← Back
One family attached or semi-detached
82 GREENWAY TERRACE
QUEENS · BIN 4078328
💬 Discuss this project
1925Year Built
2.75Stories
A5Building Class
R3-2Zoning
4,411 sfGross Floor Area
1Units
One family attached or semi-detached · 3,255 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 31p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 13p · 2 filings · 20 docs
Basement3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2019$2.7M—Private party → Private party$613/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2LS CONSULTING ENGINEERING, DPC904/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URBAN BUILDERS GROUP LTDGeneral Contractor403/21/2026
PAL-MAR PLBG & HTG INCPlumbing407/08/2026
INTER CONNECTION ELETRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN402904/04/2023
Building Lifecycle
All (41)Filed (9)Permit Issued (6)Signed Off (2)Objection (12)Special Inspection (12)
04/20/2023
Signed off — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-I1
04/04/2023
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P6
03/16/2023
Permit issued — Plumbing
Q00274467-I1-PL
02/28/2023
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P5
01/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
09/01/2022
Permit issued — Plumbing
Q00274467-I1-PL
08/17/2022
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P4
08/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
06/24/2022
Objection resolved — Addressed
06/15/2022
Objection raised — Scope
06/14/2022
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P3
04/20/2022
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P2
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
04/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
03/16/2022
Signed off — Alteration
Includes providing new split system air conditioning units to serve the residential building. Condensing units will be located on the roof with the indoor AC units located in each of the various rooms. The heating systems will not be modified.
Q00274470-I1
01/18/2022
Special inspection requirement — Mechanical Systems
Jeffrey Stones
01/18/2022
Special inspection requirement — Final
Jeffrey Stones
01/18/2022
Special inspection requirement — HVAC insulation and sealing
Jeffrey Stones
01/13/2022
Filed — Alteration
Includes providing new split system air conditioning units to serve the residential building. Condensing units will be located on the roof with the indoor AC units located in each of the various rooms. The heating systems will not be modified.
Q00274470-P1
01/13/2022
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-P1
07/14/2021
Special inspection requirement — HVAC insulation and sealing
Jeffrey Stones
07/14/2021
Special inspection requirement — Final
Jeffrey Stones
07/14/2021
Special inspection requirement — Mechanical Systems
Jeffrey Stones
06/27/2021
Permit issued — Plumbing
Q00274467-I1-PL
02/03/2021
Permit issued — Mechanical Systems
Q00274470-I1-MS
10/16/2020
Permit issued — Mechanical Systems
Q00274470-I1-MS
08/20/2020
Permit issued — Plumbing
Q00274467-I1-PL
02/12/2020
Objection raised — Energy
02/12/2020
Objection resolved — Addressed
02/12/2020
Objection raised — Inspections
02/12/2020
Objection resolved — Addressed
02/12/2020
Objection raised — Scope
02/12/2020
Objection resolved — Addressed
02/12/2020
Objection raised — Other
02/12/2020
Objection resolved — Addressed
02/12/2020
Objection raised — Inspections
02/12/2020
Objection resolved — Addressed
02/07/2020
Filed — Alteration
Disconnection and removal of plumbing fixtures, trim, hardware, and associated piping from walls/floor. Plumbing work. There is to be no change of use, occupancy, or egress.
Q00274467-I1
02/07/2020
Filed — Alteration
Includes providing new split system air conditioning units to serve the residential building. Condensing units will be located on the roof with the indoor AC units located in each of the various rooms. The heating systems will not be modified.
Q00274470-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC03/16/2023
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC09/01/2022
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC06/27/2021
DOB NOWMechanical SystemsSigned-offURBAN BUILDERS GROUP LTD02/03/2021
DOB NOWMechanical SystemsSigned-offURBAN BUILDERS GROUP LTD10/16/2020
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC08/20/2020
BISOTISSUEDURBAN BUILDERS GROUP LTD03/18/2020
1 project · most recent 07/27/2022
General Wiring
FiledStatusContractorScope
07/27/2022CompleteINTER CONNECTION ELETRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/10/2023Fire-Resistance Rated ConstructionJeffrey Stonesprogress
01/10/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/16/2022Fire-Resistance Rated ConstructionJeffrey Stonesprogress
08/16/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
04/11/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
04/11/2022Fire-Resistance Rated ConstructionJeffrey Stonesprogress
01/18/2022Mechanical SystemsJeffrey Stonesspecial
01/18/2022FinalJeffrey Stonesprogress
01/18/2022HVAC insulation and sealing Jeffrey Stonesenergy_progress
07/14/2021HVAC insulation and sealing Jeffrey Stonesenergy_progress
07/14/2021FinalJeffrey Stonesprogress
07/14/2021Mechanical SystemsJeffrey Stonesspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing7
08/26/2026Q00274467-P6Request digital key ↗
08/26/2026Q00274467-P5Request digital key ↗
08/26/2026Q00274467-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026Q00274470-I1Request digital key ↗
08/15/2026Q00274470-P1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
02/22/2023421941215Open ↗
10/28/2022421941215Open ↗
04/15/2021421941215Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
03/20/2020421941215Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00274467-I1Open ↗
08/26/2026Q00274467-P1Open ↗
08/26/2026Q00274467-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00274467-P4Open ↗
08/30/2026Q00274467-P2Open ↗
08/25/2026Q00274467-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q00274467-P4Open ↗
08/30/2026Q00274467-P2Open ↗
08/25/2026Q00274467-P5Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/06/2019421941215Open ↗
12/06/2019421941215Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/06/2019421941215Open ↗
12/06/2019421941215Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026Q00274467-P5Open ↗
08/26/2026Q00274467-P4Open ↗
08/26/2026Q00274467-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/06/2019421941215Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/19/2023421941215Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/19/2023421941215Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/19/2023421941215Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/06/2019421941215Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/30/2021421941215Open ↗
07/29/2020421941215Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/29/2022421941215Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/19/2023421941215Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/29/2022421941215Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL1
04/19/2023421941215Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/23/2020421941215Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/20/2023421941215Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
08/20/2020421941215Open ↗
12/06/2019421941215Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/29/2022421941215Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
03/13/2023421941215Open ↗
04/30/2021421941215Open ↗
07/29/2020421941215Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
12/06/2019421941215Open ↗