← Back
BuildNYC
Elevator apt, semi-fireproof with stores
82 4TH AVENUE
BROOKLYN · BIN 3006003
💬 Discuss this project
2023Year Built
9Stories
D7Building Class
C4-4DZoning
19,841 sfGross Floor Area
30Units
Rent Stabilized7 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 82 Fourth Development · 3,313 sf lot · 5.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsSprinkler and standpipe system installation6 filings
RoofTemporary roof protection installation1 filing
Site & exteriorOverhead protection installation5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Boerum Hill 82203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/19/2024$20.0M—BOERUM HILL 82 LLC → 82 FOURTH DEVELOPMENT LLC$1,008/sf building
12/30/2020$2.6M—4TH AVENUE BUILDERS LLC → BOERUM HILL 82 LLC— not available
06/02/2016$2.1M—Private party → 4TH AVENUE BUILDERS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering702/28/2023
Paul Perdek, Prof. Engineering809/15/2022
Titan Engineers104/29/2021
South Bay Engineering111/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group1603/21/2026
AE Design Solution1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1107/08/2026
Best Mechanical ServicesPlumbing407/08/2026
Target ConstructionGeneral Contractor407/08/2026
Target ConstructionScaffold307/08/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
TFK ElectricGeneral Contractor103/22/2026
Lester KatzElectrical103/21/2026
Star Electrical ContractorsElectrical103/22/2026
TFK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394802/28/2023
Building Lifecycle
All (72)Filed (17)Permit Issued (14)Signed Off (11)Inspection (7)Special Inspection (23)
04/03/2023
Signed off — Alteration
B00406245-I1
03/10/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
03/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/08/2023
Signed off — Alteration
SPRINKLER AND STANDPIPE PLANS FILED HEREWITH.
B00443999-I1
02/28/2023
Filed — Alteration
B00406245-P1
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
02/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
02/27/2023
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
02/27/2023
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
02/27/2023
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
02/27/2023
Special inspection requirement — Maintenance information
Paul Raymond
02/23/2023
Signed off — Alteration
B00672610-I1
02/15/2023
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/10/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/10/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/13/2023
Signed off — Alteration
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH NB JOB 340752769.
B00387930-I1
01/12/2023
Signed off — Alteration
B00391247-I1
01/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/09/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/22/2022
Filed — Alteration
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH NB JOB 340752769.
B00387930-P1
12/22/2022
Filed — Alteration
SPRINKLER AND STANDPIPE PLANS FILED HEREWITH.
B00443999-P1
12/21/2022
Permit issued — Standpipe
B00443999-I1-EW-SD
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/21/2022
Special inspection requirement — Mechanical Systems
Paul Raymond
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
12/21/2022
Special inspection requirement — Final
Paul Raymond
12/21/2022
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
12/21/2022
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
12/21/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
12/21/2022
Special inspection requirement — Maintenance information
Paul Raymond
12/21/2022
Special inspection requirement — Shutoff dampers
Paul Raymond
12/21/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
12/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/20/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
12/20/2022
Special inspection requirement — Standpipe Systems
Paul Raymond
11/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768377-I1
11/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768378-I1
11/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768380-I1
11/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00760223-I1
11/29/2022
Signed off — Alteration
B00407251-I1
11/03/2022
Permit issued — Sprinklers
B00443999-I1-EW-SP
09/15/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00760223-P2
08/29/2022
Permit issued — Mechanical Systems
B00387930-I1-MS
08/19/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/11/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768380-P1
07/28/2022
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/06/2022
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768377-I1
07/06/2022
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768378-I1
07/06/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768380-I1
07/06/2022
Permit issued — Supported Scaffold
B00768380-I1-SF
07/06/2022
Permit issued — Protection and Mechanical Methods
B00768378-I1-PM
07/06/2022
Permit issued — Protection and Mechanical Methods
B00768377-I1-PM
06/27/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00760223-P1
06/22/2022
Permit issued — Sidewalk Shed
B00760223-I1-SH
06/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00760223-I1
06/14/2022
Permit issued — Standpipe
B00672610-I1-EW-SD
05/16/2022
Permit issued — Construction Fence
B00407251-I1-FN
05/11/2022
Permit issued — Structural
B00391247-I1-ST
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offBest Mechanical Services12/21/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/03/2022
DOB NOWMechanical SystemsSigned-offTarget Construction08/29/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems07/06/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/06/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/06/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/22/2022
DOB NOWStandpipeSigned-offBest Mechanical Services06/14/2022
DOB NOWConstruction FenceSigned-offTarget Construction05/16/2022
DOB NOWStructuralSigned-offTarget Construction05/11/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating05/10/2022
DOB NOWPlumbingSigned-offBest Mechanical Services05/10/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems07/14/2021
DOB NOWConstruction FenceSigned-offTarget Construction05/26/2021
6 projects · most recent 03/27/2023
General Wiring
FiledStatusContractorScope
03/27/2023CompleteStar Electrical Contractors—
09/22/2022CompleteTFK Electric31 meters, 31 new_meters
08/10/2022CompleteTFK ElectricGeneral Wiring
07/06/2022CompleteTFK Electric—
06/22/2022CompleteSolas Electrical—
07/19/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/15/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/19/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/28/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/10/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
03/10/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/10/2023Energy Code Compliance InspectionsPaul Raymondprogress
02/27/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
02/27/2023Energy Code Compliance InspectionsPaul Raymondprogress
02/27/2023HVAC insulation and sealing Paul Raymondenergy_progress
02/27/2023HVAC and service water heating equipment Paul Raymondenergy_progress
02/27/2023HVAC and service water heating system controls Paul Raymondenergy_progress
02/27/2023Maintenance informationPaul Raymondenergy_progress
12/21/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/21/2022Mechanical SystemsPaul Raymondspecial
12/21/2022Energy Code Compliance InspectionsPaul Raymondprogress
12/21/2022FinalPaul Raymondprogress
12/21/2022Fire-Resistance Rated ConstructionPaul Raymondprogress
12/21/2022HVAC insulation and sealing Paul Raymondenergy_progress
12/21/2022HVAC and service water heating equipment Paul Raymondenergy_progress
12/21/2022Maintenance informationPaul Raymondenergy_progress
12/21/2022Shutoff dampersPaul Raymondenergy_progress
12/21/2022HVAC and service water heating system controls Paul Raymondenergy_progress
12/20/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/20/2022Sprinkler SystemsPaul Raymondspecial
12/20/2022Standpipe SystemsPaul Raymondspecial
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch9
09/01/2026B00557747-I1Request digital key ↗
08/31/2026B00672610-I1Request digital key ↗
08/29/2026B00760223-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00387930-I1Request digital key ↗
09/02/2026B00387930-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00406245-I1Request digital key ↗
09/02/2026B00406245-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00407251-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00391247-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00443999-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/01/2026B00443999-I1Request digital key ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026B00407251-I1Open ↗
09/02/2026B00406245-P1Open ↗
09/02/2026B00406245-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026B00387930-P1Open ↗
08/28/2026B00387930-P1Open ↗
08/28/2026B00387930-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00443999-P1Open ↗
09/01/2026B00443999-P1Open ↗
09/01/2026B00443999-P1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWFDNY: Letter of No Objection3
09/01/2026B00443999-I1Open ↗
08/13/2026B00443999-I1Open ↗
08/13/2026B00443999-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00387930-I1Open ↗