Mission house (non-residential)
82-61 BEVERLY ROAD
QUEENS · Kew Gardens · BIN 4079489
💬 Discuss this project
1931Year Built
2.75Stories
M2Building Class
R2Zoning
3,375 sfGross Floor Area
1Units
0 Open Violations
Mission house (non-residential) · Owner of record: YESHIVA TIFERETH MOSHE, INC. · 6,500 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 35p · 2 filings · 20 docs
Floor 226p · 4 filings · 20 docs
Floor 126p · 4 filings · 20 docs
Cellar25p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2021$1.6M—Private party → YESHIVA TIFERETH MOSHE, INC.$489/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILD ARCHITECTURE103/27/2026
PAUL CHRISTAKOS ARCHITECTURE903/21/2025
BADALY ARCHITECTS406/05/2024
BADALY ENGINEERING PLLC705/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1203/21/2026
PETER KLEIN ASSOC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMAN CONSTRUCTION CO LLCGeneral Contractor1503/21/2026
T.N.T PLBG & HTG INCFire Protection207/08/2026
BROOK PLUMBING & HTG CORPPlumbing207/08/2026
RAYMOND'S PLBG & HTG LLCPlumbing207/08/2026
BROOK PLUMBING & HTG CORPFire Protection107/08/2026
LOWVOLT TECH ENTERPRISESGeneral Contractor107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL CHRISTAKOS ARCHITECT5894603/21/2025
BADALY ARCHITECT PLLC71371006/05/2024
MARCH CHADWICK, ARCHITECT2253112/07/2021
Building Lifecycle
All (104)Filed (21)Permit Issued (13)Signed Off (5)Violation (12)Inspection (13)Objection (10)Special Inspection (30)
06/30/2026
Signed off — Alteration
Q01375250-I1
06/03/2026
Permit issued — General Construction
Q01375250-I1-GC
03/27/2026
Filed — Alteration
Q01375250-I1
03/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
09/04/2025
Violation issued (ECB, closed)
Construction
04/01/2025
Special inspection requirement — Lighting controls
Paul Christakos
04/01/2025
Special inspection requirement — Interior lighting power
Paul Christakos
04/01/2025
Special inspection requirement — Air barrier - visual inspection
Paul Christakos
04/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Christakos
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Christakos
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Christakos
04/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Christakos
04/01/2025
Special inspection requirement — Fenestration areas
Paul Christakos
04/01/2025
Special inspection requirement — Insulation placement and R values
Paul Christakos
04/01/2025
Special inspection requirement — Fenestration air leakage
Paul Christakos
03/21/2025
Filed — Alteration CO
ALTERATION TO CONVERT PORTION OF EXISTING HOUSE OF WORSHIP ON FIRST FLOOR INTO SCHOOL. NO ENLARGEMENT PROPOSED.
Q00560638-P7
03/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Christakos
03/18/2025
Special inspection requirement — Fenestration areas
Paul Christakos
03/18/2025
Special inspection requirement — Insulation placement and R values
Paul Christakos
03/18/2025
Special inspection requirement — Fenestration air leakage
Paul Christakos
03/18/2025
Special inspection requirement — Air barrier - visual inspection
Paul Christakos
03/18/2025
Special inspection requirement — Interior lighting power
Paul Christakos
03/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Christakos
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Christakos
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Christakos
03/18/2025
Special inspection requirement — Lighting controls
Paul Christakos
02/27/2025
Signed off — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-I1
02/18/2025
Permit issued — Plumbing
Q00571189-I1-EW-SP
12/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/11/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2024
Signed off — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-S2
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2024
Signed off — Alteration
NEW MINI-SPLIT MECHANICAL SYSTEM FOR EXISTING BUILDING
Q00571196-I1
06/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/21/2024
Permit issued — Sprinklers
Q70246467-I1-EW-SP
06/18/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
06/13/2024
Special inspection requirement — Heating Systems
SHAHIN BADALY
06/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
06/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
06/13/2024
Special inspection requirement — Maintenance information
SHAHIN BADALY
06/05/2024
Filed — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-P4
06/05/2024
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
06/05/2024
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
05/30/2024
Filed — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-P3
05/30/2024
Filed — Alteration
NEW MINI-SPLIT MECHANICAL SYSTEM FOR EXISTING BUILDING
Q00571196-P2
05/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/29/2024
Permit issued — Boiler Equipment
Q00571189-S2-BE
05/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2024
Permit issued — Plumbing
Q00571189-I1-PL
04/01/2024
Filed — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-S2
12/13/2023
Signed off — Alteration
PROVIDE NEW STRUCTURAL SUPPORT AT REMOVED BEARING WALLS LOCATIONS.
Q00635946-I1
10/11/2023
Permit issued — Sprinklers
Q00571189-I1-PL
10/11/2023
Permit issued — Sprinklers
Q00571189-I1-EW-SP
09/27/2023
Filed — Alteration
Replacement of existing boiler with combi-boiler.
Q00571189-P2
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLOWVOLT TECH ENTERPRISES06/03/2026
DOB NOWPlumbingSigned-offT.N.T PLBG & HTG INC02/18/2025
DOB NOWSprinklersSigned-offT.N.T PLBG & HTG INC06/21/2024
DOB NOWBoiler EquipmentSigned-offRAYMOND'S PLBG & HTG LLC05/29/2024
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC04/16/2024
DOB NOWSprinklersSigned-offBROOK PLUMBING & HTG CORP10/11/2023
DOB NOWSprinklersSigned-offSHARP PLUMBING CORP10/11/2023
DOB NOWMechanical SystemsPermit IssuedMAMAN CONSTRUCTION CO LLC07/26/2023
DOB NOWFoundationSigned-offMAMAN CONSTRUCTION CO LLC07/26/2023
DOB NOWGeneral ConstructionSigned-offMAMAN CONSTRUCTION CO LLC07/26/2023
DOB NOWPlumbingSigned-offBROOK PLUMBING & HTG CORP09/14/2022
DOB NOWGeneral ConstructionPermit IssuedMAMAN CONSTRUCTION CO LLC03/22/2022
DOB NOWGeneral ConstructionSigned-offMAMAN CONSTRUCTION CO LLC12/29/2021
1 project · most recent 08/09/2022
General Wiring
FiledStatusContractorScope
08/09/2022CompletePAPPAS & FODERA ELECT'LGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
09/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/18/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
03/24/2026FinalNAVEEN KUMARprogress
04/01/2025Energy Code Compliance InspectionsPaul Christakosprogress
04/01/2025Fire-Resistance Rated ConstructionPaul Christakosprogress
04/01/2025Lighting controlsPaul Christakosenergy_progress
04/01/2025Fenestration air leakagePaul Christakosenergy_progress
04/01/2025Insulation placement and R valuesPaul Christakosenergy_progress
04/01/2025Interior lighting powerPaul Christakosenergy_progress
04/01/2025Air barrier - visual inspectionPaul Christakosenergy_progress
04/01/2025Fenestration areasPaul Christakosenergy_progress
04/01/2025Fire-Resistant Penetrations and JointsPaul Christakosspecial
04/01/2025Fenestration and door U-factor and product ratingsPaul Christakosenergy_progress
03/18/2025Interior lighting powerPaul Christakosenergy_progress
03/18/2025Fenestration air leakagePaul Christakosenergy_progress
03/18/2025Lighting controlsPaul Christakosenergy_progress
03/18/2025Fenestration and door U-factor and product ratingsPaul Christakosenergy_progress
03/18/2025Fenestration areasPaul Christakosenergy_progress
03/18/2025Insulation placement and R valuesPaul Christakosenergy_progress
03/18/2025Fire-Resistant Penetrations and JointsPaul Christakosspecial
03/18/2025Energy Code Compliance InspectionsPaul Christakosprogress
03/18/2025Fire-Resistance Rated ConstructionPaul Christakosprogress
03/18/2025Air barrier - visual inspectionPaul Christakosenergy_progress
06/13/2024HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
06/13/2024HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
06/13/2024Maintenance informationSHAHIN BADALYenergy_progress
06/13/2024HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
Latest 25 of 121.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch19
08/26/2026Q00635946-P1Request digital key ↗
08/26/2026Q00635946-I1Request digital key ↗
08/26/2026Q00635946-P3Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026Q00572700-P1Request digital key ↗
08/14/2026Q00572700-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00560638-I1Open ↗
▸Seals & Professional Certifications113
▸DOB NOWProgress Inspector Seal & Signature72
09/25/2026Q00571196-I1Open ↗
09/25/2026Q00571196-I1Open ↗
09/25/2026Q00571196-I1Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/26/2026Q00635946-I1Open ↗
08/26/2026Q00635946-P3Open ↗
08/26/2026Q00635946-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026Q00571196-I1Open ↗
09/20/2026Q00560638-P5Open ↗
09/01/2026Q00571189-P2Open ↗
Showing 3 of 20 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist7
08/13/2026Q00560638-P1Open ↗
08/13/2026Q00560638-P2Open ↗
08/13/2026Q00560638-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00560638-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/26/2026Q00635946-P1Open ↗
08/26/2026Q00635946-I1Open ↗
08/26/2026Q00635946-P3Open ↗
Showing 3 of 18 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00560638-I1Open ↗
08/13/2026Q00571196-I1Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/26/2026Q00571189-P4Open ↗
08/26/2026Q00571189-P1Open ↗
08/26/2026Q00571189-P2Open ↗
Showing 3 of 21 on file for this type
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00560638-I1Open ↗