← Back
One story - permanent living quarter
82-37 249 STREET
QUEENS · BIN 4174983
💬 Discuss this project
1955Year Built
1.67Stories
A2Building Class
R2AZoning
1,123 sfGross Floor Area
1Units
One story - permanent living quarter · 4,700 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 12 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT703/11/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DREAM CONTRACTING NY INCGeneral Contractor403/21/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642603/11/2024
Building Lifecycle
All (50)Filed (7)Permit Issued (3)Signed Off (2)Inspection (6)Objection (2)Special Inspection (30)
03/15/2024
Signed off — Alteration
PROPOSED ONE STORY PLUS CELLAR HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE AS PER DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q08021918-I1
03/11/2024
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08021895-P2
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
03/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
03/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
02/06/2024
Signed off — Alteration
Q08021904-I1
12/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/15/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/03/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Masonry
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Structural Steel - Welding
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Structural Cold-Formed Steel
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
10/20/2023
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
10/20/2023
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
10/12/2023
Filed — Alteration
PROPOSED ONE STORY PLUS CELLAR HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE AS PER DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q08021918-P2
10/12/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08021895-P1
10/10/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
10/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
10/05/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2023
Permit issued — Plumbing
Q08021895-I1-PL
05/22/2023
Permit issued — Foundation
Q08021918-I1-GC-CX
05/16/2023
Objection resolved — Addressed
05/15/2023
Objection raised — Scope
05/08/2023
Filed — Alteration
PROPOSED ONE STORY PLUS CELLAR HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE AS PER DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q08021918-P1
05/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
05/08/2023
Special inspection requirement — Structural Steel - Welding
MUZAFFAR JAMAL
05/08/2023
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
05/08/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
05/08/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
04/14/2023
Permit issued — Construction Fence
Q08021904-I1-FN
11/08/2022
Filed — Alteration
PROPOSED ONE STORY PLUS CELLAR HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE AS PER DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q08021918-I1
11/08/2022
Filed — Alteration
Q08021904-I1
11/08/2022
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08021895-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP08/07/2023
DOB NOWFoundationSigned-offDREAM CONTRACTING NY05/22/2023
DOB NOWConstruction FenceSigned-offDREAM CONTRACTING NY04/14/2023
BISOTISSUEDPRO CUSTOM SOLAR LLC02/28/2023
1 project · most recent 03/11/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/11/2024Signed-offWATERMARK PLUMBING CORPGas, Storm, Water/Sanitary
2 projects · most recent 06/30/2023
General Wiring
FiledStatusContractorScope
06/30/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
03/27/2023CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/03/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/05/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
03/11/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
03/11/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
03/11/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/20/2023HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
10/20/2023Construction Operations Influencing Adjacent StructuresMUZAFFAR JAMALspecial
10/20/2023MasonryMUZAFFAR JAMALspecial
10/20/2023Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
10/20/2023Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
10/20/2023Structural Steel - WeldingMUZAFFAR JAMALspecial
10/20/2023Subgrade InspectionsMUZAFFAR JAMALspecial
10/20/2023Structural Cold-Formed SteelMUZAFFAR JAMALspecial
10/20/2023Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
10/20/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/20/2023FinalTARIQ SIDDIQUIprogress
10/20/2023Footing and FoundationMUZAFFAR JAMALprogress
10/20/2023Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
10/20/2023Interior lighting powerMUZAFFAR JAMALenergy_progress
10/20/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
10/20/2023Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
10/20/2023HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
10/20/2023Fenestration areasMUZAFFAR JAMALenergy_progress
10/20/2023Fenestration air leakageMUZAFFAR JAMALenergy_progress
10/10/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/10/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
10/10/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
Latest 25 of 44.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q08021918-P2Request digital key ↗
08/25/2026Q08021918-I1Request digital key ↗
08/25/2026Q08021895-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
01/18/2024440770925Open ↗
01/17/2024440770925Open ↗
02/24/2023440770925Open ↗
▸BISWORK PERMIT APPLICATION1
02/28/2023440770925Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q08021918-I1Open ↗
08/13/2026Q08021918-P1Open ↗
08/13/2026Q08021918-P2Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature22
09/24/2026Q08021895-P1Open ↗
09/24/2026Q08021895-P1Open ↗
08/25/2026Q08021895-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q08021918-P2Open ↗
08/25/2026Q08021918-I1Open ↗
08/25/2026Q08021918-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026Q08021895-P1Open ↗
08/25/2026Q08021895-P2Open ↗
08/24/2026Q08021918-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/24/2023440770925Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/24/2023440770925Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/24/2023440770925Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
02/28/2023440770925Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/24/2023440770925Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/02/2024440770925Open ↗
02/24/2023440770925Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/24/2023440770925Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/02/2024440770925Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/24/2023440770925Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/02/2024440770925Open ↗
▸Inspections & Test Reports5
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026Q08021918-P1Open ↗
08/13/2026Q08021918-I1Open ↗
08/13/2026Q08021918-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/02/2024440770925Open ↗
02/24/2023440770925Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/05/2024440770925Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/07/2024440770925Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/05/2024440770925Open ↗
02/24/2023440770925Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/02/2024440770925Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/18/2024440770925Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/24/2023440770925Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026Q08021918-I1Open ↗
08/13/2026Q08021918-P1Open ↗
08/13/2026Q08021918-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q08021918-P2Open ↗
08/13/2026Q08021918-P1Open ↗
08/13/2026Q08021918-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08021918-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q08021918-I1Open ↗