← Back
BuildNYC
Two family brick
82-15 GRAND AVENUE
QUEENS · Elmhurst · BIN 4058306
💬 Discuss this project
1945Year Built
2Stories
B1Building Class
R4Zoning
2,056 sfGross Floor Area
2Units
0 Active Violations
Two family brick · 1,942 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 1 filing · 14 docs
Floor 15p · 1 filing · 14 docs
Cellar7p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Flushing312/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CK Cooling & Heatingspecialty_contractor203/21/2026
Tri State Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Flushing Engineering Service4373312/13/2021
Building Lifecycle
02/06/2022
Signed off — Alteration
REPLACE (2) GAS LINE, (2) H.W.H, REMOVE GAS STOVE AND SINK, INSTALL ELEC. WASHER AND DRYER IN CELLAR; INSTALL GAS STOVE, SINK ON 1ST FLOOR; REPLACE GAS STOVE, SINK, LAV. WC, TUB ON 2ND FLOOR. TO REMOVE VIOLATION #39033838H, #39033839J.
Q00522343-I1
02/06/2022
Signed off — Alteration
REPLACE (2) GAS LINE, (2) H.W.H, REMOVE GAS STOVE AND SINK, INSTALL ELEC. WASHER AND DRYER IN CELLAR; INSTALL GAS STOVE, SINK ON 1ST FLOOR; REPLACE GAS STOVE, SINK, LAV. WC, TUB ON 2ND FLOOR. TO REMOVE VIOLATION #39033838H, #39033839J.
Q00522343-S1
01/24/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW Plumbing01/03/2022
DOB NOWPlumbingSigned-offDW Plumbing08/02/2021
DOB NOWGeneral ConstructionSigned-offCK Cooling Heating07/26/2021
1 project · most recent 08/25/2021
General Wiring
FiledStatusContractorScope
08/25/2021CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/24/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/16/2021Fire-Resistant Penetrations and JointsKY FUspecial
12/16/2021Energy Code Compliance InspectionsKY FUprogress
12/16/2021HVAC-R and service water piping design and insulationKY FUenergy_progress
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account