Three families
82 3 PLACE
BROOKLYN · BIN 3005403
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,375 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · Owner of record: DOUBLE J CANAL LLC · 2,500 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 1 filing · 20 docs
Floor 4Under Construction42p · 1 filing · 20 docs
Floor 3Under Construction43p · 1 filing · 20 docs
Floor 2Under Construction43p · 1 filing · 20 docs
Floor 1Under Construction41p · 1 filing · 20 docs
CellarUnder Construction43p · 1 filing · 20 docs
BasementUnder Construction44p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA809/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/22/2025$4.6M—— → —$1,363/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mega General503/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTR NYCGeneral Contractor1007/08/2026
MEGA GENERAL CONSTRUCTIONGeneral Contractor807/08/2026
TITAN SERVICES USA INCGeneral Contractor307/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637408/04/2026
HPL ENGINEERING PC5613804/27/2026
Building Lifecycle
All (125)Filed (16)Permit Issued (17)Violation (10)Inspection (10)Objection (42)Special Inspection (30)
08/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
08/07/2026
Special inspection requirement — Maintenance information
Robert Truskosky
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
08/04/2026
Filed — Alteration CO
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB NOW GC JOB#: B01223230-I1.
B01223230-P6
07/14/2026
Violation issued (ECB, open)
Construction
07/14/2026
Violation issued (ECB, open)
Construction
07/06/2026
Filed — Alteration
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01425071-I1
07/06/2026
Permit issued — Protection and Mechanical Methods
B01425071-I1-PMM
05/12/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2026
Special inspection requirement — Subgrade Inspections
Fran Huang
05/08/2026
Special inspection requirement — Final
Fran Huang
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
05/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/08/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Fran Huang
05/08/2026
Special inspection requirement — Footing and Foundation
Fran Huang
05/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
05/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
05/07/2026
Special inspection requirement — Structural Steel - Details
Fran Huang
05/07/2026
Special inspection requirement — Structural Cold-Formed Steel
Fran Huang
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
05/07/2026
Special inspection requirement — Final
Fran Huang
05/07/2026
Special inspection requirement — Masonry
Fran Huang
05/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
04/27/2026
Filed — Alteration CO
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB NOW GC JOB#: B01223230-I1.
B01223230-P4
04/27/2026
Filed — Alteration CO
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB NOW GC JOB#: B01223230-I1.
B01223230-P3
04/24/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Fran Huang
04/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
04/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
04/24/2026
Special inspection requirement — Subgrade Inspections
Fran Huang
04/24/2026
Special inspection requirement — Structural Cold-Formed Steel
Fran Huang
04/24/2026
Special inspection requirement — Masonry
Fran Huang
04/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
04/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
04/24/2026
Special inspection requirement — Structural Steel - Details
Fran Huang
04/24/2026
Special inspection requirement — Final
Fran Huang
04/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2026
Permit issued — Sidewalk Shed
B01379924-I1-SH
04/01/2026
Objection resolved — Addressed
03/31/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01379924-I1
03/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2026
Objection resolved — Addressed
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/25/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Zoning
02/18/2026
Permit issued — Supported Scaffold
B01360436-I1-SF
02/17/2026
Filed — Alteration
B01360436-I1
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Fire_Protection
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedTITAN SERVICES USA INC07/06/2026
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC04/02/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedMEGA GENERAL CONSTR NYC12/26/2025
DOB NOWConstruction FencePermit IssuedMEGA GENERAL CONSTR NYC12/23/2025
DOB NOWStructuralPermit IssuedMEGA GENERAL CONSTR NYC12/22/2025
DOB NOWFoundationPermit IssuedMEGA GENERAL CONSTR NYC12/22/2025
DOB NOWMechanical SystemsPermit IssuedMEGA GENERAL CONSTR NYC12/22/2025
DOB NOWSupport of ExcavationPermit IssuedMEGA GENERAL CONSTR NYC12/22/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.10/16/2025
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN10/16/2025
DOB NOWConstruction FencePermit IssuedMEGA GENERAL CONSTRUCTION10/15/2025
DOB NOWSupport of ExcavationPermit IssuedMEGA GENERAL CONSTRUCTION10/15/2025
DOB NOWMechanical SystemsPermit IssuedMEGA GENERAL CONSTRUCTION10/15/2025
DOB NOWGeneral ConstructionPermit IssuedMEGA GENERAL CONSTRUCTION10/14/2025
DOB NOWFoundationPermit IssuedMEGA GENERAL CONSTRUCTION10/10/2025
DOB NOWStructuralPermit IssuedMEGA GENERAL CONSTRUCTION10/10/2025
1 project · most recent 08/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Permit IssuedMEGA GENERAL CONSTR NYCHeating and Air Conditioning Systems
Heat / Cool
Daikin RMXS48LVJU 48,000 BTU · Condensing Unit ×5
1 project · most recent 08/04/2026
Sprinkler System
FiledStatusContractorScope
08/04/2026Permit IssuedAMERICAN STANDARD PLUMBINSprinkler System
1 project · most recent 08/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
2 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
04/02/2026Permit IssuedRICHARD NEU—
1 project · most recent 08/04/2026
Steel Masonry Wood
FiledStatusContractorScope
08/04/2026Permit IssuedMEGA GENERAL CONSTR NYCSteel, Masonry, Wood
2 projects · most recent 08/04/2026
Fence Sidewalk Shed
FiledStatusContractorScope
08/04/2026Permit IssuedMEGA GENERAL CONSTR NYCFence
03/31/2026Permit IssuedTITAN SERVICES USA INCSidewalk Shed
1 project · most recent 08/04/2026
Earthwork
FiledStatusContractorScope
08/04/2026Permit IssuedMEGA GENERAL CONSTR NYCEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
08/07/2026Energy Code Compliance InspectionsRobert Truskoskyprogress
08/07/2026HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
08/07/2026Maintenance informationRobert Truskoskyenergy_progress
08/07/2026HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
08/07/2026HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
08/07/2026Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
05/08/2026FinalFran Huangprogress
05/08/2026Footing and FoundationFran Huangprogress
05/08/2026Subgrade InspectionsFran Huangspecial
05/08/2026Concrete - Cast-In-PlaceFran Huangspecial
05/08/2026Construction Operations Influencing Adjacent StructuresFran Huangspecial
05/08/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
05/08/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/07/2026MasonryFran Huangspecial
05/07/2026FinalFran Huangprogress
05/07/2026Concrete - Cast-In-PlaceFran Huangspecial
05/07/2026Structural Cold-Formed SteelFran Huangspecial
05/07/2026Structural Steel - DetailsFran Huangspecial
05/07/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
04/24/2026FinalFran Huangprogress
04/24/2026Concrete - Cast-In-PlaceFran Huangspecial
04/24/2026Construction Operations Influencing Adjacent StructuresFran Huangspecial
04/24/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
04/24/2026Subgrade InspectionsFran Huangspecial
04/24/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 74.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/03/2026B01379924-I1Request digital key ↗
08/18/2026B01360436-I1Request digital key ↗
08/17/2026B01223230-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/18/2025340918975Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/18/2025340918975Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01223230-I1Open ↗
08/13/2026B01223230-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01223230-I1Open ↗
08/13/2026B01223230-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01223230-P2Open ↗
08/13/2026B01223230-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWProgress Inspector Seal & Signature44
09/27/2026B01223230-P2Open ↗
09/27/2026B01223230-P2Open ↗
09/27/2026B01223230-P2Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/27/2026B01223230-P2Open ↗
09/27/2026B01223230-P2Open ↗
09/23/2026B01223230-S7Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026B01379924-I1Open ↗
08/18/2026B01360436-I1Open ↗
08/17/2026B01223230-I1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2025340918975Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2025340918975Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B01223230-P2Open ↗
08/13/2026B01223230-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/18/2025340918975Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/17/2026B01223230-S3Open ↗
08/17/2026B01223230-S4Open ↗
08/17/2026B01223230-S5Open ↗
Showing 3 of 13 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026B01223230-P4Open ↗
08/13/2026B01223230-S2Open ↗
08/13/2026B01223230-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01223230-S2Open ↗
08/13/2026B01223230-S3Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2025340918975Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/18/2025340918975Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram5
08/17/2026B01223230-P4Open ↗
08/13/2026B01223230-S3Open ↗
08/13/2026B01223230-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B01223230-P2Open ↗
08/13/2026B01223230-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01223230-I1Open ↗
08/13/2026B01223230-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026B01223230-I1Open ↗
08/17/2026B01223230-P2Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/18/2025340918975Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01223230-S3Open ↗