← Back
BuildNYC
Single or multiple dwelling with stores or offices
819 54TH STREET
BROOKLYN · BIN 3138846
💬 Discuss this project
1930Year Built
3Stories
S9Building Class
R6Zoning
6,395 sfGross Floor Area
7Units
Rent Stabilized3 Active Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 819 Group · 2,671 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Renovation on 2nd and 3rd floor and cellar boiler room6p · 2 filings · 20 docs
Floor 2Renovation on 2nd and 3rd floor and cellar boiler room4p · 2 filings · 20 docs
Floor 1
CellarAmbulartoy Diagnostic and Treatment Care Facility11p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Joman1403/21/2026
819 Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2024$3.4M—JO MAN CORP. → 819 GROUP INC.$529/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri510/08/2024
M-Con Engineering409/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio1003/21/2026
M J Design Build803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor203/21/2026
American Standard P&H CororpPlumbing207/08/2026
KJK ElectricElectrical103/22/2026
Kle ConstructionGeneral Contractor107/08/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394410/08/2024
M-Con Engineering7341309/18/2024
Building Lifecycle
All (73)Filed (9)Permit Issued (5)Signed Off (5)Violation (20)Inspection (10)Special Inspection (24)
06/17/2026
Violation issued (ECB, open)
Construction
06/06/2025
Violation issued (HPD, closed)
A
02/07/2025
Violation issued (ECB, closed)
Construction
01/21/2025
Signed off — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101015-I1
11/13/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/01/2024
Signed off — Alteration
PROPOSED PLUMBING WORK TYPE IN CONJUNCTION WITH DOB JOB# B01075508. GAS AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01075720-I1
10/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2024
Signed off — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101007-I1
10/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/18/2024
Signed off — Alteration
B01076681-I1
10/18/2024
Signed off — Alteration
RENOVATION ON 2ND, 3RD FLOOR AND CELLAR BOILER ROOM. REPAIR FLOOR, WALL AND PAINTING AS REQUIRED. PLUMBING AND BOILER WORK TYPE WILL BE FILED UNDER SEPARATE DOB APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01075508-I1
10/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/15/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/08/2024
Filed — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101007-P3
10/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/08/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2024
Filed — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101007-P2
09/19/2024
Special inspection requirement — Fenestration areas
Michelle Contri
09/19/2024
Special inspection requirement — Fenestration air leakage
Michelle Contri
09/19/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
09/19/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michelle Contri
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
09/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
09/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Michelle Contri
09/18/2024
Filed — Alteration
RENOVATION ON 2ND, 3RD FLOOR AND CELLAR BOILER ROOM. REPAIR FLOOR, WALL AND PAINTING AS REQUIRED. PLUMBING AND BOILER WORK TYPE WILL BE FILED UNDER SEPARATE DOB APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01075508-P1
09/18/2024
Special inspection requirement — Fenestration air leakage
Michelle Contri
09/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Michelle Contri
09/18/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
09/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michelle Contri
09/18/2024
Special inspection requirement — Fenestration areas
Michelle Contri
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
09/11/2024
Filed — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101007-P1
08/29/2024
Violation issued (ECB, open)
Construction
08/29/2024
Violation issued (ECB, closed)
Construction
08/29/2024
Violation issued (ECB, closed)
Construction
08/26/2024
Permit issued — Plumbing
B01101015-I1-PL
08/26/2024
Permit issued — General Construction
B01101007-I1-GC
08/23/2024
Filed — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101015-I1
08/23/2024
Filed — Alteration
NEW TILES, SHEETROCK AND CEILING ON CELLAR AS PER PLAN. INSTALL NEW ADA TOILET AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01101007-I1
08/23/2024
Violation issued (ECB, closed)
Construction
08/23/2024
Violation issued (ECB, closed)
Construction
08/08/2024
Permit issued — Boiler Equipment
B01076681-I1-BE
08/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/06/2024
Filed — Alteration
B01076681-I1
07/05/2024
Permit issued — General Construction
B01075508-I1-GC
07/05/2024
Permit issued — Plumbing
B01075720-I1-PL
07/02/2024
Filed — Alteration
PROPOSED PLUMBING WORK TYPE IN CONJUNCTION WITH DOB JOB# B01075508. GAS AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01075720-I1
07/02/2024
Filed — Alteration
RENOVATION ON 2ND, 3RD FLOOR AND CELLAR BOILER ROOM. REPAIR FLOOR, WALL AND PAINTING AS REQUIRED. PLUMBING AND BOILER WORK TYPE WILL BE FILED UNDER SEPARATE DOB APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01075508-I1
07/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
Michelle Contri
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG08/26/2024
DOB NOWGeneral ConstructionSigned-offKle Construction08/26/2024
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp08/08/2024
DOB NOWGeneral ConstructionSigned-offNY Building Associates07/05/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp07/05/2024
BISOTISSUEDHong Kong Style Construction04/02/2013
BISOTISSUED812 Management12/11/2012
BISEQISSUEDColgate Enterprise11/09/2012
BISPLISSUEDAttack Plumbing03/05/2007
BIS—ISSUEDHenrysmith Property Management03/05/2007
BISEQISSUEDHenrysmith Property Management02/27/2007
BISOTISSUEDKenbu Construction01/15/1998
BIS—ISSUEDBerger Sign Fabrication01/14/1998
BISPLISSUEDMagor Plumbing & Heating03/18/1997
BIS—ISSUEDKenbu Construction03/04/1997
1 project · most recent 09/06/2024
General Wiring
FiledStatusContractorScope
09/06/2024Permit IssuedKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/15/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/10/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/10/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/10/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/08/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/08/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/08/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/19/2024Fenestration areasMichelle Contrienergy_progress
09/19/2024Fenestration air leakageMichelle Contrienergy_progress
09/19/2024Air barrier - visual inspectionMichelle Contrienergy_progress
09/19/2024Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
09/19/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
09/19/2024Energy Code Compliance InspectionsMichelle Contriprogress
09/19/2024Fire-Resistance Rated ConstructionMichelle Contriprogress
09/18/2024Fenestration air leakageMichelle Contrienergy_progress
09/18/2024Fire-Resistance Rated ConstructionMichelle Contriprogress
09/18/2024Air barrier - visual inspectionMichelle Contrienergy_progress
09/18/2024Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
09/18/2024Fenestration areasMichelle Contrienergy_progress
09/18/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
09/18/2024Energy Code Compliance InspectionsMichelle Contriprogress
07/02/2024HVAC-R and service water heating system controlsMichelle Contrienergy_progress
07/02/2024HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
07/02/2024HVAC-R and service water heating equipmentMichelle Contrienergy_progress
07/02/2024Energy Code Compliance InspectionsMichelle Contriprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ambulartoy Diagnostic and Treatment Care FacilityMedical / HealthcareCellar
Project B01101007 Alteration · LOC Issued · 08/23/2024
Project B01101015 Alteration · LOC Issued · 08/23/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026B01075508-I1Request digital key ↗
08/24/2026B01075508-P1Request digital key ↗
08/24/2026B01075720-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
04/04/2013320551559Open ↗
12/12/2012320551559Open ↗
11/13/2012320609230Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
01/25/2024300690786Open ↗
11/09/2012320609230Open ↗
09/13/2012320551559Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature18
08/30/2026B01101007-P3Open ↗
08/29/2026B01075508-I1Open ↗
08/29/2026B01075508-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026B01075508-I1Open ↗
08/24/2026B01075508-P1Open ↗
08/24/2026B01075720-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/29/2014320551559Open ↗
11/09/2012320609230Open ↗
09/13/2012320551559Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B01101007-P3Open ↗
08/29/2026B01075508-I1Open ↗
08/28/2026B01101007-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/09/2012320609230Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/09/2012320609230Open ↗
▸Safety & Tenant Protection2
▸BISDS1-Demolition Submittal Certification Form1
12/12/2012320551559Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/12/2012320551559Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01075508-I1Open ↗
08/24/2026B01075508-P1Open ↗
08/24/2026B01075720-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/13/2012320551559Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/24/2014320551559Open ↗
09/13/2012320551559Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/12/2012320551559Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/24/2014320551559Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/24/2024300690786Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
11/09/2012320609230Open ↗
09/13/2012320551559Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/24/2024300690786Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/03/2013320609230Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/04/2013320551559Open ↗
12/12/2012320551559Open ↗
▸BISCOST AFFIDAVIT2
07/24/2014320551559Open ↗
09/13/2012320551559Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/13/2012320609230Open ↗
09/13/2012320551559Open ↗