← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 818 60th Street Condominium
818 60 STREET · BIN 3420622
💬 Discuss this project
2016Year Built
6Stories
RMBuilding Class
C4-2Zoning
11,026 sfGross Floor Area
11Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 818 60TH ST REALTY LLC · 2,700 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 09/25/2024
General Wiring
FiledStatusContractorScope
09/25/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
01/03/2022CompleteKJK ELECTRIC INCGeneral Wiring
02/12/2019Permit IssuedROBERT S. COVELLO—
Building Lifecycle
All (70)Filed (11)Permit Issued (8)Signed Off (8)Violation (23)Inspection (5)Objection (6)Special Inspection (9)
06/17/2025
Violation issued (FDNY_ORDER, closed)
06/17/2025
Violation issued (FDNY_ORDER, closed)
06/17/2025
Violation issued (FDNY_ORDER, closed)
06/13/2025
Violation issued (HPD, closed)
A
06/12/2025
Signed off — Alteration
File MS work to install HVAC units on the 2nd floor in conjunction with DOB NOW BUILDING # B01067338. No change in use, egress or occupancy under this application.
B01067346-I1
06/10/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
06/10/2025
Special inspection requirement — Final
QIUFAN JIANG
06/02/2025
Filed — Alteration
File MS work to install HVAC units on the 2nd floor in conjunction with DOB NOW BUILDING # B01067338. No change in use, egress or occupancy under this application.
B01067346-P1
05/29/2025
Special inspection requirement — Final
QIUFAN JIANG
05/29/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
03/26/2025
Permit issued — Mechanical Systems
B01067346-I1-MS
03/25/2025
Signed off — Alteration
Install new plumbing fixtures for an existing building at 2nd floor. No change in use, egress or occupancy under this application.
B01066706-I1
03/25/2025
Signed off — Alteration
Renovation of an existing building at the 2nd floor. No change in use, egress or occupancy under this application.
B01067338-I1
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2024
Violation issued (FDNY_ORDER, closed)
12/19/2024
Violation issued (FDNY_ORDER, closed)
12/19/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Filed — Alteration
File MS work to install HVAC units on the 2nd floor in conjunction with DOB NOW BUILDING # B01067338. No change in use, egress or occupancy under this application.
B01067346-I1
10/25/2024
Filed — Alteration
Renovation of an existing building at the 2nd floor. No change in use, egress or occupancy under this application.
B01067338-P1
10/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2024
Permit issued — General Construction
B01067338-I1-GC
09/12/2024
Permit issued — Plumbing
B01066706-I1-PL
08/05/2024
Objection resolved — Addressed
07/22/2024
Objection resolved — Addressed
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
07/15/2024
Objection resolved — Addressed
07/08/2024
Objection raised — Other
07/08/2024
Objection raised — Other
07/08/2024
Objection raised — Inspections
06/24/2024
Filed — Alteration
Install new plumbing fixtures for an existing building at 2nd floor. No change in use, egress or occupancy under this application.
B01066706-I1
06/24/2024
Filed — Alteration
Renovation of an existing building at the 2nd floor. No change in use, egress or occupancy under this application.
B01067338-I1
04/17/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
08/31/2023
Signed off — Alteration
INSTALL NEW ILLUMINATED SIGN READ "SHAXIAN SNACKS" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B00840101-I1
08/31/2023
Signed off — Alteration
INSTALL NEW ILLUMINATED SIGN READ "SHAXIAN SNACKS" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B00840101-S1
08/29/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
08/22/2023
Permit issued — Sign
B00840101-I1-SG
08/22/2023
Permit issued — Sign
B00840101-S1-SG
08/17/2023
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "SHAXIAN SNACKS" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B00840101-S1
04/10/2023
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "SHAXIAN SNACKS" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B00840101-I1
03/31/2023
Violation issued (HPD, closed)
A
12/27/2022
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE. INSTALL NEW HOOD AND VENTILATION SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00419810-I1
12/27/2022
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE. INSTALL PLUMBING FIXTURES AND COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00419839-I1
11/10/2022
Violation issued (HPD, closed)
I
03/10/2022
Violation issued (HPD, closed)
I
03/10/2022
Violation issued (HPD, closed)
A
12/08/2021
Violation issued (ECB, closed)
Construction
06/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/20/2021
Violation issued (HPD, closed)
I
04/20/2021
Violation issued (HPD, closed)
A
01/19/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE. INSTALL PLUMBING FIXTURES AND COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00419839-P1
01/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
01/19/2021
Special inspection requirement — HVAC and service water heating system controls
XIAOHONG ZHAO
01/19/2021
Special inspection requirement — HVAC and service water heating equipment
XIAOHONG ZHAO
01/19/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
11/17/2020
Permit issued — Plumbing
B00419839-I1-PL
11/12/2020
Permit issued — Mechanical Systems
B00419810-I1-MS
11/06/2020
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE. INSTALL NEW HOOD AND VENTILATION SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00419810-I1
Latest 60 of 70 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STARLIGHT MANAGEMENT1407/08/2026
818 60TH ST REALTY3807/08/2026
SUNLIGHT CONSTRUCTION303/22/2026
SHAH GROUP ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITY BUILDING NY ARCHITECT P.C.506/02/2025
BASSIRI208/17/2023
AMERILAND BROOK LLC301/19/2021
LEON SKVIRSKY PE102/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT303/21/2026
BUILDING BROTHERS203/21/2026
ECDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor307/08/2026
R T ELECTRICAL CORP 004190General Contractor303/22/2026
WEN BIN CENElectrical303/21/2026
AMERICAN STANDARD PLUMBINPlumbing203/22/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
PAUL SIGNSScaffold107/08/2026
YONGXIN INT CONTRACTOR I*General Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
ROBERT S. COVELLOElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.8628506/02/2025
AMERILAND BROOK LLC1506301/19/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION03/26/2025
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION09/13/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/12/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC08/22/2023
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC08/22/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/17/2020
DOB NOWMechanical SystemsSigned-offYONGXIN INT CONTRACTOR I*11/12/2020
DOB NOWSignSigned-offPAUL SIGNS, INC02/12/2019
BISOTISSUEDYONGXIN INT CONTRACTOR I*02/07/2022
BISOTISSUEDYONGXIN INT CONTRACTOR I*11/06/2020
BISPLISSUEDSO PLUMBING & HEATING INC12/20/2018
BISOTISSUEDGENESIS NYC CONSTRUCTION12/12/2018
BISFPISSUEDMETFLOW FIRE CONTROL LLC07/16/2018
BISPLISSUEDTOP PLUMBING GROUP,INC06/28/2018
BISOTISSUEDH&Z BUILDING CONSULTING I06/13/2018
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA11/08/2017
BISPLISSUEDS & L PLUMBING INC09/12/2017
BISEQISSUEDSUNLIGHT CONSTRUCTION AA08/16/2017
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA11/07/2016
BISPLISSUEDS & L PLUMBING INC08/30/2016
BISOTISSUEDSUNLIGHT CONSTRUCTION AA04/05/2016
BISEQISSUEDSUNLIGHT CONSTRUCTION AA03/30/2016
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA03/30/2016
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA03/30/2016
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/11/2016
BISEQISSUEDSUNLIGHT CONSTRUCTION AA12/31/2015
BISEQISSUEDSHAH GROUP ENTERPRISES IN12/28/2015
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2023Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/10/2025Mechanical SystemsQIUFAN JIANGspecial
06/10/2025FinalQIUFAN JIANGprogress
05/29/2025FinalQIUFAN JIANGprogress
05/29/2025Mechanical SystemsQIUFAN JIANGspecial
07/22/2024Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
01/19/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
01/19/2021HVAC and service water heating system controls XIAOHONG ZHAOenergy_progress
01/19/2021HVAC and service water heating equipment XIAOHONG ZHAOenergy_progress
01/19/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
▾Documents — 281 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/27/2026B00840101-S1Request digital key ↗
08/27/2026B00840101-I1Request digital key ↗
08/23/2026B01067338-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00419839-I1Request digital key ↗
09/02/2026B00419839-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00419810-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00122653-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION24
02/13/2023340781229Open ↗
12/27/2022340781229Open ↗
11/02/2020340781229Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION15
11/06/2020340781229Open ↗
12/13/2018321077972Open ↗
07/17/2018321777270Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/23/2019321077972Open ↗
01/23/2019321077972Open ↗
01/23/2019321077972Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/10/2017340295246Open ↗
Showing 1 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/15/2017320908434Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
03/30/2018321730310Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
03/30/2018321730310Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/30/2018321730310Open ↗
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
03/22/2019321077972Open ↗
03/22/2019321077972Open ↗
12/13/2018321077972Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00122653-I1Open ↗
09/02/2026B00419839-I1Open ↗
09/02/2026B00419839-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/02/2020340781229Open ↗
06/26/2018321777270Open ↗
06/14/2018321761063Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B01067346-I1Open ↗
08/29/2026B00419839-P1Open ↗
08/29/2026B00419839-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/05/2026B01066706-I1Open ↗
08/29/2026B01067346-I1Open ↗
08/29/2026B00419839-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/02/2020340781229Open ↗
04/01/2016340368444Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/02/2020340781229Open ↗
04/01/2016340368444Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/07/2018321777270Open ↗
06/14/2018321761063Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING6
01/25/2018320908434Open ↗
01/24/2018320908434Open ↗
07/26/2017320908434Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/28/2019321077972Open ↗
11/07/2018321077972Open ↗
08/17/2018321761063Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/18/2018320908434Open ↗
01/18/2018320908434Open ↗
Showing 2 of 3 on file for this type
▸BISWATER CUT-OFF1
01/14/2016321234295Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
01/18/2018320908434Open ↗
▸BISGAS CUT-OFF1
01/14/2016321234295Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/11/2018321509426Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
02/15/2018320908434Open ↗
▸BISELECTRIC CUT-OFF1
01/14/2016321234295Open ↗
▸Safety & Tenant Protection19
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
01/14/2016321234295Open ↗
01/14/2016321234295Open ↗
01/14/2016321234295Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST4
10/10/2017340295246Open ↗
Showing 1 of 4 on file for this type
▸BISTenant Protection Plan and Notes4
11/07/2018321077972Open ↗
06/26/2018321777270Open ↗
06/14/2018321761063Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan3
09/02/2026B00419839-I1Open ↗
09/02/2026B00419839-P1Open ↗
09/02/2026B00419810-I1Open ↗
▸BISSTREET TREE SIGNOFF1
11/22/2017320908434Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
01/14/2016321234295Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/14/2016321234295Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRODENT CONTROL1
01/14/2016321234295Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/22/2019321077972Open ↗
12/13/2018321077972Open ↗
11/07/2018321077972Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/21/2023340781229Open ↗
03/22/2019321077972Open ↗
10/09/2018321761063Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/06/2020340781229Open ↗
11/02/2020340781229Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/02/2020340781229Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/21/2023340781229Open ↗
▸BISINTERIOR LIGHTING POWER1
02/21/2023340781229Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/06/2020340781229Open ↗
11/02/2020340781229Open ↗
11/22/2017320908434Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/02/2018320908434Open ↗
04/07/2016320908434Open ↗
▸BISMECHANICAL SYSTEMS1
02/21/2023340781229Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/07/2016320908434Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/21/2023340781229Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/31/2019321777270Open ↗
03/22/2019321077972Open ↗
10/09/2018321761063Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/30/2018321730310Open ↗
03/15/2018320908434Open ↗
02/01/2018340337781Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
11/16/2017320908434Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT11
11/02/2020340781229Open ↗
07/31/2019321777270Open ↗
03/22/2019321077972Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/09/2017320908434Open ↗
11/07/2016320908434Open ↗
04/07/2016320908434Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
11/09/2017320908434Open ↗
11/07/2016320908434Open ↗
01/06/2016321234295Open ↗
▸Filing & Intake Forms40
▸BISADDITIONAL INFORMATION12
02/13/2023340781229Open ↗
02/08/2019321077972Open ↗
02/06/2018320908434Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM12
07/31/2019321777270Open ↗
03/22/2019321077972Open ↗
10/09/2018321761063Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET10
11/07/2018321077972Open ↗
06/26/2018321777270Open ↗
06/14/2018321761063Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/02/2020340781229Open ↗
04/01/2016340368444Open ↗
Showing 2 of 4 on file for this type
▸BISSRO INTAKE FORM(SRO1)1
01/14/2016321234295Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/28/2017340295246Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
08/07/2018321777270Open ↗
03/30/2018321730310Open ↗
03/30/2018321730310Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM3
04/03/2018321730310Open ↗
Showing 1 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
01/14/2016321234295Open ↗
Showing 1 of 2 on file for this type