DOB07/30/2025CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS @ EXP3 SUCH AS MISSING/DISPLACED/CRACKED/LOOSE MASONRY @ FACADE EXTERIOR WALL. @ EXP1 ON 140 ST OBSVD MORTAR DETERIORATION&SEVERAL MASONRY CRACKS @ MULT LOCATIONS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG&TO SUBMIT CORRECTIVE ACTION PLAN BY 8/7/25
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Factory, light manufacturing · 3,172 sf lot · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.