWAY DEVELOPMENT LLC02/09/2026
DOB NOWMechanical SystemsSigned-offWING JAY CONSTRUCTION INC02/06/2026
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/22/2026
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS01/20/2026
DOB NOWPlumbingSigned-offS & L PLUMBING INC07/11/2025
DOB NOWMechanical SystemsSigned-offYONGXIN INT CONTRACTOR I*07/10/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/09/2025
DOB NOWGeneral ConstructionSigned-offLT PRO CONSTRUCTION INC07/08/2025
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC01/21/2025
DOB NOWSupported ScaffoldSigned-offSAFE-SHEILD ENTERPRISE IN10/28/2024
DOB NOWStandpipeSigned-offBELLEROSE PLBG & HEATING10/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/21/2024
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC01/17/2024
DOB NOWSupport of ExcavationSigned-offDMA CONTRACTING INC08/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/20/2023
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC09/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/23/2022
DOB NOWSupported ScaffoldSigned-offSAFE-SHEILD ENTERPRISE IN02/15/2022
DOB NOWSupport of ExcavationSigned-offDMA CONTRACTING INC08/20/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC07/27/2021
BIS—ISSUEDCONSTRUCTION MNGT. AA,LLC08/19/2025
BISPLISSUEDSAFEPIPE PLUMBING INC09/24/2024
BIS—ISSUEDCONSTRUCTION MNGT. AA,LLC08/28/2024
BISEQISSUEDCONSTRUCTION MNGT. AA,LLC08/28/2024
BIS—ISSUEDCONSTRUCTION MNGT. AA,LLC08/28/2024
BIS—ISSUEDDMA CONTRACTING INC08/08/2022
BIS—ISSUEDDMA CONTRACTING INC08/08/2022
BISPLISSUEDCATMAN PLUMBING INC01/07/2022
BIS—ISSUEDDMA CONTRACTING INC11/19/2021
BISEQISSUEDDMA CONTRACTING INC11/19/2021
BIS—ISSUEDDMA CONTRACTING INC11/19/2021
BIS—ISSUEDDMA CONTRACTING INC11/23/2020
BIS—ISSUEDDMA CONTRACTING INC11/23/2020
BISEQISSUEDDMA CONTRACTING INC11/17/2020
BISOTISSUEDH&Z BUILDING CONSULTING I01/10/2020
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/12/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
08/26/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
08/26/2026Shutoff dampersBRIAN ILLenergy_progress
08/26/2026Maintenance informationBRIAN ILLenergy_progress
08/26/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/26/2026Lighting controlsBRIAN ILLenergy_progress
08/26/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
08/26/2026Duct leakage testing, insulation and designBRIAN ILLenergy_progress
08/26/2026Ventilation and air distribution systemBRIAN ILLenergy_progress
08/26/2026Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/26/2026Energy Code Compliance InspectionsBRIAN ILLprogress
08/26/2026FinalBRIAN ILLprogress
08/26/2026Mechanical SystemsBRIAN ILLspecial
08/26/2026Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
08/26/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
08/26/2026Interior lighting powerBRIAN ILLenergy_progress
08/26/2026Insulation placement and R valuesBRIAN ILLenergy_progress
08/24/2026Lighting controlsBRIAN ILLenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
08/24/2026Mechanical SystemsBRIAN ILLspecial
08/24/2026Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
08/24/2026Energy Code Compliance InspectionsBRIAN ILLprogress
08/24/2026FinalBRIAN ILLprogress
08/24/2026Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/24/2026Insulation placement and R valuesBRIAN ILLenergy_progress
08/24/2026Shutoff dampersBRIAN ILLenergy_progress
Latest 25 of 126.
▾Documents — 341 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
09/01/2026B00494909-I1Request digital key ↗
08/31/2026B00674155-I1Request digital key ↗
08/31/2026B00674155-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026B01400254-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION37
01/13/2026321192188Open ↗
12/09/2025321192188Open ↗
09/24/2025321192188Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION21
09/25/2024321192188Open ↗
09/25/2024321192188Open ↗
09/25/2024321192188Open ↗
Showing 3 of 21 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/05/2025340509783Open ↗
02/03/2025340509783Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/17/2024321192188Open ↗
12/16/2024321192188Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/01/2025321192188Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM3
02/26/2025321192188Open ↗
11/04/2024321192188Open ↗
Showing 2 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/26/2025322118551Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
03/17/2025321192188Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/17/2025321192188Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/01/2026B00494909-I1Open ↗
08/29/2026B00761502-I1Open ↗
08/29/2026B00761502-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/29/2026B01240065-P3Open ↗
09/29/2026B01240065-P3Open ↗
09/29/2026B01240065-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/29/2026B01240065-P3Open ↗
09/23/2026B01240065-P4Open ↗
09/23/2026B01240065-S1Open ↗
Showing 3 of 15 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment29
▸BISEQUIPMENT USE PERMITS12
11/26/2025321192188Open ↗
11/26/2025321192188Open ↗
11/26/2025321192188Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING11
04/16/2025321192188Open ↗
04/09/2025321192188Open ↗
04/04/2025321192188Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/26/2025321192188Open ↗
11/26/2025321192188Open ↗
05/08/2025321192188Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/19/2025321192188Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/19/2025321192188Open ↗
▸BISSPRINKLER SYSTEMS1
03/13/2025321192188Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
03/17/2025321192188Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
05/20/2025321192188Open ↗
05/20/2025321192188Open ↗
03/20/2025321192188Open ↗
Showing 3 of 6 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION2
03/25/2025321192188Open ↗
03/25/2025321192188Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/19/2025321192188Open ↗
▸BISFENESTRATION AREAS1
03/19/2025321192188Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/19/2025321192188Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/19/2025321192188Open ↗
▸BISLIGHTING CONTROLS1
03/19/2025321192188Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/19/2025321192188Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY11
03/19/2025321192188Open ↗
03/13/2025321192188Open ↗
10/22/2020321192188Open ↗
Showing 3 of 11 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/19/2025321192188Open ↗
10/22/2020321192188Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/22/2020321192188Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/19/2025321192188Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/19/2025321192188Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/19/2025321192188Open ↗
▸BISMASONRY1
03/19/2025321192188Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/19/2025321192188Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/19/2025321192188Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISSUPERSEDING LETTER11
09/25/2024321192188Open ↗
09/25/2024321192188Open ↗
09/25/2024321192188Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
01/13/2026321192188Open ↗
12/09/2025321192188Open ↗
06/16/2025321192188Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership15
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
08/29/2024321192188Open ↗
08/29/2024321192188Open ↗
08/23/2024321192188Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/29/2024321192188Open ↗
08/29/2024321192188Open ↗
08/23/2024321192188Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT3
02/05/2025340509783Open ↗
02/05/2025340509783Open ↗
Showing 2 of 3 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
08/23/2024321192188Open ↗
08/23/2024321192188Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION10
02/19/2026321192188Open ↗
01/05/2026321192188Open ↗
11/21/2025321192188Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM10
09/25/2024321192188Open ↗
08/29/2024321192188Open ↗
08/29/2024321192188Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET5
01/13/2020322028444Open ↗
Showing 1 of 5 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/29/2024321192188Open ↗
08/23/2024321192188Open ↗
08/23/2024321192188Open ↗
Showing 3 of 4 on file for this type
▸BISLOWEST FLOOR ELEVATION1
03/19/2025321192188Open ↗
▸BISUNDERPINNING (2014)1
03/19/2025321192188Open ↗
▸BISVESTIBULES1
03/19/2025321192188Open ↗
▸BISMAINTENANCE INFORMATION1
03/19/2025321192188Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/26/2025322118551Open ↗
▸DOB NOWPlot Diagram1
09/01/2026B00494909-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00494909-I1Open ↗