← Back
One story - permanent living quarter
82-27 188 STREET
QUEENS · Jamaica Estates-Holliswood · BIN 4156604
💬 Discuss this project
1950Year Built
2Stories
A2Building Class
R2AZoning
3,301 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 7,425 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Roof28p · 2 filings · 20 docs
Floor 2Under Construction54p · 3 filings · 20 docs
Floor 1Under Construction54p · 2 filings · 20 docs
CellarUnder Construction55p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZION GROUP2807/08/2026
INC IMG MANAGEMENT403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2019$1.2M—— → —$365/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECC SOLUTIONS308/14/2026
EYAL LEVITT ARCHITECT PC208/04/2026
RAS PE CONSULTING ENGINEERS801/13/2025
JLS DESIGNS208/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABRIS DESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMG MANAGEMENT INCGeneral Contractor1707/08/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
MAXWELL PLUMB MECH. CORPPlumbing108/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519908/14/2026
IP CONCRETE TESTING AND I6252308/04/2026
Building Lifecycle
All (93)Filed (15)Permit Issued (15)Violation (8)Inspection (5)Objection (20)Special Inspection (30)
09/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2026
Filed — Alteration
MECHANICAL SYSTEM INSTALLATION FOR PROPOSED NEW RESIDENTIAL BUILDING AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q00565362-P2
08/12/2026
Permit issued — Plumbing
Q00565362-I1-PL
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2026
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION WITH ALT-1 NYC DOB JOB NUMBER: 440611633.
Q00586574-P1
06/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2026
Violation issued (ECB, closed)
Unknown
04/29/2026
Violation issued (ECB, closed)
Unknown
04/29/2026
Violation issued (ECB, closed)
Construction
04/29/2026
Violation issued (ECB, closed)
Unknown
04/17/2026
Permit issued — Construction Fence
Q00390165-I1-FN
02/16/2026
Violation issued (ECB, closed)
Construction
08/12/2025
Permit issued — Plumbing
Q00565362-I1-PL
07/17/2025
Permit issued — Support of Excavation
Q07998975-I1-SE
07/17/2025
Permit issued — Foundation
Q07998975-S1-FO-EA
04/18/2025
Permit issued — Construction Fence
Q00390165-I1-FN
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/17/2025
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
01/23/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
01/22/2025
Objection resolved — Addressed
01/22/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
01/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/22/2025
Special inspection requirement — Underpinning
Younes Abouyaala
01/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
01/22/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/22/2025
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
01/22/2025
Special inspection requirement — Masonry
Younes Abouyaala
01/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/22/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/22/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/22/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/22/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/22/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
01/22/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/22/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/16/2025
Objection raised — Other
01/13/2025
Filed — Alteration
HEREWITH FILING FOR ALT-1 FOUNDATION AND EARTHWORK DESIGN FOR 2-STY MASONRY COMMUNITY FACILITY WITH PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENTS. THIS JOB IS IN CONJUNCTION WITH GC/ARCH APPLICATION FILED UNDER DOB BIS JOB # 440611633.
Q07998975-P4
01/13/2025
Filed — Alteration
HEREWITH FILING FOR ALT-1 FOUNDATION AND EARTHWORK DESIGN FOR 2-STY MASONRY COMMUNITY FACILITY WITH PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENTS. THIS JOB IS IN CONJUNCTION WITH GC/ARCH APPLICATION FILED UNDER DOB BIS JOB # 440611633.
Q07998975-P5
01/13/2025
Filed — Alteration
HEREWITH FILING FOR ALT-1 FOUNDATION AND EARTHWORK DESIGN FOR 2-STY MASONRY COMMUNITY FACILITY WITH PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENTS. THIS JOB IS IN CONJUNCTION WITH GC/ARCH APPLICATION FILED UNDER DOB BIS JOB # 440611633.
Q07998975-P3
12/05/2024
Permit issued — Construction Fence
Q00390165-I1-FN
11/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
11/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/29/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
11/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
10/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/21/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
10/21/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
10/21/2024
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
09/04/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Other
08/23/2024
Filed — Alteration
MECHANICAL SYSTEM INSTALLATION FOR PROPOSED NEW RESIDENTIAL BUILDING AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q00565362-S1
07/17/2024
Permit issued — Plumbing
Q00565362-I1-PL
07/05/2024
Permit issued — Structural
Q07998975-S2-ST
11/28/2023
Filed — Alteration
MECHANICAL SYSTEM INSTALLATION FOR PROPOSED NEW RESIDENTIAL BUILDING AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q00565362-I1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMAXWELL PLUMB MECH. CORP08/12/2026
DOB NOWConstruction FencePermit IssuedIMG MANAGEMENT INC04/17/2026
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP08/12/2025
DOB NOWSupport of ExcavationPermit Issued2MG MANAGEMENT07/17/2025
DOB NOWFoundationPermit Issued2MG MANAGEMENT07/17/2025
DOB NOWConstruction FencePermit Issued2MG MANAGEMENT04/18/2025
DOB NOWConstruction FencePermit Issued2MG MANAGEMENT12/05/2024
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP07/17/2024
DOB NOWStructuralPermit Issued2MG MANAGEMENT07/05/2024
DOB NOWConstruction FencePermit Issued2MG MANAGEMENT10/06/2023
DOB NOWStructuralPermit Issued2MG MANAGEMENT06/05/2023
DOB NOWEarth WorkPermit Issued2MG MANAGEMENT05/31/2023
DOB NOWSupport of ExcavationPermit Issued2MG MANAGEMENT05/30/2023
DOB NOWConstruction FencePermit Issued2MG MANAGEMENT09/01/2022
DOB NOWConstruction FencePermit IssuedSTELLAR INDUSTRIES INC09/15/2020
BIS—ISSUEDIMG MANAGEMENT INC04/17/2025
BIS—ISSUEDIMG MANAGEMENT INC04/17/2024
BIS—ISSUEDIMG MANAGEMENT INC10/06/2023
BIS—ISSUEDIMG MANAGEMENT INC06/07/2023
BIS—ISSUEDIMG MANAGEMENT INC09/09/2022
BIS—ISSUEDIMG MANAGEMENT INC09/09/2022
1 project · most recent 08/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ36TBVJUA 3 tons · Vrf Outdoor ×20
RXTQ48TBVJUA 4 tons · Vrf Outdoor ×12
RXSQ24TBVJUA 2 tons · Vrf Outdoor ×4
RXTQ48TBVJUB 4 tons · Vrf Outdoor ×8
RXTQ36TBVJUB 3 tons · Vrf Outdoor ×2
RX18BXVJU 18,000 BTU · Split System ×1
Ventilation
Renewaire HE2X RTH 2,000 CFM · Erv ×5
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026——92 heads
1 project · most recent 08/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/14/2026Permit IssuedMAXWELL PLUMB MECH. CORPGas, Storm, Water/Sanitary
1 project · most recent 01/10/2024
General Wiring
FiledStatusContractorScope
01/10/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 01/13/2025
Steel Concrete Masonry
FiledStatusContractorScope
01/13/2025Permit IssuedIMG MANAGEMENT INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
04/17/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/17/2025Sprinkler SystemsINDARDEO PARBHUNATHspecial
01/23/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/23/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
01/23/2025Subgrade InspectionsYounes Abouyaalaspecial
01/23/2025Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
01/22/2025Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
01/22/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/22/2025UnderpinningYounes Abouyaalaspecial
01/22/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
01/22/2025Structural Steel - DetailsYounes Abouyaalaspecial
01/22/2025Structural Steel - WeldingYounes Abouyaalaspecial
01/22/2025MasonryYounes Abouyaalaspecial
01/22/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/22/2025FinalNAVEEN KUMARprogress
01/22/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/22/2025Subgrade InspectionsYounes Abouyaalaspecial
01/22/2025FinalNAVEEN KUMARprogress
01/22/2025Structural Steel - High Strength BoltingYounes Abouyaalaspecial
01/22/2025Footing and FoundationYounes Abouyaalaprogress
01/22/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
11/29/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
11/29/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
11/29/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/29/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
Latest 25 of 55.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
08/26/2026Q00586574-P1Request digital key ↗
08/25/2026Q07998975-P5Request digital key ↗
08/25/2026Q07998975-P4Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00390165-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00390135-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION14
02/23/2026440611633Open ↗
10/20/2025440611633Open ↗
10/09/2025440611633Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION4
10/02/2023440611633Open ↗
10/13/2022440611633Open ↗
10/13/2022440611633Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISAMENDED ZONING DIAGRAM1
08/16/2024440611633Open ↗
▸BISZONING DIAGRAM1
05/24/2022440611633Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00390135-I1Open ↗
08/28/2026Q00390165-I1Open ↗
08/26/2026Q00586574-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/06/2026Q07998975-P3Open ↗
09/06/2026Q07998975-P3Open ↗
09/02/2026Q00586574-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/06/2026Q07998975-P3Open ↗
09/06/2026Q07998975-P3Open ↗
08/29/2026Q07998975-S2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/02/2020440611633Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/24/2022440611633Open ↗
▸BISSPRINKLER SYSTEMS1
08/31/2022440611633Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/21/2022440611633Open ↗
▸BISSTREET TREE CHECKLIST1
05/24/2022440611633Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026Q00390135-I1Open ↗
08/25/2026Q07998975-P2Open ↗
08/25/2026Q07998975-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/02/2020440611633Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/09/2022440611633Open ↗
05/24/2022440611633Open ↗
09/10/2020440611633Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/09/2022440611633Open ↗
07/22/2022440611633Open ↗
05/24/2022440611633Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT5
08/25/2026Q07998975-P1Open ↗
08/15/2026Q07998975-S1Open ↗
08/14/2026Q07998975-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
05/24/2022440611633Open ↗
09/10/2021440611633Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)2
05/24/2022440611633Open ↗
05/24/2022440611633Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q07998975-S1Open ↗
08/13/2026Q07998975-I1Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/21/2022440611633Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/21/2022440611633Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/31/2022440611633Open ↗
▸BISSOIL REPORT1
09/10/2021440611633Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/31/2022440611633Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/31/2022440611633Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/31/2022440611633Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/31/2022440611633Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/31/2022440611633Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE10
02/23/2026440611633Open ↗
08/14/2024440611633Open ↗
10/27/2023440611633Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER1
10/02/2023440611633Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/10/2020440611633Open ↗
09/02/2020440611633Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/14/2022440611633Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
08/16/2024440611633Open ↗
07/25/2024440611633Open ↗
09/03/2021440611633Open ↗
▸BISBOROUGH INTAKE FORM2
10/02/2023440611633Open ↗
10/14/2022440611633Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2020440611633Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram5
08/25/2026Q07998975-P1Open ↗
08/15/2026Q07998975-S1Open ↗
08/14/2026Q07998975-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q07998975-I1Open ↗
08/13/2026Q07998975-S1Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
08/31/2022440611633Open ↗
▸BISSupporting Document: Fee Deferment1
08/16/2024440611633Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/15/2020440611633Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/31/2022440611633Open ↗