← Back
Two stories - detached, small or mid-size
82-15 209 STREET
QUEENS · Oakland Gardens-Hollis Hills · BIN 4165010
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R2AZoning
2,200 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,400 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/22/2025$1.9M—— → —$864/sf building
05/31/2022$800K—Private party → CHECKLINE 209 ST LLC$364/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC604/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68601203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DYNAMIC CONSTRUCTION CGeneral Contractor707/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519504/02/2024
Building Lifecycle
All (56)Filed (6)Permit Issued (4)Signed Off (2)Inspection (8)Objection (6)Special Inspection (30)
09/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/11/2024
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/11/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/11/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/11/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/11/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
04/11/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/11/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/11/2024
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
04/11/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/11/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
04/11/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/11/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/11/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/11/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
04/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/05/2024
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-S1
04/02/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-P3
03/19/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-P2
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/19/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
03/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
03/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/19/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
03/19/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
03/08/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-P1
03/07/2024
Signed off — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00787503-I1
03/07/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/08/2023
Permit issued — General Construction
Q00788584-I1-GC-CX
10/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/18/2023
Permit issued — Plumbing
Q00788584-S1-PL
12/09/2022
Permit issued — General Construction
Q00788584-I1-GC-CX
12/09/2022
Permit issued — Construction Fence
Q00787503-I1-FN
09/14/2022
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-S1
08/22/2022
Objection raised — Zoning
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection raised — Zoning
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection raised — Energy
08/22/2022
Objection resolved — Addressed
08/12/2022
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. PLUMBING TO BE FILED SUBSEQUENTLY. FENCE FILED SEPEARTELEYTTO ERECT INTERIOIR PARTITIONS AND TO OBTAIN A NEW CERTIFICATE OFF OCCUPANCY.
Q00788584-I1
08/04/2022
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00787503-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNY DYNAMIC CONSTRUCTION C12/08/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/18/2023
DOB NOWGeneral ConstructionPermit IssuedNY DYNAMIC CONSTRUCTION C12/09/2022
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C12/09/2022
1 project · most recent 04/02/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2024Permit IssuedNY DYNAMIC CONSTRUCTION CAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-4C36NA2 400,000 BTU · Heat Pump Outdoor ×9
Heating
Mitsubishi Electric MXZ-4C36NA2 3 BTU ×9
Ventilation
Mitsubishi Electric MXZ-4C36NA2 400,000 BTU · Heat Pump Outdoor ×9
1 project · most recent 04/02/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2024Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 project · most recent 03/28/2023
General Wiring
FiledStatusContractorScope
03/28/2023CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/11/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/11/2024Subgrade InspectionsYounes Abouyaalaspecial
04/11/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/11/2024Mechanical SystemsYounes Abouyaalaspecial
04/11/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/11/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/11/2024FinalNAVEEN KUMARprogress
04/11/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/11/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/11/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/11/2024Maintenance informationYounes Abouyaalaenergy_progress
04/11/2024Permanent certificateYounes Abouyaalaenergy_progress
04/11/2024Fenestration air leakageYounes Abouyaalaenergy_progress
04/11/2024Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
04/11/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/11/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/11/2024Exterior lighting powerYounes Abouyaalaenergy_progress
04/11/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/11/2024Interior lighting powerYounes Abouyaalaenergy_progress
04/11/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/11/2024Fenestration areasYounes Abouyaalaenergy_progress
04/11/2024Lighting controlsYounes Abouyaalaenergy_progress
04/11/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/19/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/19/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
Latest 25 of 52.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00787503-I1Request digital key ↗
08/23/2026Q00788584-P3Request digital key ↗
08/23/2026Q00788584-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00788584-P1Open ↗
08/13/2026Q00788584-I1Open ↗
08/13/2026Q00788584-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00788584-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00788584-P2Open ↗
09/01/2026Q00788584-P2Open ↗
09/01/2026Q00788584-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00788584-P2Open ↗
09/01/2026Q00788584-P2Open ↗
09/01/2026Q00788584-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00788584-P3Open ↗
08/23/2026Q00788584-P2Open ↗
08/23/2026Q00788584-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00788584-P3Open ↗
08/13/2026Q00788584-P1Open ↗
08/13/2026Q00788584-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00788584-P1Open ↗
08/23/2026Q00788584-P3Open ↗
08/23/2026Q00788584-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00788584-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00788584-P2Open ↗
08/13/2026Q00788584-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00788584-S1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00788584-P3Open ↗
08/13/2026Q00788584-P1Open ↗
08/13/2026Q00788584-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00788584-P3Open ↗
08/13/2026Q00788584-I1Open ↗
08/13/2026Q00788584-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00788584-P3Open ↗
08/13/2026Q00788584-P1Open ↗
08/13/2026Q00788584-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00788584-P3Open ↗
08/23/2026Q00788584-P1Open ↗
08/15/2026Q00788584-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00788584-I1Open ↗