← Back
Over six families without stores
82 COOPER STREET
BROOKLYN · BIN 3079910
💬 Discuss this project
2024Year Built
—Stories
C1Building Class
R6Zoning
5,323 sfGross Floor Area
8Units
3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 82 COOPER LLC · 2,500 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof2p · 1 filing · 12 docs
Bulkhead1p · 1 filing · 12 docs
Floor 420p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 222p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Cellar21p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
82 COOPER5007/08/2026
MNK ENTERPRISES LLC703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2021$885K—296 HALSEY STREET, INC. → 82 COOPER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.304/09/2025
SION CONSULTING ENGINEERING PC702/12/2025
SH ENGINEERING PLLC309/07/2023
ENTHINK ENGINEERS LLC112/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
SION CONSULTING ENGINEERING P C2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEVEL 10 CONSTRUCTION GR*General Contractor1707/08/2026
DEEP FORMATION INCGeneral Contractor707/08/2026
MNK ENTERPRISES LLCGeneral Contractor303/21/2026
MNK ENTERPRISES NY INCGeneral Contractor303/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781304/09/2025
HRF SERVICES CORP5616802/12/2025
SION CONSULTING ENG. PC1108102/03/2023
Building Lifecycle
All (141)Filed (14)Permit Issued (14)Signed Off (8)Violation (11)Inspection (12)Objection (52)Special Inspection (30)
09/18/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/05/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-S4
08/05/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-S5
08/05/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-S3
06/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/23/2025
Signed off — Alteration
B00818629-I1
05/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-S1
05/15/2025
Signed off — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/DOB NOW JOB #B00755717-I1. INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01041944-I1
04/15/2025
Special inspection requirement — Sprinkler Systems
CHRISTIAN LOZADA
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/09/2025
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/DOB NOW JOB #B00755717-I1. INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01041944-P2
04/08/2025
Signed off — Alteration
B08017533-I1
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Permit issued — Structural
B00818629-I1-GC-CX
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/31/2025
Special inspection requirement — Sprinkler Systems
CHRISTIAN LOZADA
03/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/26/2025
Special inspection requirement — Metering
FAHAD FATEH
02/26/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/26/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Permit issued — General Construction
B00755717-I1-GC-CX
02/12/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-P3
02/03/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/03/2025
Special inspection requirement — Metering
FAHAD FATEH
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/03/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/03/2025
Special inspection requirement — Final
FAHAD FATEH
02/03/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/03/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/03/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/03/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
02/03/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/03/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/03/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/03/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-P2
12/10/2024
Objection resolved — Addressed
12/06/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00804954-I1
12/04/2024
Objection resolved — Addressed
12/03/2024
Objection raised — Cost
09/03/2024
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/DOB NOW JOB #B00755717-I1. INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01041944-P1
08/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2024
Objection raised — Admin
07/15/2024
Permit issued — Sprinklers
B01041944-I1-EW-SP
07/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SUPPORT OF EXCAVATION WORK FILING #B00755717-S5 IN CONJUNCTION WITH GC FILING #B00755717-I1
B00755717-P1
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offLEVEL 10 CONSTRUCTION04/01/2025
DOB NOWGeneral ConstructionPermit IssuedLEVEL 10 CONSTRUCTION02/13/2025
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC07/15/2024
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC04/08/2024
DOB NOWConstruction FenceSigned-offDEEP FORMATION INC02/05/2024
DOB NOWMechanical SystemsPermit IssuedLEVEL 10 CONSTRUCTION01/02/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC12/28/2023
DOB NOWFoundationSigned-offLEVEL 10 CONSTRUCTION11/15/2023
DOB NOWStructuralSigned-offLEVEL 10 CONSTRUCTION11/15/2023
DOB NOWMechanical SystemsPermit IssuedLEVEL 10 CONSTRUCTION11/15/2023
DOB NOWSupport of ExcavationSigned-offLEVEL 10 CONSTRUCTION11/08/2023
DOB NOWConstruction FenceSigned-offDEEP FORMATION INC03/01/2023
DOB NOWStructuralSigned-offDEEP FORMATION INC02/22/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC12/29/2022
1 project · most recent 02/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/12/2025Permit IssuedLEVEL 10 CONSTRUCTION GR*Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×8
RXTQ36TBVJUA,FXMG30TBVJU ,FDMQ24WVJU9 , 36,000 BTU · Vrf Outdoor ×8
Mitsubishi Electric MXZ-2B20NA-1 20,000 BTU · Vrf Outdoor ×8
Ventilation
Delta GBR800LED 150 CFM · Exhaust Fan ×24
Panasonic FV-0510VS1 80 CFM · Exhaust Fan ×24
1 project · most recent 02/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/12/2025Signed-offVILLAGE P & H NY INCStorm, Water/Sanitary
2 projects · most recent 03/31/2025
General Wiring
FiledStatusContractorScope
03/31/2025CompleteA.L. ELECTRICAL CORP.General Wiring
12/29/2022CompleteRICHARD NEU—
1 project · most recent 02/12/2025
Masonry
FiledStatusContractorScope
02/12/2025Permit IssuedLEVEL 10 CONSTRUCTION GR*Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/18/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
04/15/2025Sprinkler SystemsCHRISTIAN LOZADAspecial
04/15/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/31/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/31/2025Sprinkler SystemsCHRISTIAN LOZADAspecial
02/26/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/26/2025MeteringFAHAD FATEHenergy_progress
02/26/2025Maintenance informationFAHAD FATEHenergy_progress
02/26/2025Permanent certificateFAHAD FATEHenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/26/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/26/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/03/2025MeteringFAHAD FATEHenergy_progress
02/03/2025Exterior lighting powerFAHAD FATEHenergy_progress
02/03/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/03/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
02/03/2025Maintenance informationFAHAD FATEHenergy_progress
02/03/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/03/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/03/2025FinalFAHAD FATEHprogress
02/03/2025Mechanical SystemsFAHAD FATEHspecial
02/03/2025Heating SystemsFAHAD FATEHspecial
02/03/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/03/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
02/03/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 109.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/28/2026B00804954-I1Request digital key ↗
08/27/2026B00818629-I1Request digital key ↗
08/27/2026B08017533-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
01/26/2024340868412Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)3
08/26/2026B00755717-P1Open ↗
08/15/2026B00755717-I1Open ↗
08/13/2026B00755717-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00755717-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00755717-I1Open ↗
09/01/2026B00755717-I1Open ↗
09/01/2026B01041944-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026B00818629-I1Open ↗
08/27/2026B08017533-I1Open ↗
08/26/2026B00755717-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00755717-I1Open ↗
09/01/2026B00755717-I1Open ↗
09/01/2026B00755717-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/26/2024340868412Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/15/2023340868412Open ↗
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
01/26/2024340868412Open ↗
▸BISSTREET TREE CHECKLIST1
01/26/2024340868412Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00755717-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00755717-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00755717-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026B00818629-I1Open ↗
08/26/2026B00755717-P1Open ↗
08/25/2026B01041944-P1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00755717-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00755717-S5Open ↗
08/13/2026B00755717-S3Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00755717-S5Open ↗
08/13/2026B00755717-S3Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/22/2025340868412Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/15/2023340868412Open ↗
▸BISADDITIONAL INFORMATION1
01/26/2024340868412Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION3
07/22/2025340868412Open ↗
01/26/2024340868412Open ↗
01/26/2024340868412Open ↗
▸DOB NOWSite Survey: Initial3
08/26/2026B00755717-P1Open ↗
08/15/2026B00755717-I1Open ↗
08/13/2026B00755717-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00755717-P1Open ↗
08/15/2026B00755717-I1Open ↗
08/13/2026B00755717-P2Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00755717-S3Open ↗
08/13/2026B00755717-S5Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00818629-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00755717-I1Open ↗